ML20217C871
| ML20217C871 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/23/1997 |
| From: | Bass K, Tamlyn T NORTHEAST UTILITIES |
| To: | |
| Shared Package | |
| ML20217C828 | List: |
| References | |
| CK-MP3-06-05, CK-MP3-6-5, NUDOCS 9710020105 | |
| Download: ML20217C871 (3) | |
Text
.
... ~ ~ -.
4 Northeast Utilities Millstone Unit 3 Independent Corrective Action Verification Program (ICAVP) t
. System Review Checklist CK MP3-06-05, Rev. 2 i
Significant Support / Interacting Systems and Related Activities Prepared by:
T. K. Tamlyn G
9/23/97 Name iTriature Date Approved by:
K. M. Bass
/ y/R 9/23/97 j
Name Signature Date t
L
(-
IMPLEMENTATION System:
Verified by:
Date:
Concurrence by:
Date:
uru.os. DOC.0914971033 AM Page i of 9710020105 970930 PDR ADOCK 05000423 p
1 Significant Support / Interacting Systems and cn-ups-os-os nes.2 Related Activities Checklist snet2 l
SRC item:
Change item:
CK-MP3-06-12 PRG ltem:
Reference:
PI-MP3-06; Sections: 5.4.1, 5.4.3.b, 5.6.7.d Line No.
Significant References SRL SRC Comments Need?
Updated Updated (Further review needed to
- 1. Interacting Systems (list)
Yes i No afrP%+
- wNe WW
"~w support SRC ltem #)
7 a-0 0
0 0
b-O C.
O O
I d.
e-0 0
l
- 2. Support Systems (list) win 4: =>-
x== : 4r-7 e s rn 4%
aaarvuee=,u+
Se -
a-O b.
C.
s d.
O e.
O
- 3. Other(list) eMWW W
'~e t 49 9 Men 9?W Wm p@
W5MBeenNES:c.vaw wsue a.
O O
b.
O e
i Page of I
v e
v
iI_
2 2 v
t e
ee n
h s.s fo o.
so-sp u
e g
a n
P c
dncs m
f e
o t tss 1
yl i
t Sk e
c g
n ge a
e nh P
m i
C tc n
as o
m i
r e t
o ei a
t C
t i u
nv i i n
/t i
t c
t r
n oA o
pd C
pe ut t
S a n
l e
t e
nR m
a m
c i
o f
C ing iS
.oN en iL