ML20217F051
| ML20217F051 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 09/25/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gipson D DETROIT EDISON CO. |
| Shared Package | |
| ML20217F054 | List: |
| References | |
| 50-341-97-10, NUDOCS 9710070357 | |
| Download: ML20217F051 (3) | |
See also: IR 05000341/1997010
Text
_ _ _ _ _ . . . _ . . _ _ _ ~ _ _ __. ___
_
- _ _ _ _ _ . - . _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ , . . _
- "% g?g
t
UNITED STATES
h
.
NUCLEAR GECULATCRY COMMISSION
y
j
REoloN lli
e
Y
4 e
a01 WARRENVILL E RoAo
\\* * . . . * *,8
USLE. ILUNots 60532-4351
September 25, 1997
Mr. D. R. Gipson
Senior Vice President
Nuclear Generation
The Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT:
NRC INSPECTION REPORT ND, 50 341/97010(DRP)
.
Dear Mr. Glpson:
On August 12,1997, the NRC completed an inspection at your Fermi 2 reactor facility.
The enclosed report presents the results of that inspection.
During the 6 week period covered by this inspection, the plant was operated weil and
continued improvements were noted in the areas of operations and maintenanco. We
acknowledge the efforts your staff took to identify the cause of reactor fuel damage over
the last three fuel cycles; however, we are concerned that foreign material was the cause
of those failures. Concerns with foreign material exclusion at your facility have been
identified in the past. We will continue to monitor your staff's efforts to improvo
perfortnance in this area and prevent futuro equipment failures,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure, and your response will be placed in the NRC Public Document Room.
Sincerely,
fV
2/Y
h
.
))
Geof frey E. Grant, Director
Division of Reactor Projects
Docket No. 50 341
License No. NPF-43
Enclosure:
Inspection Report
No, 50 341/97010(DRP)
cc w/oncl:
N. Potorson.
Supervisor of Complianco
P. A, Marquardt, Corporate
Legal Department
James R. Pad ott, Michigan Public
0
Servico Commission
'a n b O 01
ichigan Department of
7'fj \\
'
M
0
Environmental Quality
Monroe County, Emergency
Management Division
9710070357 970925
h!!
ADOCK 05000341
'
G
.
_ . _ . _ _ _ _
--
___
,
i
!
!
!
,
September 26, 1997
!
)
Mr. D. R. Gipson
[
Senior Vice President
l
Nuclear Generation
!
The Detroit Edison Company
6400 North Dixie Hi hway
9
.
J
Newport, MI 48166
SUBJECT:
NRC INSPECTION REPORT NO. 50 341/97010(DRP)
,
,
Dear Mr. Gipson: -
'
,
)
On August 12,1997, the NRC completed an inspection at your Fermi 2 reactor facility.
The enclosed report presents the results of that inspection.
i
!
During the 6 week period covered by this inspection, the plant was operated well and
-
continued improvements were noted in the areas of operations and maintenance. We
acknowledge the efforts your staff took to identify the cause of reactor fuel damage over
.
,
t
!
the last three fuel cycles; however, we are concerned that foreign material was the cause
of these failures. Concerns with foreign material exclusion at your facility have been
Identified in the past. We will continue to monitor your staff's efforts to improve
performance in this area and prevent future equipment failures.
,
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter -
1
nd its enclosure, and your response will be placed in the NRC Public tiocument Room.
Sincerely,
+
!
/s/ Marc L. Dapas for
.
t
,
.
Geoffrey E. Grant, Director
Division of Reactor Projects
t
i
Docket No. 50 341
License No. NPF 43
,
T
Enclosure: -
Inspection Report
No. 50 341/97010(DRP)
'
See attached distribution
'
Document: R:\\lnsprpts\\ powers \\ferm\\fer97010.drp
To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci
j
"E" = Copy with attach /enct "N" = No copy
'
'
OFFICE
Rlli .
Rill
Rlll
NAME
DuPdnt:b7
M dn V
Grant ///[k
,
i
DATE-
09/E797
09FF97
09#g97
l
j
OFFICIAL RECOR0 COPY
_
y
w--y*as
+
yv
wuy
w"T'J'#
9*W'9'NT
T't
Y
"'"F-W7W^1
NWT9T--
W
t4-WW' Mf' D "*t'V W WW W T
94
TI "SM*'WWW "I T W'
FMMM *'89Ptn'
"M'W2-N-WNm7'M+tt*k"T*"W"Nft T*'
?
^
..
. .
_ _.
___ _ . _
_ .
__. . _ __. _ ___ _ _ _ _ _ _ _ _ .___
_ _ . . _ .. ._ . _ _.
,
!
4
i
D. R. Gipson
2-
-
)
Distribution;
,
cc w/ encl:
N. Peterson,
,
Supervisor of Compilance
'
!
P. A. Marquardt, Corporate
Legal Department
-
James R. Padgett, Michigan Public -
Service Commission
Michigan Department of
4
Environrnental Quality
Monroe County, Emergency
'
Management Division
Docket File w/enct
Project Manager, NRR w/ encl
PUBLIC IE 01 w/ encl
DRP w/ encl
_
OC/LFDCB w/enci
-Rlli PRR w/ encl
4
i-
SRI Fermi w/enci
A. B. Beach w/ encl
c
Rlli Enf Coordinator w/ encl
Deputy RA w/enci
CAA1 w/enci (E Mail) .
TSS w/ encl
a
.
DRS w/enci (2)
DOCDESK (E mail)
>
1
h
,
!
4
h
...,7
-
v.r_
. - , - _ .
y
g-.,
, , , . ,, - . . . . , , .
,,...,,,..,_,y-,,--_,-y,
,y,
, - - .
. . .
...-~,r-
-~. .
y.,,,