Forwards Rev 97-3 to Catawba Nuclear Station Emergency Plan. Summary of Changes & Bases for Determination Provided as Attachment 1.All Changes Have Been Specifically Highlighted to Facilitate Review
ML20217H033
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/23/1997
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217H037 List:
References
NUDOCS 9708080180
Download: ML20217H033 (14)


Text

.11.

l vake her Corrmany (MDUIJ000 Catauha Nuclear Station 4M0 Conadd Road l

Jurh,5C19145 DUKEPOWER l

July,23, 1997 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.

20555

SUBJECT:

Catawba Nuclear Station Docket Nos.:

50-413 and 50-414 Emergency Plan, Revision 97-3 Dear Sir Enclosed for NRC staff use and review is Revision 97-3 to the Catawba Nuclear Station Umergency Plan. -This revision is offective on the date of opproval.

This revision is being submitted in accordance with 10CFR50.54(q) and does not decrease the effectiveness of the Emergency Plan.

A summary of the changes and bases for this determination is l

provided as Attachment 1.

All changes have been specifically l

highlighted (side-barred) to facilitate review.

Two copies of this letter are being provided to the NRC Region II l

Regional Administrator.

I Sincerely, l

G. R.

Peterson

)

Vice President Attachments:

1 - Change Summary 2 - Emergency Plan Revision 97 10CFR50.54 (q)

Evaluation 3 - Plan Update Instructions 4 - Plan Changes 9708080180 970723 PDR -ADOCK 05000413

..$.$h.

rifMJ On %WkMfigW

o, l

  • U. S. Nuclear Regulatory Commission July 23, 1997 Page Two xc w/2 copies of attachment

.Mr.LL. A. Reyes, Regional Administrator U. S. Nuclear Regulatory-Commission Region II 61 Forsyth Street,-S. W.

Suite 23T85 Atlanta, GA 30303 w/o attachment

-NRC Resident Inspector-Catawba-Nuclear Station Saluda River Electric Corporation P. O.-Box 929 Laurens, SC 29630 North Carolina Municipal Power Agency No. 1 P. O. Box 29513 Raleigh, NC 27626-0513 NC Electric Membership Corporation 3333 1.srth Blvd.

P. O. Box-27306

-Raleigh, NC ~27611 Piedmont Municipal Power Agency 121 Village Drive

-Greer, SC 29651 S. R. Christopher M.

S. Kitlan (CN01RC)

Electronic Licensing Library (EC050)-

CN-750.25 1

h

Cataw ha Nuclear Station j

1:mergency Plan Resision 97.4 Attachinent I Cathwha Nuclear Station Emergency Plan Resislon 97 3 is being submitted in accordance with 10CFR50.54hi)imd does not decrease the etrectiseness of the Catawha Nuclear Station Emergency Plan. The Catawha Nuclear Station Emergency Plan as resised will continue to meet the standards of 10CFR50.47(h) and the requirements of 10CFR50 Appendix E. The bases for this determination are contained in Attachment 2 and are as follows:

TAlli.E OF CONTENTS No changes.

l.IST OF FIGURES. TAIll.ES. NITACil51ENTS No changes.

INTRODUCTION No changes.

SECTION A ASSIGNNIENT OF RESPONSiltll.lTY l

No changes.

SECTION 11. SITE ENIERGENCY ORGANIZATION

}

1.

Page B 7. Figure B 1 Add "l**" to the On Shift column for Dose Assessment on page B 7 in Figure B 1. This resision reflects the commitment to re establish on shift dose assessment by August 1,1997.

4 2.

Page B 7 Figure B 1 Relocate "TSC" from the Position, Title or Expertise column to the 45 minute column for Dose Assessment on page B 7 in Figure B 1. This revision clearly indicates that on-shift dose assessment may be performed in a location other than the TSC.

1, SECTION C. ENIERGENCY gisiPONSE SUPPORT AND RESOURCES 1

No changes.

SECTION D. ENIERGENCY Cl.ASSIFICATION SYSTEN!

No changes.

SECTION E. NOTIFICATION NIETilODOI.OGY No changes.

Page I of 4

Catauha Nuclear Station I'mergency Plon Hesision 97 3 Attadunent I SE(' TION F. ENIERGENCY CONINil1NICATIONS No changes.

