Forwards Listed Discrepancy Repts Identified During Review Activities of Icavp.Discrepancy Rept That Has Been Determined Invalid,Listed
ML20217C763
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/30/1997
From: Schopfer D
SARGENT & LUNDY, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
9583-100, NUDOCS 9710020064
Download: ML20217C763 (27)


Text

s .

/

n

("

Sargo e d> Luncly '"

I Don K. Schopfer '

$$$$N September 30,1997 Project No. 9583-100 Docket No. 50-423 Northeast Nuclear Enugy Company Millstone Nuclear Power Station, Unit No. 3 Independent Corrective Action Verification Program United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 I have enclosed the following twenty (20) discrepancy reports (DRs) identified during our review activities for the ICAVP. These DRs are being distributed in accordance with the Communications Protocol, PI MP3 01.

DR No. DR-MP3-0174 DR No. DR MP3-0111 .

DR No. DR-MP3-0181 DR No. DP. MP3-0212 /

DR No. DR MP3-0183 DR No. DR MP3 0213 DR No. DR-MP3-0190 DR No. DR-MP3-0234 DR No. DR-MP3-0196 DR No. DR MP3-0236 DR No. DR MP3 0200 DR No. DR MP3-0240 DR No. DR MP3 0205 DR No. DR MP3-0255 y DR No. DR-MP3 0206 DR No. DR MP3 0261 / g/

DR No. DR-MP3-0207 DR No. DR MP3-0263 DR No. DR-MP3-0208 DR No. DR-MP3-0269 9710020064 970930 PDR ADOCK 05000423 p PDR

'*, .. - ( 'f I lll0lllhllOll}$l Oll)$[I!

SS East Montoe Street

  • Chicago, IL 60603-5780 USA e 312-269 2000

,, s .-

C United Stat,es Nuclear Regulatory Commission September 30,1997

< Document Control Desk Project No. 9583-100 Page 2 ,

I have also enclosed the following DR that has been determined invalid. No action is required from Northeast Utilities for this DR. The basis for the invalid determination is included on the document.

DR No. DR-MP3-0288 Please direct any questions to me at (312) 269-6078.

4 Yours very truly,

1. -

l D. K. Schopfer Vice President and ICAVP Manager .

DKS
spr Enclosures Copies.

E. Imbro (1/l) Deputy Director, ICAVP Oversight T. Concannon (1/1) Nuclear Energy Advisory Council L Fougere (1/1) NU mw+aernom.b.6.

Northeast Utilities ICAVP DR N3. DR MP3-0174 Millstone unit 3 Discrepancy Report Review Group: System DR VALIO

  • Review Element: System Desgn Potential Operabellty issue Disc 6pline: Mechanical Desgn Discrepancy Type: Leensing Document O vee

(,) y, System / Process: OSS

^

NRC Signif6cance level: 3 Date faxed to NU:

Date Published:

Discrepancy: Safety Evaluation Report (SER) original section 3.5.2 is in conflict with FSAR Table 3.21.

Descr6pW6on: Safety Evaluation Report (SER) Original Section 3.5.2 states

. that all safety related systems and components are located within tomado-missile-protected structures or shall be provided with tomado missile barriers. FSAR Table 3.21 identifies j tornado protection as not applicable to the Refueling Water 1

Storage Tank, Quench Spray Pumps, and Quench Spray System piping and valves, excluding RWST recirculation lines and test piping (nor. nuclear safety related), These two licensing basis documents are in conflict with each other because these Quench j Spray System components are safety related.

Review Valid inval6d Needed Date initiator: Feingold. D. J. O O O S' SS7 VT Lead: Nort, Anthony A O O O $/ SS7 VT Mgr schopfer, Don K O O O S/1SS7 IRC Chmn: Singh, Anand K E27/g7 O O O Date:

INVALID:

Date:

RESOLUTION:

~ Prev 6ously identified by Nu? C) Yes ' O ' No Rev6ew initletor: Feingood. D. J, VT Lead: Nort, Anthony A VT Mgr Schopfer, Don K IRC Chmn: Singh, Anand K Date:

sL Comments:

Printed &"J0/971'.37.24 PM Page 1 of 1

NOttheast Utilities ICAVP DR No. DR MP3-0181 Millstone unit 3 Discrepancy Report Review Group: Accdort Mdgaten DR VALID -

Potent 6al Operabiuty Isrue Diecipline: Mechanical Design Discrepancy Type: Licensing Document Systern/ Process: N/A NRC Signincance level: 4 Date faxed to NU:

Date Published:

06ecrepency: Configuration Discrepancios Between FSAR Sections 15.6.2, FSAR Table 6.2 65, and P&lDs

Description:

(1) inconsistency in the Penetration Number : Table 6.2 65 of the FSAR indicates penetration number 12C for the sample line penetrating containment from the pressurizer vapor space, Per P&lD 12179 EM 144814, however, the penetration number for this line is 12A (2) inconsistency in Normal Valve Position: FSAR Section 15.6.2 states that the sample lines are provided with normally closed isolation valves on both sides of the containment wall. Per P&lD 12179-EM-144814 and Table 6.2 65 of the FSAR, however, these valves (3SSR*CTV20 & 21) are normally open, but fall closed, Review Val 6d invalki Needed Date initiator: Kane,T.J. O O O S' ices 7 VT Lead: Rahen, Raj D D 0 0 S'io'87 VT Mgr: Schopfer, Don K G O O a22/97 IRC Chmn: Singh, Anand K O O O or27/97

Date

I INVALID:

1

Date

RESOLUTION, Previously identifled by Nur O Yes ? No Review Intilator: Kane,T.J.

