Text
__
l
DCDh0C0
%
l
March 23, 1998
EA 98-170
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regulatory Services
Executive Towers West til
1400 Opus Place, Suite 500
Downers Grove, IL 60515
SUBJECT:
NRC INSPECTION REPORT NO. 50-373/97023(DRS); 50-374/97023(DRS),
4
NOTICE OF VIOLATION, AND EXERCISE OF ENFORCEMENT DISCRETION
Dear Mr. Kingsley:
,
On March 6,1998, the NRC completed an inspection at your LaSalle facility. The enclosed
report presents the results of that inspection.
Based on the results of this inspection, the NRC determined that a violation of NRC
requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice) and
i
the circumstances surrounding it are described in detail in the inspection report. The violation is
of concern because it resulted in the inadequate control of the modification process. This is of
.
particular concem since you are in the process of completing a number of modifications at your
l
facility.
You are required to respond to this letter and should follow the instructions specified in the
i
enclosed Notice when preparing your response. The NRC will use pur response, in part, to
determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
,
Also during this inspection, one other activity appeared to be in violation of NRC requirements.
i
This violation is of concem because adequate control of equipment installation during initial
plant construction and during modifications is important to ensure that systems are capable of
performing their function when called upon. However, after reviewing this violation and
following consultation with the Director, Office of Enforcement, because this violation was
' baswd upon activities prior to the events leading to the current extended plant shutdown and
satisfy the criteria in Section Vll.B.2, " Violations identified During Extended Shutdowns or Work
Stoppages," of the " General Statement of Policy and Procedures for NRC Enforcement
/
Actions," (Enforcement Policy), NUREG-1600,'a Notice of Violation is not being issued.
Specifically, the violation was licensee-identified as a result of a comprehensive program for
/
problem identification and correction that was developed in response to the shutdown, the
violation would not be categorized at a severity level higher than Severity Level ll, and the
violation was not willful. In addition, actions specified in Confirmatory Action Letter
Rlli-96-008B effectively prevent the licensee from starting up LaSalle County Station without
implicit NRC approval.
b.
i4 h
o
O
O. Kingsley
-2-
March 23, 1998
1
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room (PDR).
{
We will gladly discuss any questions you may have conceming this inspection.
Sincerely,
'/s/ G. E. Grant
Goeffrey E. Grant, Director
Division of Reactor Projects
Docket Nos: 50-373;50-374
Enclosures:
2. Inspection Report 50-373/97023(DRS);
50-374/97023(DRS)
cc w/encis:
M. Wallace, Sen!or Vice President
D. Helwig, Senior Vice President
G. Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
1. Johnson, Licensing Director
DCD - Licensing
F. Dacimo, Site Vice President
T. O'Connor, Station Manager
P. Bames, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce
Commission
Distribution
Docket File w/encls
Rlll PRR w/encls
Rlli Enf. Coordinator w/encls
PUBLIC IE-01 w/encls
SRI, LaSalle w/encls
TSS w/ enc!s
LPM, NRR w/encls
J. L. Caldwell, Rill w/encls
R. A. Capra, NRR e-mail
DRP w/encls
A. B. Beach, Rill w/encls
DOCDESK e-mail
DRS w/encls
IEO e-mail
GREENS
J. Lieberman, OE
J. Goldberg, OGC
B. Boger, NRR
DOCUMENT NAME: G:\\DRS\\LAS97023.DRS (See Previous Concurrence)
vo c
. em or .-- .mi.
m. w c . w .mou. .ii.
ou
o.o,.
r .e m .m.i.c,
ou. ~ ,c.woem
d
Rill
l
OFFICE
Rill
l
Rlli
[Rlli
l
Rlli
t
NAME
Duncan\\lc\\sd
Jacobson
Hills
ClaytoQK~$Q4 GrantT/
DATE
3/ /98
31 l98
3/ l98
31 l98 '
3PS/9'If(/
OFFICIAL RECORD COPY
'
.
O. Kingsley
-2-
March 23, 1998
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room (PDR).
We will gladly discuss any questions you may have concerning this inspection.
Sincerely,
/s/ G. E. Grant
Goeffrey E. Grant, Director
Division of Reactor Projects
Docket Nos: 50-373;50-374
Enclosures:
2. Inspection Report 50-373/97023(DRS);
50-374/97023(DRS)
cc w/encis:
M. Wallace, Chief of Staff
D. Helwig, Senior Vice President
G. Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
1. Johnson, Licensing Director
DCD - Licensing
F. Dacimo, Site Vice President
T. O'Connor, Station Manager
P. Barnes, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist
Office of the Attomey General
State Liaison Officer
Chairman, Illinois Commerce
Commission
Distribution
Docket File w/ encl
Rlli PRR w/enct
Rill Enf. Coordinator w/enct
PUBLIC IE-01 w/ enc!
SRI, LaSalle w/enci
TSS w/enci
LPM, NRR w/enci
J. L. Caldwell, Rlli w/enci
R. A. Capra, NRR w/enci
DRP w/encI
A. B. Beach, Rill w/ encl
DOCDESK w/ encl
DRS w/enci
CAA1 w/enci
DOCUMENT NAME: G:\\DRS\\LAS97023.DRS
u .- . cm e
.,co
oi ec.i.
m.
c em uiw .u.c.,m.ov.o
c . em m .n.
ov.o
.. v . no em
OFFICE
Rill
( Rlli 16, 43111
l
Rill
RKl
.,
-
NAME
Duncan\\(
JacoMy()' 'BuhWals D6%" Claytdl$ k
Leaht(
DATE
3/ll/98
3/d IS8 M
3/lb/98
3/@l98W
Sf' /98\\
OFFICIAL RECORD COPYoa- O*rwi'
VtX 0f
M