i
l
March 26.-1998-
Mr. Lew W. Myers
Vice President - Nuclear
l
Centerior Service Company
P.O. Box 97, A200
Perry,OH 44081
SUBJECT:
NRC PERRY EMERGENCY PREPAREDNESS EXERCISE INSPECTION
(
REPORT 50-440/98003(DRS)
!'
Dear Mr. Myers:
On February 27,1998, the NRC completed an inspection of your emergency preparedness
-
biennial exercise at the Perry Nuclear Power Plant Unit 1. The purpose of this inspection was
l
- to evaluate the performance of the emergency response organization during the exercise. The
enclosed report presents the results of that inspection.
I
Areas examined within your emergency preparedness exercise performance are identified in
the report. Within those areas, the inspection consisted of a selective examination of
procedures and representative records, observation of performance, and interviews with staff.
The objective of the inspection effort was to determine whether the Emergency Plan was
adequate and station personnel were capable of implementing the Emergency Plan in
l
_ accordance with NRC requirements. Based on the results of this inspection, no violations of
,
NRC requirements were identified.
i
Ove,all performance during the 1998 Emergency Preparedness exercise demonstrated that
L
your emergency plan implementation was effective. You effectively addressed and initiated
corrective actions on an issue identified in the control room simulator related to the entry _
conditions in an Emergency Instruction. The Technical Support Center staff's responses were
j
effective and emergency classifications and priorities were well coordinated. Operations
L
Support Center management and staff performance was effective, inplant response teams
l
were effectively briefed on their assignments and rapidly dispatched. Emergency Operations
L
Facility responder's performance was effective and facility command and control was strong.
Interfacility transfers of command and control of event response were orderly ard dmely. The
exercise scenario was challenging and included multiple equipment failures.
,
i
l
2
'
,
L
I
I
i
9903310044 990326
h" '
/
ADOCK 05000440
i
G
'
'
I
l
e
4
t
,
L. Myers
2
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
i
!
Sincerely,
original signed by J. A. Grobe
John A. Grobe, Director
l
Division of Reactor Safety
!
l
Docket No. 50-440
l
License No. NPF-58
!
Enclosure:
Inspection Report 50-440/98003(DRS)
cc w/enct:
H. L. Hegrat, Manager
Regulatory Affairs
T. S. Rausch, Director, Quality
and Personnel Development
R. W. Schrauder, Director
[
Nuclear Engineering Department
l
W. R. Kanda, General Manager
Nuclear Power Plant Department
N. L. Bonner, Director, Nuclear
Maintenance Department
l
H. W. Bergendahl, Director
l
Nuclear Services Department
i
Ohio State Liaison Officer
l
Robert E. Owen, Ohio
'
Department of Health
j
j
C. A. Glazer, State of Ohio
?
l
Public Utilities Commission
l
Distribution:
'
Docket File w/ encl
DRP w/enct
PUBLIC IE-01 w/ encl
Rill PRR w/enci
Project Manager, NRR w/ encl
IEO w/enci(E-mail)
A. B. Beach w/enct
Rill Enf. Coordinator w/ encl
Deputy RA w/ encl
DRS (2) w/ encl
TSS w/enct
DOCDESK (E-mail)
SRI Perry wienci
GREENS
DOCUMENT NAME: G:\\DRS\\PER98003.DRS
To feceive a copy of this doeurnent, Indicate in the bout *C" e Copy without alttlenci *E's Copy wth stuend "N" = No co sy 1
OFFICE
Rill
,
I c- Rilk g, ,/
V
Rlli
l4
Rlli
mM
NAME
RJickling:jp (/[:/f.fi JCreWW/(hd), n TKoza@
JGrobMC)
DATE
03 2/98
/
03/9$% / M 03/Ji/98 '
03/1h08
OFFICIAL RECORD COPY
l
W