VT Lead: Rahep, Raj D D D D VT Mgt: Schopfer, Don K b IRC Chmn: sangh, Anand K Date:

SL Conynents:

Pnnted 9/30/971:41:50 PM Page 1 of 1

Northeast Utilities ICAVP DR N2. DR MP3 0183 MillstDne unit 3 Discrepancy Report Mov6ewGroup: AccentMitgaton DR VALO +

Rev6ew Element: system CW Potentnal operabil6ty lasue D6ecipiene: Otter O yes D6screpancy Type: Calculeton ,

cGi No SystertVProcess: HVX NRC Significance level: 4 Date faxed to NU:

Date Published:

DiscrepenCY: The reference for the dispersion parameter used in the Fuel Handling Accident is not current D**cr4460n: As part of verification of the results of the Fuel Handling Accident (FHA) in the Fuel Building (FSAR Section 15.7.4), ths following calculations were reviewed:

1. XX XXX 107RA, ReV. O,
  • Radiological Consequences of a Fuel Handling Accident at MP 3*
2. UR(B) 228-4," Radiological Consequences of a Fuel Handling Accident in the Fuel Building" Reference 1 is the basis for the current analysis of the FHA in the FSAR. Most of the input data in Reference 1 is taken from Reference 2. In Reference 2 the basis for the atmospheric dispersion parameter (also known as X/Q) used to calculate the offsite dose was referenced to calculation ENVR W156. This calculatinn was requested (M3 RF1-00353). The response to this RFl (M3 IRF 00278) stated that calculation ENVR W156 was never issued and ENVR W221 is the basis for the atmospheric dispersion parameters. Therefore the reference for design input in the current design basis dose calculation is not correct.

(NOTE: A teview of ENVR W221 confirmed that the atmospheric dispersion parameters documented in this calculation are the same as the ones used as input to the dose calculation. Therefore the results of the dose calculation are considered valid and the discrepancy is in the documentation of the input.)

Rev6ew Val 6d invalid Needwd Date initiator: Johnson, W. J.

O O O S'16S7 VT Lead: Rahois, Raj D G O O S'1'v87 VT Mgr: Scropfer, Don K O O O se22.s.

IRC Chmn: Sqh, Anand K 8 O O st27/97 Date:

INVALID:

Date:

RESOLUT10N:

Previously identified by Nu? O Yes Si No Review initiator: Johnson. W. J.

VT Lead: Rahe}s, Raj D Printed 9/30971:44 49 PM Page 1 of 2

i l

t  !

l Northeast Utilities ICAVP DR No. DR-MP3 0183 l Militione Unit 3 Discrepancy Report

. n-. o .. ,.. n y g _

VT Mgr: Schopfer, Don K , O O,,

1RC Chmn: Singh, Anand K Date:

sL Cammentt*.

Pnnted 9/30/971:44 53 PM Page 2 of 2

Northeast Utilities ICAVP DR N2 DR MP3-0190 Millstone UnN 3 Discrepancy Report Review oroup: Programrnate DR VALID -

Review Element: Change Proemas l D6ecipl6ne: Mechancal Des 9n Discrepare:y Type: Corrective Acton System / Process: HVX NRC significance level: 4 Date faxed to NU:

Date Publistwd:

Di*croPency: Auxillary Building Ventilation Exhaust System fan testing acceptance criteria and NCR Disposition Descript6on: The Disposition Details of NCR 392 255 state that during test IST 3 92-028, the air flow through 3HVR*FN68 under dirty flow conditions-did not meet the design criteria of 15,500 Standard Cubic Feet Por Minute (SCFM). The measured flow was 14,835 SCFM. The NCR is dispositioned "Use-As-Is" stating that the '

15,500 SCFM was an estimated " Clean Filter Criteria" and was I developed to provide margin to prevent fan stalling. The  !

disposition details also state that IST 3 92-028 simulated ' Dirty  !

Filter" conditions and the fan did not trip or stall.

PDCR MP# 92103, Rev.1 attached to the NCR identifies the minimum flow point of 15,000 SCFM along with the statement, "The minimum flow point of 15,000 SCFM was establ!shed by test to be the minimum flow capacity of fans 3HVR*FNBA/6B without stalling." There is a contradiction between the acceptance crtteria of IST 3-92-028 and acceptance criteria stated in the PDCR, i.e., the IST uses 15,500 SCFM, and the PDCR identifies 15,000 SCFM.

Review Valid invalid Needed Date initiator: Wrons, S. P.

O O O S/17/S7 VT Lead: Ryan, Thomas J G O O se24s7 VT Mgr: schopfer, Don K O O O S?5S7 IRC Chmn: sin 0h, Anand K O O O S':7/S7 Date:

INVALID:

Date:

RESOLUTION:

Previously identined by NU7 O Yes tG) No Review p Acceptable Not Acceptable Needed Date VT Leed: Ryan. Thomas J VT Mgt: schopfer, Don K IRC Chmn: singh. Anand K Date:

sL Comments:

Trinted &"Jo/971:45.44 PM Pege 1 of 1 1

e .- . - - , , , -

Northeast Utilnies ICAVP DR N3. DR MP3-0196 Millstone Unit 3 Discrepancy Report Rev6ew Group: Operatons & Mantenance end Testin0 DR VALIO - j Review Element: Operetng Procedure p

Diecipline: Operatens Discrepancy Type: Test Requrements Ow '

SystenVProcess: Rss NRC Signif6cance level: 4 Date faxed to NU:

Date Publisted:

Diecrepency: Missing guidance in the Containment inspection Procedure.

