Forwards Safety Evaluation Concluding That Crystal River, Unit 3 Heat Pump Can Operate Acceptably at Flows of 100 Gpm for Period of 30 Days
ML20217D751
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/01/1997
From: Raghavan L
NRC (Affiliation Not Assigned)
To: Richard Anderson
FLORIDA POWER CORP.
Shared Package
ML20217D754 List:
References
TAC-M96314, NUDOCS 9710060090
Download: ML20217D751 (2)


Text

_.. _ - _

October 1, 1997 Mr. Roy A. Anderson Senior Vice President Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing Crystal River Energy Complex (SA2A) 15760 W Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

EVALUATION OF PUMP TESTING BY INGERSOLL-DRESSER PUMP COMPANY TO VERIFY DECAY HEAT PUMP CAPABILITY AT LOW-FLOW CONDITIONS (TAC NO. M96314)-

Dear Mr. Anderson:

In July 1996, the NRC completed the second phase of an Integrated Performance Assessment of Crystal River Unit 3 (CR-3). An issue associated with the decay heat pump mission time was identified during the staffs assessment. The CR-3 Integrated Performance Assessment Process (IPAP) Final Assessment Report (NRC Inspection Report Number 50-302/96-201) dated August 23,1996, identified this issue as unresolved item URI 96-201-01.

To address URI 96-201-01, Florida Power Corporation (FPC) submitted by letter dated May 13, 1997, the results of a hydraulic evaluation for the decay heat pump. The staff has completed its review and concludes that the CR-3 decay heat pump can operate acceptably at flows of 100 gpm for a period of 30 days. The staffs review of URI 96-201-01 is documented in the enclosed safety evaluation. This review closes URI 96-201-01. It should be noted that during the course of its review, the staff made observations related to the 3B decay heat pump's hydraulic performance and bearing vibration history. The licensee should address these observations as appropriate.

Sincerely,-

L.MvM.Noject Manager Project Directorate 11-3 Division of Reactor Projects -l/II Office of Nuclear Reactor Regulation

\\

Docket No. 50-302 g

/

Enclosure:

Safety Evaluation cc w/ enclosures: See next page Distribution Docket File CR 3 r/f J.Jacobson ACRS J.Colaccino R.Wessman PUBLIC -

T. Harris (E-Mail SE) J.Jaudon B.Boger J.Zwolinski S. Richards DOCUMENT NAME: GACRYSTAL\\96314.cio To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure "E" = Copy With rttachment/ enclosure "N"

  • Rcopy OFFICE PDIl 3/M l C PDll 3/PM l Poll 3/LA,,* C. 4. V PDil 3/RD rl C.

NAME SFland6a/

LRegavan W BClayton.-2M N>

FHebdond l.

,,,,l,

,(,

s DATE 10/t//97 10/ { /97 10/

/97' c.* V 10/ t /91' 9710060090 971001 a"'CI AL RECORD COM

-~

ADOCK0500g2 m, <, ]_ ]O DR

[

Mr. Roy A. Anderson CRYSTAL RIVER UNIT NO. 3 Florida Power Corporation ec:

Mr. R. Alexander Glenn Corporate Counsel Mr. Robert E. Grazio, Director Florida Power Corporation Nuclear Regulatory Affairs (SA2A)

MAC-ASA Florida Power Corporation P.O. Box 14042 Crystal River Energy Complex St. Petersburg, Florida 33733-4042 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Charles Pardee, Director Nuclear Plant Operations (NA2C)

Senior Resident Inspector Florida Power Corporation Crystal River Unit 3 Crystal River Energy Complex U.S. Nuclear Regulatory Commission 15760 W. Power Line Street 6745 N. Tallahassee Road Crystal River, Florida 34428-6708 Crystal River, Florida 34428 Mr. Bruce J. Hickle, Director Mr. John P. Cowan Director, Restart (NA2C)

Vice President, Nuclear Production Florida Power Corporation (NA2E)

Crystal River Energy Complex

-Florida Power Corporation 15760 W. Power Line Street Crystal River Energy Complex Crystal River, Florida 34428-6708 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Robert B. Borsum B&W Nuclear Technologies Mr. James S. Baumstark 1700 Rockville Pike, Suite 525 Director, Quality Programs (SA2C)

Rockville, Maryland 20852 Florida Power Corporation Crystal River Energy Complex Mr. Bill Passetti 15760 W. Power Line Street Office of Radiation Control Crystal River, Florida 34428-6708 Department of Health and Rehabilitative Services Regional Administrator, Region 11 1317 Winewood Blvd.

U.S. Nuclear Regulatory Commission

' Tallahassee, Florida 32399-0700 61 Forsyth Street, SW., Suite 23T85 Atlanta, GA 30303-3415 Attorney General Department of Legal Affairs Mr. Kerry Landis The Capitol U.S. Nuclear Regulatory Commission Tallahassee, Florida 32304 61 Forsyth Street, SW., suite 23T85 Atlanta, GA 30303-3415 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs-2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue l

Iverness, Florida 34450-4245

_ _ _ _ _ _ _