J' g 'n UNITED STATES 2'18 i NUCLEAR REGULATORY COMMISSION I
7I o
WASHINGTON. D.C. 20066
/
g VIRGINIA ELECTRIC-AND POWER COMPANY DOCKET NO. 50-280 SURRY POWER STATION, UNIT N0. 1 AMENDf!ENT TO FACILITY OPERATING LICENSE Amendment No.158 License No. DPR-32 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Virginia Electric and Power Company-(the licensee) dated August 1,1990, complies with the-standards and requirements Of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's-rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense-and security or to the health and safety of-the public; and E,
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No..DPR-32 is hereby amended to read as follows:
9107170193 910700 PDR ADOCK 05000280 P
PDR h
2 t
(B) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.158, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION M c.Edm Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
July 8,1991 V
I i
3
p # o'o g 4' ' -
UNITED STATES E!'"
i NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 20066 g
1,.., j, VIRGINIA ELECTRIC AND POWER COMPANY L
DOCKET NO. 50-281 l
SURRY POWER STATION, UNIT NO. 2
. AMENDMENT TO FACILITY OPERATING LICENSE' Amendment No.157 License No. DPR-37 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Virginia Electric and Power Company (the licensee) dated August 1,1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act,-and-the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health t
and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; 1
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.-
2.
Accordingly, the license is amended by' changes to the Technical Specifications as indicated in the attachment'to-this license amendment, and paragraph 3.B of Facility Operating-License-No. DPR-37 is hereby amended-to read as.follows:
l
\\
~
2 (B) Technical Caecifications The Technical Specifications contained in Appendix A, as revised through Amendment No.157, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 3
C.Le.Um y Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
July 8,1991
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.
158 FACILITY OPERATING LICENSE NO. DPR-32 AMENDMENT NO.
157 FACILITY OPERATING LICENSE N0. DPR-37 DOCKET NOS. 50-280 ANu 50-28 Revise Appendix A as follows:
Remove Page Insert Page TS 4.5-2 TS 4.5-2 l
l l
TS 4.5 2 2.
By verifying that each motor-operated valve in the recirculation spray flow paths performs satisfactorily vehen tested in accordance with Specification 4.0.3.
l 3.
At least once per 5 years, coincident with the closest refueling outage, by performing on air or smoke flow test and verifying ecch spray nozzle is unobstructed.
C.
Each weight-loaded check valve in the containment spray and outside containment recirculation spray subsystems shall be demonstrated operable at least once each refueling period, by l cycling the valve one complete cycle of full travel and verifying that each valve opens when the discharge line of the pump is pressurized with air and seats when a vacuum is applied.
D.
A visual inspection o' the containment sump and the inside containment recircu!ation spray pump wells and the engineered safeguards suction inlets shall be performed at least once each refueling period and/or after major maintenance activities in the containment. The inspection should verify that the containment sump and pump wells are free of debris that could degrade system l
operation and that the sump components (i.e., trash racks, screens) are properly installed and show no sign of structural di. tress or excessive corrosion.
Basis The flow testing of each containment spray pump is performed by opening the normally closed valve in the containment spray pump recirculation line returning water to the refueling water storage tank. The containment spray purnp is operated and a quantity of water recirculated to the refueling water storage tank The discharge to the tank is divided into two fractions, one for the major portion of the recirculation flow and the other to pass a small quantity of water through test nozzles which are identical with those used in the containment spray headers. The purpose of the recirculation through the test nozzles is to assure that there are no particulate material in the refueling water storage tank small enough to pass through pump suction strainers and large enough to clog spray nozzles.
Amendment Hos.158 and 157