Forwards Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407 & NOV Re Failure to Verify That Workers Electronic Dosimetry Was on Prior to Beginning Work on SG Platforms During Last Unit 2 Outage
ML20217F521
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/21/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20217F526 List:
References
50-456-98-06, 50-456-98-6, 50-457-98-06, 50-457-98-6, NUDOCS 9804280186
Download: ML20217F521 (3)


See also: IR 05000456/1998006

Text

p.

..

April 21, 1998

l

' Mr. Oliver D. Kingsley

i

President, Nuclear Generation Group I

Commonwealth Edison Company -

ATTN: Regulatory Services.

Executive Towers West lli

.1400 Opus Place, Suite 500

Downers Grove,IL 60515

'~

SUBJECT: NRC ROUTINE RADIATION PROTECTION INSPECTION REPORTS

'

50-456/98006(DRS); 50-457/98006(DRS) AND NOTICE OF VIOLATION

Dear Mr. Kingsley: .

I

t

On April 7,1998, the NRC completed an inspection at your Braidwood Generating Station,

Units 1 and 2. The enclosed report presents the results of that inspection.

l 1

The inspection was an examination of activities conducted under your license as they relate to

radiation safety and to compliance with the Commission's rules and regulations and with the

conditions of your license. Within these areas, the inspection consisted of selective

i

examinations of procedures and representative records, interviews with personnel, and

l - observation of activities in progress.' .Specifically, the inspection focused on your liquid and

i gaseous effluent, and radiation monitoring programs.

l Overall, your staff properly implemented the liquid and gaseous effluent and radiation

1

monitoring programs. The total releases for the Braidwood station for 1996 and 1997 were

l below regulatory limits.and there were no abnormal or unmonitored releases. The radiation'-

.

monitoring instrumentation was well maintained and setpoints were established and set in

accordance with station procedures.

1 However, one violation of NRC requirements was identified, as specified in the enclosed Notice l

'

of Violation (Notice). The violation concemed the failure to verify that a workers electronic

dosimetry was on prior to beginning work on the steam generator platforms during the last Unit

.

2 outage.- This violation is of concem because there were several opportunities to identify that j

l the dosimetry was not on. Neither radiation protection technicians nor the worker himself /

verified that the dosimetry was tumed on. In addition, the radiation protection technicians

L

' responsible for monitoring the dosimetry via computer, failed to summon the worker back from

/ ,

,

the platform to determine why there was no computer display from the worker's dosimetry.  !

The NRC has concluded that information regarding the reason for the violation, the corrective .

e actions taken and planned to correct the violation and prevent recurrence, is already adequately 80  ;

addressed in the subject inspection report. Therefore, you are not required to respond to this

.1

I

9804280186 980421 -

PDR ADOCK 05000456

G PDR

l

.

y j

O

.

O. Kingsley 2

violation unless the description of the problem as described in the inspection report does not

accurately reflect your corrective actions or your position. In that case, or if you choose to

provide additional information, you should follow the instructions specified in the enclosed

Notice.

In accordance with 10 CFR 2.790 of the NRC'S " Rules of Practice," a copy c.i this letter, the

enclosures, and your response to this letter will be placed in the NRC Public Document Room

(PDR).

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

original signed by J. A. Grobr

John A. Grobe, Director ,

Division of Reactor Safety

Docket Nos. 50-456; 50-457

License Nos. NPF-72; NPF-77

Enclosures: 1. Notice of Violation

2. Inspection Reports 50-456/98006(DRS); 50-457/98006(DRS)

cc w/encls: M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

I. Johnson, Licensing Director

DCD - Licensing

T. Tulon, Site Vice President

Braidwood Station Manager  ;

T. Simpkin, Regulatory 1

Assurance Supervisor

Richard Hubbard l

Nathan Schloss, Economist  ;

Office of the Attomey General I

State Liaison Officer

Chairman, Illinois Commerce l

Commission i

DOCUMENT NAME: G:DRS\ BRA 98006.DRS:

T. r.ew. . em oe nii. e eu,n.,w. iiaiem iri nie i,oo c - em eaut en.*n.nnaciow. r . cm e on.*nenvencio a. er . se ew

OFFICE Rill l6 Rlli l6 Rlli a 9 Rlli ,,a

NAME DNissen:jp M L GShear /W14, MJordan Qh% JGrobe/K

"'

DATE 04%/98 04//4/98 U 04/ 6 98 04/3/98I  ;

OFFICIAL RECORD COPY l

,

e

I

-D

O. Kingsley 3

Distribution:

SAR (E-Mail)

Project Mgr., NRR w/encls

A. Beach w/encls

J. Caldwell w/encis

B. Clayton w/encls

SRI Braidwood w/encls

DRP w/encis

TSS w/encls -

DRS w/encls

Rill PR. w nels

PUBLIC 1 wlencia l

' Docket ile w/encls j

GREENS l

IEO (E-Mail)

DOCDESK (E-Mail)

,

2800,30

1

1

- -