Descr6pt6on: The containment is to be inspected at least once per refueling interval by parforming a visualinspection of the containment sump, verifying the sumps are not restricted by debris and that there is no evidence of structural distress or abnormal corrosion.

Tech Spec 4.5.2.d.2 requires the containment inspection. The

. Tech Spec requirement is qualitative. SP 3612A.1, Containment inspections, provides the direction for performing the inspection.

The procedure gives examples of loose debris in Attachment 1.

The procedure does not provide similar examples of structural distress or abnormal corrosion. Attematively, the procedure does not specify either minimum training requirements or personal qualifications, a

The procedure and completed OPS Form do not provide adequate information to independently venfy that the inspection required by Tech Spec 4.5.2.d.2 is met.

Review Valid invalid Needed Date init6stor: Pieniewlcz, R. Sm7

, O O O VT LSed: Bass. Ken O O O Sem/S7 VT Mgr: Schopfer, Don K O O O s/22/97 IRC Chmn: Singh Anand K O O O e,27/97 D.ie:

INVALID:

Date:

RESOLUTION:

Prov6ously identifled by Nu? O Yes L91 No Review

^**** ***P

  • initletor: Piervewicz, R, VT Lead: Bass, Ken O O VT Mgr: schopfe*, Don K IRC Chmn: singh, Anand K SL Comnwnts:

Printed 9.?Q971.46 34 PM Page 1 of 1

a Northeast Utilities ICAVP DR N2, DR MP3-0200 Millstone Unit 3 Discrepancy Report Review oroup: Accadett W$aten DR VALID - i Review Element: System Design Diecip46ne: Meched Des *"

p g ,g g p ,yggyg g , l D6screpancy Type: Component Data O va. 1 SystervVProcess: N/A (9) No NRC Significance level: 4 Date faxed to NU: i Date Published:

D6ecrepency. Mass Flow Capacity of Turbine Bypass Control Valves is Not Verified.

Description:

The accident analysis results reported in FSAR $15,1,4 is based on the assumption that the maximum capacity of any single steam dump, relief or safety valve is 277 lbtrisec at an inlet pressure of 1200 psia.

No data was found to support this assumption for the Turbine Bypass Control Valves (3 MSS PV47A/B/C,3 MSS PV48A/B/C, and 3 MSS-PV49A/B/C),

Review Val 6d invalid Needed Date initiator: Peebles, N. R.

O O O $/1257 VT Lead: Rahoja, Raj D 0 O O S/12S7 VT Mgr: Schopfer, Don K e,22/97 O O O 1RC Chmn: Singh, Anand K O O O ot27/97 Date:

INVALID:

Date:

RESOLUTION:

Prev 6ously identifled by NU7 Q Yes  !#1 No Rev6ew A ceptable Not Acceptable Needed Date initiator: Peebles, W. R.

VT Lead: Rahoja, Raj D VT Mgt: Schopfer, Don K IRC Chmn: Singh, Anand K Date:

SL Comments:

" inted 9/30971:47.33 PM Pege 1 of 1

. . _ _ _ . _ . _ . . _ . _ - - . . _ _ _ _ . _ _ _ _ _ _ _ . . _ . _ _ . _ _ _ _ . ~..

Northeast Utilities ICAVP DR N2. DR MP3 0205 Millstone Unit 3 Discrepancy Report Review Group: System DR VALID -

Review Element: System Design Potential Operabilny issue Diecipline: I & C Design Discrepancy Type: Draeng Ow

9) No SystenvProcess: QSS NRC 569 niflcance level:4 Date faxed to NU:
Date Published

~

Discreeency: Drawing Discrepancy LSK 2712B

Description:

On Logle Drawing LSK 27128. Rev 13, red and green indicating lights on escutcheon for 30SS*AOV27 are reversed. They are inconsistent with valve escutcheons shown on other logic drawings, The description " Quench Spray A Motor Temp Hl/ Quench Spray B Motor Temp Hi" between sources 30SS TE39A and 3QSS-TE40A should be deleted,11 does not identify the condition associated with either source, The conditions associated with sources 3QSS TE39A and 30SS TE40A are shown to be

'30SS*P3A Motor Temperature" and *3QSS*P3A Motor Temperature High" respectively, Review Valid inval6d Needed Date initletor: Peneles, H.

O O O S25S7 VT Lead: Nort, Anthony A O O O S25S7 VT Mgr: Schopfer, Don K O O O S25S7 IRC Chmn: Singh, Anand K O O O S27/S7 Date:

INVAUD:

Date:

RESOLUTION:

Previously identified by NU7 Q Yes t9) No Review initiator: Pinetes, H.

