ML20217E568

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/98-01 & 50-364/98-01 on 980111-0221 & NOV Re Examples of Inadequate Use of Radiological Contamination Controls During Performance of Maint
ML20217E568
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/23/1998
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20217E575 List:
References
50-348-98-01, 50-348-98-1, 50-364-98-01, 50-364-98-1, NUDOCS 9803310079
Download: ML20217E568 (4)


See also: IR 05000348/1998001

Text

I

i

March 23, 1998

l

Southern' Nuclear Operating Company, Inc.

l

ATTN: Mr. D.'N, Morey

Vice President

l

P. O. Box 1295

l

Birmingham. AL 35201-1295

l

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-348/98-01 AND 50-364/98-01.

AND NOTICE OF VIOLATION

Dear Mr. Morey:

On February 21, 1998, the U.S. Nuclear Regulatory Commission (NRC) completed

an inspection at your Farley Nuclear Plant (FNP).

The enclosed report

presents the results of that inspection.

During the six-week period. your conduct of activities at FNP was generally

characterized by safety-conscious operations. sound engineering and

maintenance practices, and careful radiological work controls.

However, a

violation of NRC requirements was identified involving two examples of

inadequate use of radiological contamination controls during the performance

of maintenance.

The violation is cited in the enclosed Notice of Violation (Notice) and the

s)ecific circumstances surrounding the violation are described in detail in

t1e enclosed report.

Please note that you are required to respond to this

letter and should follow the instructions specified in the enclosed Notice

when preparing your response.

The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance

-with regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

i

this letter and its enclosures will be placed in the NRC Public Document Room.

L

Sincerely.

'

Original signed by Pierce H. Skinner

$ 3310 $ $ $3 d e

Pierce H. Skinner. Chief

a

em

Reactor Projects Branch 2

f

L

Division of Reactor Projects

.:

L

t

Docket Nos.:

50-348 and 50-364

'

License Nos.:

NPF-2 and NPF-8

Enclosures:

1.

Notice of Violation

i

2.

Inspection Report 50-348/98-01

l

and 50-364/98-01

,

cc w/encis:

(See Page 2)

<r o f l

e

a

!

SNC

2

cc w/encls:

,

L

M. J. Ajluni. Licensing

Services Manager. B-031

' Southern Nuclear Operating

Company. Inc.

42 Inverness Center Parkway

Birmingham. AL 35242

,

i

R. D. Hill. Jr.

]

General Manager. Farley' Plant

Southern Nuclear Operating

Company. Inc.

P. O. Box 470

Ashford. AL 36312

J. D. Woodard

Executive Vice President

Southern Nuclear Operating

Company. Inc.

P. O. Box 1295

Birmingham AL 35201

State Health Officer

,

Alabama Department of Public Health

434 Monroe Street

Montgomery. AL 36130-1701

M. Stanford Blanton

Balch and Bingham Law Firm

P. O. Box 306

1710 Sixth Avenue North

Birmingham, AL- 35201

Chairman

Houston County Commission

P. O. Box 6406

'

Dothan, AL 36302

Distribution w/encis:

P. Skinner. RII

l

C. Rapp. RII

J. Zimmerman. NRR

PUBLIC

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

7388 N. State Highway 95

Columbia. AL 36319

CSee previous concurrence - attached

UFFICE

RII:DRP

Ril:DRP

Ell:DRP

Ril:DRP

Ell:DRS

Ril:DRS

All:D Q ,

fjp

Qg

51MATLEIE

NAK

CWapp:Sa

TM oss

JMBartley

RKCaldweLL

MErnstes

Isterriweather

G8KMo /'

DATE

3/

/95

3/

/95

3/

/95

3/

/95

3/

/95

3/J g /95

3 Q 5 /95

wi r

YES

ND

YES

ND

YES

ND

YES

NO

YE S

ND

(YES)

NO

(YEV ~ NO

OFFICIAL RECORD COPY

DOCLEIENT IIAK: G:\\FARLEY\\lR98-01.WPD

l

.

.

!

1

I

SNC

2

cc w/encls:

'

M. J. Ajluni. Licensing

Services Manager. B-031

Southern Nuclear Operating

Company. Inc.