SECTION G. PI'lli.IC EDl' CATION AND INFORNI ATION No changes.

SECTION II. ENIERGENCY FACil.ITIF.S AND EOl'IPNIENT No changes.

Sl?CTION I ACCIDENT ASSESSNIENT 1.

Page 12, Section 1.3all.3h, First Sentence Add "26" to the list of piocedures in the first sentence of Section 1.3.a/1.3.b on page 12.

This revision reflects the procedure used to perfoim on shift dose assessment.

2.

Page 12 Section 1.5, Second Sentence Add "the Emergency Response Data System (ERDS)," to the second sentence of Section 1.5 on page 12. This revision reDects that ERDS provides meteorologicalinformation to the NRC.

SECTION J PROTECTIVE RESPONSE No changes.

SECTION K RADIGI.OGICAl, EXPOS 11RE CONTROI, No changes.

SECTION I,. NIEDICAI, AND Ptilli.lC llEAI Til SIIPPORT No changes.

SECTION N1. RECOVERY AND REENTRY Pl.ANNING AND POST ACCIDENT OPERATIONS 1.

Page 51 1 Section h1.1, Third Sentence Add "and llP/0/B/1009/001,' Radiation Protection Recovery Plan /" to the third sentence of Section N1 l on page ht l. IIP /0/B/1009/001 is a procedure used by Radiation Protection during the recovery / reentry phase to implement Section hl.

SECTION N. EXERCISES AND DRII I.S No changes.

Page 2 of 4

Catawha Nuclear Statlun l{niergency Plan Resision 97 3 Attachnient 1 SE(' TION O R ADIGI.OGICAI, ENIF.RGENCY RESPONSE TR AINING No changes.

)

Sl?PTION P. RESPONSlHil.lTY FOR Tile PI,ANNING EFFORT l.

Page P 4, Figure P 2 Delete "RP/0/A/5000/17, Erneigency Response Data System Operation Section I" from page P-4, Detailed instructions for operation and troubleshooting the new ERDS software has been incorporated into appropriate Control Room and TSC EPIPs.

2.

Page P 4, Figure P 2 Revise the title of RP/0/A/5000/020 to " Technical Support Center (TSC) Activation Procedure"in Figure P 2 on page P-4. This revision reneets the new title for this procedure.

3.

Page P-4, Figure P-2 Revise the title of RP/0/A/500()/021 to "The Emergency Operations Facility (EOF)

Activation Procedure" in Figure P-2 on page P-4. This revision reflects the new title for this procedure.

4.

Page P 5 Figure P 2 Add " IIP /0/B/1009/026, On Shift Off Site Dose Projections, Section D, I" to Figure P 2 on page P 5. This revision redects the addition of a new procedure for on-shift dose assessment.

APPENDIX 1 DEFINITIONS No changes.

APPENDIX 2. NIETEORGI.OGICAI, PROGRANI No changes.

APPENDIX 3. Al,ERT AND NOTIFICATION SYSTENI DESCRIPTION No changes.

APPENDIX 4. EVACUATION TINTE ESTINIATES No changes.

Page 3 of 4

Cet::nlia Nuclear SI:t;on I mergency I'l n Resision 97 3 Att:chinent i APPENDIX 5. AGRimNil:NT IEITICRS 1.

Agreement Letter No.12 Replace Agreement Letter No.12 (Doli Savannah Rivei) dated July 14.1994, with the new Agreement Letter No.12 dated N1ay 7.1997. This revision provides the latest agreement letter.

8 Page 4 Of 4

Cetzw hs Nucle:r St: tion i

Emergency Pl:n Re51slon 97 3 Att:chment 2 EP Group Manual 5.1.4.2 Page 1 of 5 l

J CATAWBA NUCLEAR SITE i

10CFR50.54 (q) EVALUATION CHECKLIST I

Emeroency Plan Revision: 97 3 SECTION 1 1

Does the Emergency Plan change decrease the effectiveness of the Emergency Plan resulting in the loss of reasonable assurance that adequate protection can and will be taken in the event of a radiological emergency as required by 100FR50.47(a)?