VT Lead: Neri, Anthony A VT Mgt: Schopfer Don K IRC Chmn: Singh, Anand K Date:

SL Comments:

Pnnted 9/30971:48.5o PM Page 1 of 1

Northeast Utilities ICAVP DR N2. DR-MP3 0206 Millstone Unit 3 Discrepancy Report Review Group: System DR VALID -

Potent 6el Opereb414ty issue Diecipl6ne: 1 & C Deegn Discrepancy Type: Drewtry Om

9) No

$yetem/Proce64: QSS NRC significance level: 4 Date Faxed to NU:

Date Published:

D'*cr*Pency: Drawing Discrepancy LSK 2712C Descr6gdlon: Notation on Logic Diagram LSK 2712C, ReV 13 adjacent to annunciator symbol for 3QSS-TE37 reads 'RWST Temp Hi/RWST Temp Lo". P&lD EM 115A 18 depicts the alarm for 30SS-TE37 to be only for Temperature Alarm Low, Rev6ew Valid invalid Needed Date inst 6etor: Pinetes, H.

O O O S25S7 VT Lead: Nort, Anthony A O O O st2ss7 VT Mgr: Schopfer Don K O O O $25S7 1RC Chmn: Singh, Anand K O O O or27/97 w .:

INVALID:

Date:

RESOLUTION:

Previously identined by NUF (.) Yee i91 No Rev6ew init6ator: Pinoise, H.

    • ^** *#' '

VT Lead: Nort, Anthony A O O O VT Mgr: Schopfer, Don K O O IRC Chmn: Singh, Anand K Date:

SL Commerde:

Printed 9/3097 2:o1:23 PM Page 1 of 1

Northeast Utilities ICAVP DR N . DR MP3 0207 Millstone Unit 3 Discrepancy Repott Review Group: system DR VAllD

  • Potential Operabildy issue  !

Diecipline: I & C De$n Diecrepancy Type: Drewmg O Yes systemfrocess: QSS NRC significance level: 4 Date faxed to NU:

Date Publ6ehed:

~

D6screpencY: Drawing Discrepancy

  • LSK 2712D Dactlpt6an: Notation on Logic Diagram LSK 2712D, Rev 14 adjacent to annunciator split window symbol for 30SS TE23 reads "RWST Temp HL/RWST Temp Lo". PalD EM 115A 18 depicts the signal from 3QSS-TE23 to actuate a Temperature Alarm High (TAH) at MB2. Loop Schematic 3QSS-023, Rev 4 shows a singular (rather than split) window labelled *RWST Temp Hi". One of the conditions shown on LSK 2712D for 3QSS TE23 states "30SS*TK1 Refueling Water Storage Tank Temp Hi-Hi" which is inconsistent with above information, Notation adjacent to 30SS*LS$4A bubble reads "(Note 3)". The drawing depicts Notes 1 and 2. Note 3 is not depicted.

Review Valid inve46d Needed Date snitiator: Pnelas, H-O O O SzS7 VT Leed: Neri, Anthony A Q 9/25,9 7 Q Q VT Mget Schopfer, Don K Q Q Q 9597 IRC Chmn: Singh, Anand K Q Q Q 9G7/97 Date:

INVAllo:

Date:

REsOLUTKrh Previously 6dentifled by NU7 Q Yes t9) No Review initletor: Panelse, H.

VT Lead: Nort, Anthony A VT Ms,r: Schopfer, Don K IRC Chmn: Singh, Anand K Date:

sL Comments:

Printed 9/3397 2.16:18 P.A Page 1 of 1 a

Northeast Utilities ICAVP DR No. DR MP3 0208 Millstone Unit 3 Discrepancy Report Review Group: Acescent Magaton DR VAllo -

Review Element: System Des *gn Potent 6al operability lasue Diecipime: Mechanecal Desig" Discrepancy Type: Licensing Document O ve.

System / Process: N/A 4 g, NRC Significance level: 4 Date faxed to NU:

1 Date Published:

i Descrepency: Fast Closure Time For Turbine Control Valves is Not Verified D*ecription: The accident analysis reported in FSAR 915 2.2.1, page 15.2 3 states " Termination of steam flow to the turbine following a loss of extemalload occurs due to automatic fast closure of the turbine control valves in approximately 0.3 seconds,"

Review of the equipment specifications did not identify data to support this requirement.

Review Valid Invalid Needed Date initiator: Peebles, W. R.

O O O 9/12,97 VT Lead: Rahem, Raj D D D D S'12S7 VT Mgr: Schopfer, Don K O O O a22/97 1RC Chmn: Singh, Anand K O O O 527/97 o.i.:

IPNALID:

Date:

RESOLUTKW:

~

Previously identiful by NUF ( ) Yes @ No Revlew inalator: Peebies, W. R. **** ***

  • VT Lead: Rahep, Raj D a

VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K -.

SL Comments:

Printed 9/3097 2.03.37 PM Page 1 of 1

Northeast Utilities ICAVP DR No. DR MP3-0211 Millstone Unit 3 Discrepancy Report Review oroup: Cysiem DRVAUD

  • Review Element: System Desgn p , ,, ,,

D6ecipiirw: 14 C Den $n Discrepency Type: Drawing O ya tyslerrvProcesa: QSS No NRC significance level: 4 Date faxed to NU:

Date Published:

D6screpency: Drawing Discrepancy . Schematics 30SS-0271,2,0281,2 Deectindion: The limit switch contacts for valve 30SS*AOV27 on Loop Schematic 30SS 0271, Rev 2 and 30SS*AOV28 on Loop Schematic 30SS-0281, Rev 2 are inconsistent with valve position shown. The valve is shown open; the limit switch contacts are shown for a closed valve.

