ML20217C136
| ML20217C136 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/17/1998 |
| From: | FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20217C140 | List: |
| References | |
| NUDOCS 9804230225 | |
| Download: ML20217C136 (1) | |
Text
,
Document Transmittal #: 93487 Date: 4/17/98 To:
NRC (DC DESK)
MAC: N/A Destination:
==
Description:==
Copy Copy Totals Document:
Revision:
Comment:
INFO CNTL MSTR AR0503 20 24 1
0 0
AR0703 13 24 1
0 0
Instructions to the Addressee:
Please verify the document (s) received agrees with the above information.
Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal.
The signature indicates acknowledgment of receipt of the above document (s) and that documents have bern updated. Return signed and dated transmittat to Document Control within 15 working days of transmittaldate to mailcode:
NA1C Florida Power Corporation Document Control, NA1C U ^$ Crystal River Energy Complex
[)
's 15760 W. Power Line st.
g
~,. v Crystal River, FL 344284708
\\
Signature of Addressee:
Date:
na*2ggg gngg2 F