42 Inverness Center Parkway

Birmingham AL 35242

R. D. Hill Jr.

'

General Manager. Farley Plant

i

Southern Nuclear Operating

4

Company. Inc.

P. O. Box 470

Ashford. AL 36312

J. D. Woodard

Executive Vice President

Southern Nuclear Operating

Company. Inc.

P. O. Box 1295

i

,

Birmingham, AL 35201

State Health Officer

Alabama Department of Publi Health

434 Monroe Street

Montgomery. AL 36130-1701

M. Stanford Blanton

Balch and Bingham Law F1 m

P. O. Box 306

1710 Sixth Avenue North

Birmingham. AL 35201 /

!

Chairman

Houston County Commission

P. O. Box 6406

/

,

Dothan. AL 36302

,

Distribution w/encls,

P. Skinner. RII

)

C. Rapp. RII

J. Zimmerman. NRR

PUBLIC

\\

NRC Resident Inspect 6r

l

U. S. Nuclear Regulatory Commission

l

7388 N. State Highway 95

l

Columbia. AL 36319

l

OFFICE

RII:DRP

Ril:DLP

Ril:DRP

RII:DRP

Ril:DRS

Ril:DRS

Ril:DRS

SIGW nEtE

@

.%{

Rf5E

CIAtapp:tSta

,fWoss

JHBartley

RKCatchseL L

DEErnstes

Islerriweather

GBKuzo

OflTE

3/ ) #f /95

3/

/95

3/

/95

3/ g g /95

3/ 3 3 /95

3/

/95

3/

/95

wru r

YE'S ' VJ

g

11 0

YES

ND

YES

g

YES

10 0

YES

NO

YES

11 0

OFFICIAL RECORD CCPY

DOC 15ENT llAfE: G:\\FARLEY\\lR98-01.neD

03-20-1998 03114PM

FROM

TO

1 404 562 4996

P.01

/ 4 ' D tfd.)( Q

IVl>l %

.

Distribution w/encls:

P. Skinner, RII

C. Rapp, RII

J. Zimmerman, NRR

PUBLIC

NRC Resident inspector

U. S. Nuclear Regulatory Comission

7388 N. State Highway 95

Columbia, AL 36319

errzsu

ungspur

all:NP

RIlsDRP ,

nII spurf

malspas

RI seus

n11 pus

siumaruus

,

g

f

EAR

CImappleta

Tiuteseqg,,

JBeQWy

REC 4tdW9LL

WErnstes

WIerriweether

GEute

MTE

3/

/M

3/ p /N

3/ fg /M

//

/N

3/

/T5

3/

/N

3/

/95

_

wri r

755

ND

  1. EE)

ND

TES (dup)

/ YE5

ED

YW5

NO

TEE

W

YE5

50

Of f!CIAL RECORD 123PY '

00CINEAT 11A14: C:\\WPSi\\DOCLNENT\\tRM-01.upe

NOTIC OF VIOLATION

Scuthern Nuclear Operating Compa

Docket No.:

50-348, 50-364

Farley Nuclear Plant, Units 1 a

2

License No.: NPF-2, NPF-8

During an NRC inspection cond ted during the period January 11 through

February 21, 1998, a violati 1 of KRC requirements was identified.

In

accordance with the " Genera Statement of Policy and Procedure for NRC

Enforcement Actions," NURE -1600, this violation is listed below:

Technical Soecifications 6.8.1.a requires that applicable written procedures

recommended in Appendix

of Regulatory Guide 1.33 Revision 2, dated February

1978, shall be establis ed implemented, and maintained. Regulatory Guide 1.33. Appendix A. Sect)on 7.e(4) recomends Radiation Protection procedures

specifically for contaMnation control.

/

FNP-0-M-001.HealthfhysicsManual. Revision 13,datedJuly 14, 1995,

paragraph 6.4.2. required that. materials being removed from a contaminated

1

area must be either/1) surveyed by Health Physics personnel as they are being

removedfromtheapea,or2)placedinaRadioactiveMaterialsbagand

transported to an , appropriate location to be surveyed. Paragraph 6.10 stated

'

" Step off pads (50P's) will be provided at points where protective clothing is

to be removed."

!

Enclosure 1

'

TOTAL P.01