Review Val 6d invol6d Needed Dale initiator: Pineles, H VT Lead: Nort, Anthony A O O O n2s97

@ [ Q &*2597 VT Mgt: Schopfer, Don K g y O 9/2%7 BRC Chmn: Singh, Anand K O O O a27/or Date:

INVAUD:

Date:

RESOLUTION:

Previously identifled by NU7 O Yee t No Rev6ew inillator: P6 notes, H.

VT Lead: Nort, Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K

_ e:

SL Comments:

{

Pnnted S'3097 2 o416 PM Page 1 of 1

Northeast Utilities ICAVP DR N2. DR MP3 0212 Millstone Unit 3 Discrepancy Report Review oroup: System DR VAUD -

Discipline: I & C Desgn Potential Operabiley issue Discreperry Type: DroMn; O v.

SysterWProcess: QSS 4) No NRC Signancance level: 4 Date faxed to NU:

Date Published:

06*cr*Pency: Drawing Discrepancy . Schematics 30SS 040A,8 Deectl P tion: Designation for RTO 30SS TE40A on Loop Schematic 3QSS.

0408, Rev 2 Should be changed to 30SS-TE400 to agree with pump 30SS*P3B designation.

Review Valid invalid Needed Date initiator: Pino6es, H.

O O O or2sS7 VT Lead: Neft Anthony A O O O S25S7 VT Mgt: Schopfer, Don K O O O S'25S7 IRC Chmn: Sngh, Anand K O O O or27/or Dele:

INVALID:

Date:

ttESOLUTK)N:

Prev 6ously identined by NU7 O Yes (#1 No Review initiator: Poeles, H.

YT Leaf: Neri, Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K Dam:

SL Comments:

Printed &%S7 2:04 47 PM Page 1 of 1

1 Northeast Utilities ICAVP DR No, DR MP3 0213 Millstone Unit 3 Discrepancy Report Risview Group: System Dit VALIO

  • Re',tew Eleont: System Desgi p ,

Diecip66ne: I & C Desgn rAscrepency Type: Drewog Om SystenVProcess: OSs No NRC Significence level: 4 Date faxed to NU:

Date Published:

D6ecropency: Drawing Discrepar.Cy

  • Schematics 30SS 054A,B Descr6Mion: Device 43 3RHS*P1 A is shown on Loop Schematic 30SS-054A, Rev 4. There is no corresponding device 43 3RHS*PIB Shown on Loop Schematic 3QSS-0548 Rev 2, The corresponding Elementary Diagrams ESK 5DE, Rev 16 for Residual Heat Removal Pump 3RHS*P1 A and ESK SDF. Rev 16 for Residual Heat Removal Pump 3RHS*P1B respectively both show these devices.

Review Valid inval6d Needed Date inittetor: Panelse. H. O O Q W2597

VT Lead
Nort, Anthony A O O O SsS7 VT Mgr: Schopfer, Don K l O O O W25S7 IRC Chmn: Singh, Anand K Q Q Q 9/27/97 Date:

INVALID:

Date:

RESOLUTION:

Previously identifled by NU7 O Yes t#1 No Review initiator: Preios, H. ** * * *

  • VT Leed: Ne4 Anthony A VT Mgr: S@fer Don K IRC Chmn: Singh, Arend K Date:

SL Comments:

Printed W3097 2.05.57 FM Page 1 of 1

t Northeast Utilities ICAVP DR N DR MP3 0234 Millstone Unit 3 Discrepancy Report Review oroup: System DR VAllD

  • Review Element: System DesiO4 Polantial Operat464ty issue D6ecip66ne: I & C Doog" Discrepancy Type: Drm O Ya (9) No SysterWProcess: SWP

NRC Significance level: 4 Date faxed to NU:

Date Published:

D6*cropency: Drawing Discrepancy. LSK 910G,L Deecrapeton: Logic Diagram LSK 910L, Rev 4 for 3WTC*AOV25A does not show that; A) energizing 3WTC*SOVA1 and SOV25A2 admits air to open AOV25A and; B) de-energizing SOV25A1 or SOV25A2 vents air to close AOV25A.

This logic is shown on P&lD 133C 16.

The drawing format used to depict the control of AOV25A on LSK 910L is inconsistent with the drawing format used to depict the control of AOV25B on LSK 910G, Rev 12.

Review Valid inval6d Needed Date inatiator: Pineese, H.

O O O S2s97 VT Lead: Nort, Anthony A O O O o/2s97 VT Mgt: Schopfer, Don K O O O S25S7 BRC Chmn: Singh, Anand K O O O S27/87 Dete:

INVALID:

Date:

RESOLUTION Previously identifled by NU? C) Yes 0 > No Review p Acceptable Not Acceptable Needed Date VT Leed: Nori, Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K O O O Date:

SL Comments:

Printed EM97 2.06.48 PM Page 1 of 1

t Northeast Utilities ICAVP DR NO. DR MP3-0236 Millstone Unit 3 Discrepancy Repart Review Oroup: System DR VALID -

Review Element: System Design Discipline: I & C Des 6gn Potenttal operability issue Discrepancy Type: Dramn0 O Yes systern/ Process: SWP 194 No NRC Significance level: 4 Date Faxed to NU:

Date Published:

Discrepancy: Drawing Discrepancy Schematics 3SWP 041 A 1,2,041B 1,2 DescriP tion: Annunciators SWP10 for "DG A Cooler SW Flow Lo* and l SWP12 for "DG B Cooler SW Flow Lo* should close to alarm to l be consistent with devices 3SWP*lS41 A2 on Loop Schematic 1 3SWP 041A 1, Rev 2 and 3SWP*!S41B2 on Loop Schematic 3SWP 041B 1, Rev 2; contacts from these devices close on alarm condition to provide requh t J annunciations.

