l 9
I o
E M,
~
C.
.=
Log # TXX 98120 File # 916 (3/4.8) l 1l9 ELECTRIC 10010 c.L
- c. arry
. s,aior vie, emis,.,
April 23, 1998
& PrincipalNuclear Officer U. S. Nuclear Regulatory Commissicn Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 CONFIRMATION OF COMPLETION OF TESTING REF:
1.
TU Electric Letter, logged TXX-98107, from C. L. Terry to the NRC dated April 9, 1998 2.
TV Electric Letter, logged TXX-98116, from C. L. Terry to the NRC dated April 7, 1998 3.
NRC letter from John N. Hannon to C. L. Terry dated April 10, 1998 Gentlemen:
In references 1 and 2, TU Electric stated that testing of Unit 1 Train A lockout relays and contacts was scheduled for completion by April 17, 1998 (Train B had already been tested).
It was also stated that certain Unit 2 contacts that perform a load shed function and other Unit 2 contacts that ensure that non emergency diesel generator trips do not trip a diesel generator operating in the emergency mode, would be tested at power by April 16, 1998.
The purpose of this letter is to confirm that the above Unit 1 and Unit 2 testing was successfully completed by the dates indicated.
\\0 i
9804290155 980423 PDR ADOCK 05000445 P
PDR COMANCHE PEAK STEAM ELECTRIC STATION
,, a v P.O. Box 1002 Glen Rose. Texas 76043 1002
-TXX-98120 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
Sincerely.
6.L. %wy C. L. Terry
@ b, By:
~
Roger D. Walker
- '# ^ ' "*"***'
BSD/bd c.-
E. W. Herschoff Region IV J. I. Tapia Region IV T. J. Polich NRR Resident Inspectors. CPSES l:
l L