ML20217C837
| ML20217C837 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/23/1997 |
| From: | Bass K, Tamlyn T NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | |
| Shared Package | |
| ML20217C828 | List: |
| References | |
| CK-MP3-06-00, CK-MP3-6, NUDOCS 9710020095 | |
| Download: ML20217C837 (4) | |
Text
Northeast Utilities Millstone - Unit 3 Independent Corrective Action Verification Program (ICAVP)
Systern Review Checklist CK-MP3-06-00, Rev. 3 BIntdrement Review Checklist Indes Prepared by:
T. K. Tamlyn
,Y, d, _
9/23/97 Name sighature
/
Date
[v[
Approved by:
K M. Bass 9/23/97 Name Signature Date IMPLEMENTATION j
System:
Requirement:
Verified by:
Requirement Number:
Date:
REQ-MP3-Concurrence by:
Date:
MP3.<,mo noc. 9 24971lo 33 AMI Pace I of 9710020095 970930 PDR ADOCK 0500 3
P
Syst:m R:quir:m:nt Rsvi:w Ch:cklist Ind2x CK-MP3 06 00 Rev.3 PI MP3 06 Sh:et 2
+
INSTRUCTIONS FOR USE OF CK-MP3-06-00, SHEETS 3 AND 4 1.
The ORG Verifier shall fill out a copy of CK-MP3 06-00 Sheet 3 for each ICAVP system requirement.
2.
This copy of CK-MP3-06-00 Sheet 3, shall be used as the first page of the package for the entire set of checklists and other attachments for the system requirement being evaluated.
3.
During the review of each ICAVP system requirement, the ORG Verifier shall only use the checklists necessary to document the evaluation.
4.
- The checklists completed for each system requirement shall be indicated by an X in the left column of Sheet 3.
5.
The ORG Verifier shall accumulate the total number of sheets used for each checklist and use this accumulated total as the basis for the page numbering on each checklist set.
6.
The total number of pages used for each checklist shall be entered on the copy of CK-MP3-06-00 Sheet 3 for the system requirement being evaluated.
7.
Use Sheet 4 to document all additional attachments.
8.
The total number of pages for the entire set of all checklists for the system requirement being evaluated shall be entered on CK-MP3-06-00 Sheet 3.
9.
CK-MP3-00-01, CK-MP3-06-12, and any other checklists used for ARG and PRG evaluations shall npqt be included in the above system review packages. ARG and PRG items shall be evaluated and dispositioned according to their respective instructions.
Page 2 of
Syst:m R:quir:m:nt R:vi:w Ch:ckli:t Ind2x CK-MP3-06-00, R:v.3 PI-MP3 06 Sheet 3 X
Checklist Number Checklist Title File Name Pag'es Bases Features CK MP3-06-00 Index CK MP3-02 01 SRL CK-MP3 02-02 SRC CK MP3-06-02 Bases / Change Features CK-M P3-06-03 System Modes / Phases CK MP3-06-04 P&lD CK MP3-06-05 Significant Support / interacting Systems and Related Activities CK-MP3-06-06 Supplemental Documents CK-MP3-06-08 Vendor Manuals / Files CK-MP3-06-09 Performance History Files CK-MP3-0610 Process Bases Venfication MODS, Changes CK-MP3-06-02 Bases / Change Features CK MP3-06 03 System Modes / Phases CK MP3-06-04 P&lD CK MP3-06-05 Significant Support / Interacting Systems and Related Activities CK-MP3-06-06 Supplemental Documents CK MP3-06-08 Vendor Manuals / Files C K-MP3-06-09 Performance History Files CK-M P3-06-10 Process Bases Venfication CK MP3 0611 Mod Procedures CK-MP3-06-13 Training Materials Testing CK-MP3-06-10 Process Bases Verification CK MP3-06-14 Testing Requirements CK MP3-06-15 Testing Requirements Review CK-MP3-06-16 Testing Procedure Adequacy CK-MP3-06-17 Testing Records Review CK-MP3-06-18 Procedures Observed in the Fields Total Pages, this sheet Total Pages, all Sheet 4s Total Pages i System Requirement Number:
Verified By:
Date:
Concurrence By:
Date:
Page 3 of
Syst:m R:quir:mont R3vi:w Ch:cklist Ind3x CK-MP3-06-00, R:v.3 PI-MP3 06 Sheet 4 Other Attachments (List)
Document ID Description Pages
-m mo 4
r e.4-Total Pages, this sheet Page of