YES X

NO Justification for Answer:

Catawba Nuclear Station Emergency Plan Revision 97 3 contains the following categories of revisions. Note: These revisions are described in detailin Attachment 1, 1.

Increase the number of RP Technicians on shift from 2 to 3 due to the addition of on shift dose assessment responsibilities, 2.

Added references for the new on shift dose assessment procedure.

3.

Added ERDS as a source of meteorologicalinformation available to the NRC.

i 4.

Added a reference to the Radiation Protection procedure used for recovery / reentry operations.

5.

Revised listing of EPIPs to provide current procedures and titles.

6.

Added updated DOE Savannah River Agreement Letter.

The changes described above do not have an adverse impact on the ability of Catawba or any off site-agencies to reasonably assure that adequate protection can and will be taken in the event of a radiological emergency; therefore, these changes are not considered to decrease the effectivensss of the Emergency Plan.

4

.-e

-,n,--n,,=wn-u a.,,.. - = -

,,,-,m>.,,

Cetzuhm Nucle:r St tion Emergency Pl:n Resision 97 3 Attrchment 2 EP Group Manual 5.1.4.2 Page 2 of 5 CATAWBA NUCLEAR SITE I

10 CFR 50.54 (q) EVALUATION CHECKLIST SECTION 2 Does the Emergency Plan change result in the loss of ability to meet the any of the standards described in 10CFR50.47(b) or the requirements described in 10CFR50 Appendix E or any NRC l

approved alternatives to those standards and requirements?

YES

-X NO Justification for Answer:

(The following questions summarize the standards and requirements found in 10CFR50.47(b) and-

- 10CFR50 Appendix E and should be used to support Section 2. Yes answers to any of the following

_ questions should be fully explained as to why the Emergency Plan change does not result in the loss of the ability to meet the standard or requirement.)

10CFR50.47 (b) Review Does this change affect any of the following subject areas of 10 CFR 50.47(b)?

1.

Assignment of ERO responsibilities Yes X

No 2.

Assignment of on shift ERO personnel X

Yes No 3.

Arrangement for utilizing State or local resources and staff Yes X

No

__4. - EALs Yes X

No 5.

Notifications to off site agencies, the ERO or the public Yes

-X No 6.

Commun! cations between off site agencies, the ERO, or the public X

Yes No 7.

Dissemination of public information Yes X

No 8.

Adequacy of emergency facilities and equipment Yes X

No 9,

Methods, systems, and equipment for off site response to a Yes X

No radiological emergency

10. Protective Action Recommendations / Determination Yes X

No

11. Emergency Worker radiological control Yes X

No

12. Medical services for contamination injured personnel Yes X

No

13. Re entry / Recovery plans X

Yes No

14. Drills and exercises Yes X

No

15. Radiclogical emergency response training Yes X

No

16. Plan development, review and distribution

-Yes X

No Question 2 was answered Yes because Emergency Plan Revision 97 3 re estabiishes on shift dose assessment capability. The on shift complement of Radiation Protection Technicians has been increased from 2 to 3 to reflect this additional on-shift responsibility. This revision does not decrease the effectiveness of the Emergency Plan.

Cet:nha Nucle:r St: tion Emergency l*lin Rniston 97 3 Attrchment 2 EP Group Manual 5.1.4.2 Page 3 os 5 CATAWBA NUCLEAR SITE 10 CFR 50.54 (q) EVALUATION CHECKLIST SECTION 2 (cont.)

Question 6 was answered Yes because Emergency Plan Revision 97 3 states that meteorologicalinformation is available to the NRC through ERDS. This revision does not decrease the effectiveness of the Emergency Plan, i

Question 13 was answered Yes because Emergency Plan Revision 97 3 provides a reference to the Radiation Protection procedure for recovery / reentry operations.

All other revisions are editorial and do not decrease the effectiveness of the Emergency Plan.

10CFR50. Appendix E Review Does this change effect any of the following subject areas of 10 CFR 50, Appendix E?