Description associated with annunciators on the Emergency Diesel Generator A/B Control Panels read " Raw Water Flow Low"; description associated with annunciators on the Main Control Board read "DG A/B Cooler SW Flow Lo"; Both alarms originate from the same flow switch,3SWP FIS41 A/B.

Cables from FIS41 A, FIS41B to their respective junction boxes have no cable number.

Review Valid invalid Nooded Date initiator Pinelas, H.

O O O S25S7 VT Lead: Nort, Anthony A O O O S/25S7 VT Mgr: Schopfer, Don K O O O S25S7 IRC Chmn: Singh, Anand K O O O STS7 D.i.:

INVALID:

Date:

RESOLUTION:

Previously identsfled by NU? Q Yes @ No Review inMiator: Panelas, H.

VT Lead: Neri, Anthony A VT Mgr; Schopfer, Don K IRC Chmn: Singh, Anand K Date:

SL Conwnents:

Pnnted &%97 2.07.22 PM Pope 1 of 1

e l Northeast Utilities ICAVP DR No. DR MP3 0240 Millstone Unit 3 Discrepancy Report Review Oroup: Systern DR VALID

  • Review Element: System Des 9" Discipline: I & C Desgn PotenHalOperabilityissue Diecrepancy Type: Drawing O yes System / Process: SWP 191 No NRC significance level: 4 Date Faxed to NU:

Date Published:

Discrepancy: Drawing Discrepancy Schematics 3SWP 152A,B Descripuon: On Loop Schematic 3SWP 152A, Rev 3, extemal wiring from terminals 1,3,4,5,6 of TB2, terminal 1 of TB1, terminals 5,6,8 r

of 10T20 does not agree with wiring shown on interfacing Loop r 1matic 3HVR 103A 2, Rev 2.

vn Loop Schematic 3SWP 152B, Rev 3, extemal wiring from terminals 3,13,14,15,16 of TB2, terminal 1 of TB1, terminals

' 5,7,9 of 4T20 does not agree with wiring shown on interfacing Loop Schematic 3HVR 103B-2, Rev 3.

Extemal wiring from terminal 12 of 9T1 on Loop Schematic 3SWP 152A and terminal 6 of 3T1 on Loop Schematic 3SWP-

, 1528 is not shown.

Review 4 Valid invalid Needed Date

! Initiator: Pineias, H.

VT Lead: Neri, Anthony A O O O s/2ss7 O O O o/2ss7 VT Mgt: Schopfw, Don K O O O se2ss7 IRC Chmn: Singh, Anand K Q Q Q 9/27/97 Date:

INVALID:

Date:

RESOLUTION:

1 Previously identifled by NU7 O Yes 9) No 1

Review initiator: Pinelas, H, VT Lead: Nort, Anthony A VT Mgt: Schopfer, Don K IRC Chmn: Sin 0P., Anand K Date:

SL Comments:

Pryded 9/30/97 2:07.s3 PM Page 1 of 1

t , . .

Northeast Utilities ICAVP DR N2. DR-MP3-0255 MiitstDne Unit 3 Discrepancy Report r<eview Group: Accident Mnigetion DR VALID

  • Rev'9w Element: Maintenance Procedure p

Discipline: I & C Design Discrepency Type: Calculatran Om UysterWProcess: N/A @ No N1tC Significance level: 4 Date faxed to NU:

Date Published:

Descrepancy: Reactor Coolant Pump Underspee Colibration Data Conversion (Discrepancy for Loop i SY495)

Description:

The ICAVP reviewed the following documents in order to evaluate the low shaft speed Reactor Trip function setpoint:

References:

1) FSAR Figure 7.21, sheet 5
2) Procedure 3442H01, Rev,7, Low Shaft Speed Reactor Trip Calibration 3)I&C Form 3442H011, Rev 7, Data page 3 of 5
4) Technical Specification Manual, Table 2.21 item 15 Amendment 114 in reviewir,2 these documents the ICAVP identifies the following discrepancy:

The use of the Er.gineering Unit Conversion Factor shown in the Reference 3) D.aa Sheet, titled "SETPOINT REFERENCES",

will not convert the calibration data to the acceptable setpoint values shown in Reference 4).

SETPOINT

REFERENCE:

TECHNICAL SPECIFICATIONS (TS) Ta@J 2.21, item 15.

(ThlP SETPOINT >=95.6% of rated speed);

1 Hz=.395% Rated Nominal Speed (from Page 3 of Data Sheets).

In order to convert the calibration data of 37.847 Hz (Page 3 of Data Sheets) to a caliorated speed in % and compare it with the acceptance criteria in the TS of >=95.8% the following must be performed:

1 Hz=2.5316%;

Calibrated Speed in % = 37.847X2.5316= 95815 (%).