(i)(ii)(iii) Emergency plans as desenbed in the FSAR Yes X

No (iv) A. Organization for coping with radiological emergencies X

Yes No (iv) 8. Assessment of radiological emergencies X

Yes No (iv) C. Classifications, EALs and ERO activation Yes No (iv) D. Notification of Federal, State and local agencies and the public Yes X

No (iv) E. ERFs, equipment, and communications Yes X

No (iv) F. Training, drills, and exercises Yes X

No (iv) G. Plans and procedures and surveillance of equipment and supplies Yes X

No (iv) H. Re entry and Recovery following an accident X

Yes No 10CFR50 Appendix E (iv) A discusses the organization used to cope with a radiological emergency. Emergency Plan Revision 97-3 includes the addition of one on-shift Radiatic.,'1 Protection Technician to perform on shift dose assessment. This revision does not decrease the effectiveness of the Emergency Plan.

10CFR50 Appendix E (iv) B describes the requirements for dose assessment. Emergency Plan Revision 97 3 includes the re establishment of on shift dose assessment. This revision does not decrease the effectiveness of the Emergency Plan.

10CFR50 Appendix E (iv) H discusses the requirements for recovery /reentty operations following an accident. Emergency Plan Revision 97 3 provides a reference to the Radiation Protection recovery / reentry operations procedures. This revision does not decrease the effectiveness of the Emergency Plan.

Cetzwhs Nucirer St tion 2

l Emergency I'l n Regision 974 2

Att:chment 2 i

i EP Group Manual 5.1.4.2 Page 4 of 5 CATAWBA NUCLEAR SITE l

10 CFR 50.54 (q) EVALUATION CHECKLIST SECTION 2 (cont.)

10CFR50 Appendix E (iv) E discusses the requirements for communications from t

i the emergency response facilities. Emergency Plan Revision 97-3 includes the ERDS system as a source of meteorologicalinformation available to the NRC. This j

revision does not decrease the effectiveness of the Emergency Plan.

All other revisions are editorial and do not decrease the effectiveness of the Emergency Plan.

Y 9

4 P-'

-m

'-LT r

e w

m-r

-r

-r--zwr-rw-4

--+v

++--s-*-*-

re m-t v-M

  • --*---r

r-e-m-e-*

Cettu bm Nucle:r St: tion Ernergency Plzn Resiston 97 3 Att:chment 3 EP Group Manual 5.1.4.2 Page 5 of 5 CATAWBA NUCLEAR SITE 10 CFR 50.54 (q) EVALUATION CHECKLIST SECTION 3 Does the Emergency Plan change delete or contradict any regulatory requirement?

YES X,,NO Justification for Answer:

Emergency Plan Revision 97 3 complies with all regulatory requirements and does not delete or contradict with any regulatory requirement.

Attach additional pages as required.

Prepared By: IN N

Date:

22/s) 7/25/97 k

Date:

Reviewed By:

(

~4

(

CATAWBA NUCLEAR STATION EMERGENCY PLAN REVISION 97 3 ATTACHMENT 3 UPDATE INSTRUCTIONS PAGE 1 of 3-Replace Revision 97 2 Cover Sheet with Revision 97 3 Cover Sheet Table of Contents No Changes List of Figures. Tables, Attachments No Changes Introduction l

No Changes Tab A - Assignment of Responsibility No Changes i

Tab B. Onsite Emergency Organization Replace page B 7 Tab C Emergency Response Support & Resources No Changes Tab D - Emergency Classification System No Changes Tab E - Notification Methods & Procedures No Changes Tab F Emergency Cominonications No Changes Tab G - Public Education & Information No Changes

Upd:t]Instructl:ns Page 2 of 3 Tab H Emergency Facility & Equipment No Changes Tabi Accident Assessment Replace Page 12 Tab J Protective Response No Changes Tab K Radiological Exposure Control No Changes Tab L Medical & Public Health Support No Changes Tab M Recovery & Re-entry Planning Replace page M 1 Tab N Exercises & Drills No Changes Tab o Radiological Emergency Response Training No Changes Tab P Development, Periodic Review & Distribution of Emergency Plans Replace pages P 4 P5

. Tab Q Appendices Appendix 1 Definintions No Changes Appendix 2 - Meteorological Systems No Changes

Upd t] Instructions Page 3 of 3 Appendix 3 Alert & Notification System No Changes Appendix 4. Evacuation Time Estimates No Changes Appendix 5. Agreement Letters Replace Agreement Letter No.12