Review Valid invalid Needed Date inMiator: Balodie. V. E. O O O se24S7 VT Lead: Raheja, Raj D 0 0 0 8/24s7 VT Mgr: schopfer, Don K O O O 9<2s/97 IRC Chmn: Singh, Anand K O O O 9/27/97 Date:

INVALID:

Date:

RESOLUTiord Printed 9/30/97 2:oe:29 PM Page 1 of 2

i North 2ast Utilitics ICAVP DR No. DR-MP34255 Millstone unit 3 Discrepancy Report Prev 6ously identifled by NU7 O Yes 7e No Review initiator: Babdrs, V. E.

VT Lead: Rahoja, Raj D VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K Date:

SL Comments:

M; Printed 900G7 2.M
33 PM Pe2M2

j t

Northeast Utilities ICAVP DR N3. DR MP3-0261 Milletone Unit 3 Discrepancy Report Review Group: Accident Mitgaton DR VAL D -

Rev6ew Element: Operating Procedure Potential Operability issue Diecipline: I & C Design Discrepant / Type: Procedure imp 6emente%n O va 4g systnProcess: N/A ~

NRC *.ir ..tcance level; 3 Date faxed to NU:

Date Published:

Discrepancy: Discrepancy between FSAR Sectiun 15.4.6.1 and Operating Procedure for Boron Dilution Descripoon: Millstone Unit 3 FSAR Section 15.4.6.1 states that "The status of the RCS makeup is continuously available to the operator by

, the following:.... 3. Deviation alerms, if the boric or blended flow rates deviate by more than 10 percent from the preset values".

However, the Operating Procedure, OP 3353.MB3B Rev. 4

" Main Board 38 Annunciator Response", for window 4 7 " Boric Acid Flow Deviation", identifies the setpoint as: " Greater than 0.8 gpm for greater than 30 seconds." The boric acio flow has a range of 0-40 gpm. Therefore, for flows greater than 8 gpm the setpoint value of 0.8 gpm is more stringent than the FSAR criteria, but for flows less than 8 gpm it is not.

Rev6ew Valid invalid Needed D1e initiator: Zwynet, John O O O 8'18'S7 i

T

- Leed: Raheta. Raj D D 0 0 9/22/97 VT Mgr: schopfer, Don K Q Q Q 9/2597 1RC Clunn: singh. Anand K Q Q Q 9/27/97 Date:

INVALID:

Date:

RESOLUTION:

Previously identii ed by NU7 (.) Yes (Si No Review Acc:ptable Not Acceptable Needed Date VT Lead: Raheta, Raj D VT Mgr: schopfer, Don K IRC Chmn: singh. Anand K Date:

sL Comments:

Printed 9/3GS7 2:08.57 PM Page 1 of 1 l

8 Northeast Utilities ICAVP DR No. DR-MP3 0263 Millstone Unit 3 Discrepancy Report Review Group: Acck%nt Megetm DR VAllo .

3 #'*

Potential operability issue Diecipline: other Dieuepency Type: Licensing Document Om SystenVProcess: N/A @ No NRC Significance level: 3 Date Faxed to NU:

Date Published:

Discrepency: Verification of the basis for the two second Fuel Drop Monitor response time.

Ducription: The ICAPV has reviewed the following documents in order to evaluate the response time for the radiation monitors 3RMS*41&42 used in the postulated FHAIC:

A) Procedure SP3449E11, Rev. 4 Fuel Drop Radiation Monitor (3RMS*RlY41 and 42) Analog Channel Operational Test with associated l&C Form 3449E11 1.

B) Procedure SP3449E02, Rev.1 Containment Area Purge and Exhaust Isolation Radiation Monitor Calibration (3RMS*R'E42) with associated l&C Form 3449E02-1.

C) Procedure SP3449E01, Rev. 3 Containment Area Purge and Exhaust isolation Radistion Monitor Calibration (3RMS*RE41) with as.ociated l&C Form 3440E01-1 D) Technical Requirements Manual-Clarification 3.3.2 Rev. 6 Instrumentation, Engineered Safety Features Actuation System Instrumentation TRM Table 3.3.21 Engineered Safety Features Response Times E) FSARCR 97-MP3-4 Affecting Fuel Handling Accident in Containment F) Calculation 3 ENG-244 Rev.1 Analysis of Stroke Time for Containment Purge and Exhaust Dampers dated 5/30/97 G) Unit 3 Millstone FSAR Section 15.7.4 in reviewing the above documents, the ICAVP identifies the following discrepency:

The two (2) second radiation monitor response time stated in the FSAR Section 15.7.4 and confirmed in item E cannot be verified by reviewing the oper @ility procedure contaired in item A or the calibration proceo r~s c.antained in items B and C. This value can be extr0cted 1,e , echnical Requirements Manual (TRM)-

Clarification Section 3.3.2 Rev. 6, " Instrumentation, Engineered Safety Features Actuation System Instrumentation". TRM Table 3.3.2 and item E both state that it takes 5.89 seconds for completing the action and item E states 3.89 seconds for closing the valve. However, there is no test data to confirm the two second Fuel Drop Monitor response time.

Review Pnnted 9/30/97 2:09.27 PM Page 1 of 2

', i Northeast Utilities ICAVP DR No. DR MP3-0263 Millstone Unit 3 DlSCrepancy Report Vand invahd Needed Date initiator: Schwartz, Barry Q W17/97 1 VT Lead: Rahoje, Raj D Q 9/17/97 VT Mgr: Schopfer, Don K 9,D97 O

4 IRC Chmn: Singh, Anand K @ O 9G7/97 Date:

INVALID

l

} Date:

RESOLUTION.

Previously identined by NU7 V Yes (9) No Review l Initletor: Schwartz, Barry VT Leed: Rahele, Raj D VT Mgr: Schopfer, Don K

.i IRC Chmn: Singh, Anand K C

j Date:

l SL Comments:

4 i

i e

k l

I Pnnted 9/3G97 2:09:31 PM Page 2 of 2

e E

Northeast Utilities ICAVP DR No. DR-MP3-0269  !

Mmatone Unit 3 Discrepancy Report Review Group: Operatens & Maintenance and Testog DR VALIO

  • Raylew Eleawnt: Operstmg Procedure Potential Operability issue Diecipline: Operatens Discrepancy Type: 0 & M & T vla .memon C Yes 8ystem/ Process: Qss @ No NRc Significanca level: 4 De*: faxed to NI Date Published:

Discrepancy: Chemistry action limits for RWST not specified.

Description:

The FSAR assumes a value for the lower limit of pH for the RWST water so that the pH of the water recirculated within the containment after an accident is be' ween a pH value of 7.0 and 7.5. Although the plant monitors the pH of the water on a weekly frequency, there are no limits or action statements provided to ensure that the plant meets the FSAR minimum value for pH.

FSAR, page 6.2 41 states "The minimum pH of the spray from the quench spray headers into the containment structure is 4.4.

However, the final pH of the water in the containment structure sump after a DBA, including tha contents of the RWST, is equal to or greater than 7.0 due to the neutralization effects of trisodium phosphate ( TSP ) located in . .*

The water chemistry is monitored weekly, including measuring and recording the pH. However, the chemistry procedure (CP 3802C) and the chemistry data sheet (Chem Form 3802C 1) do not provide either the limit on pH or actions to be taken, if the pH

!3 less than 4.4.

As a consequence, the initial condition for pH may not be met, which could lead to a pH of less than 7.0 for the water recircul&d in the containment following cn accident. The bases for 3/4.5.4 Mfueling Water Storage Tank states ... "This pH band minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components. .. High temperatures and low pH, which could be present after a LOCA, tend to promote SCC. This can lead to the failure of necessary safety systems or components.... Adjusting the pH of the recirculation solution to levels above 7.0 prevents a significant fraction of the dissolved lodine from converting to a volatile form. The higher pH thus decreases the level of airbome lodine in containment and reduces the radiological consequences from containment atmospheric leakage following a LOCA.

Maintaining the solution pH greater than or equal to 7.0 also reduces the occurrence of SSC of austenitic stainless steel components in conhainment. Reducing SCC reduces the probability of failure of components."

Without adequate limits and corrective actions in place, it cannot be assured that the minimum pH as assumed in the FSAR and Tech Spec bases will be met.

Review Valid Invalid Needed Date Initiator: Pleniewicz, R. O O O S'22/S7 VT Lead: Bass. Ken 9 O O 9/22/97 Printed 9/30/97 2:101o PM VT Mgr: scnopter. Don K Ngi4P6f 2

e j e

Northeast Utilities ICAVP DR No. DR-MP3-0269 i Millstone Unit 3 Discrepancy Report VT Mgt: Schopfer, Don K O O - Sr22S7

IRC Chmn
Singh, Anand K Q B"27/97 i

4 Date:

i INVALID:

v Date:

RESOLUTION' j Previously idenoSed by NU7 O Yes @ No a

Review Acco table Not Acceptable Needed Date id P R.

VT Lead: Saas,Vm VT Mgt: Schopfer, Don K IRC Chmn: Singh, Anand K

! Det.:

SL Comments

l 2

l l

I k

4 1

1 l

4 4

i s

i Pr'nted 9/30/97 2:10:14 PM page 2 of 2 i

i a

Northeast Utilities ICAVP DR N3. DR-MP3-0288 Millstone Unit 3 Discrepancy Report

' Review Group: system DR INVAUD -

Potential Operability issue D6ecip46ne: I & C Dewgn Discrepency Type: Calculaton O Yes g~

SysterrWProcess: sWP NRC Significence level: 3 Date faxed to NU:

Date Published:

Diecrepency: Calculation SP-3SWP-2 data discrepancy

Description:

This Setplont calculation is for the pressure switches (3SWP*PS69A/B and 3SWP*PS70A/B) monitoring service water header pressure to the turbine plant component cooling heat 1

exchangers. Page 5, item d, states the process setpoint for these devices are a Technical Specification limit.

A review of the Tech. Spec., Tech. Spec. bases, and Tech.

Spec. Requirements documents did not show this setpoint to be a Tech. Spec. Limit value Review Valid invalid Needed Date initiator: HuxAe.R. O O O 9/2e/97 VT Lead: Nort, Anthony A O @ [ IW2197 VT Mgt: schopfer, Don K O O O IRC Chmn: singh, Anand K O O O Date: 9/23/97 INVALID: CCN No.1 revises the calculation to delete reference to the Technical Specifications. The calculation is therefore consistent with the Technical Specifications.

Date:

RESOLUTION:

Previously identifled by NU7 O Yes @ No Review Acceptable Not Acceptable Needed Date VT Lead: Neri, Anthony A VT Mgr: schopfer, Don K IRc Clwnn: singh. Anand K Date:

SL comments:

)