ML20217B768

From kanterella
Jump to navigation Jump to search

Forwards Responses to 980130 RAI Re Section 3.6 of Proposed Improved TS Submitted on 970527.Marked-up Pages to Improved TS & Changes to Improved TS 5.5.2 W/Retyped Pages Included in Encl 1.Encl 2 Includes Retyped Pages for Improved TS 3.6
ML20217B768
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/20/1998
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217B772 List:
References
TAC-M98064, TAC-M98065, NUDOCS 9803260171
Download: ML20217B768 (3)


Text

"

Dulo Power Company A Duhr Ewp Company EC07H

=

nas ve I

526 South Church Streer P.O. Box 1006 Charlotte, NC 28201-1006 M. S. Tuckman Erecutive Vice President (704) 382-2200 omCE Nudear Generation (704) 382-4360 fax March 20, 1998 1

l U.

S. Nuclear Regulatory Commission Washington, D. C.

20555 l

l Attention:

Document Control Desk l

Subject:

McGuire Nuclear. Station Docket Numbers 50-369 and -370 TAC Nos. M98964 and M98965

)

By letter dated January 30, 1998, the NRC transmitted a request for additional information related to Section 3.6 of the proposed Improved Technical Specifications (ITS) submitted by Duke Energy May 27, 1997. of this letter provides responses to the comments on this section.

Immediately following each staff comment (or group of comments) are changes to the ITS submittal necessary to resolve the staff's comment and supplement the initial ITS submittal.

The material added to the ITS and associated Bases resulted in page number changes for a large number of pages.

To aid in staff review, Enclosure 1 includes the markup of the ITS 3.6 and Bases to clearly denote changes.

, provides the retyped pages for ITS 3.6 Specifications and Bases in their entirety.

Changes to ITS 5.5.2 were also necessary to resolve two of the comments.

These changes (including retyped ITS pages) are included in along with the changes to Section 3.6.

Changes are denoted by revision bars to facilitate staff review.

The pages provided in Enclosures 1 and 2 in this response replace the corresponding pages in the May 27, 1997

[

submittal and Supplement 1 provided March 9, 1998.

In accordance with Duke administrative procedures and the Quality Assurance Program Topical Report, this response to the request for information and associated supplemental 1

changes have been discussed with representatives of the

/

l l

McGuire Plant Operations Review Committee and the Nuclear l

Safety Review Board and determined to be within the scope of g) ~.y g r

~

the original review.

,s J S!

9803260171 900320 Q 't @

l PDR ADOCK 05000369 P

PDR l

g(

f ptU tbfsp p

~

1 I

1 U.

S.

Nuclear Regulatory Commission March 20, 1998 Page 2 Pursuant to 10 CFR 50.91(b) (1), a copy of this amendment has been provided to the appropriate State of North Carolina officials.

i

\\

l If any additional information is needed, please call Lee A.

Keller at 704-382-5826.

Very truly yours, h*

(.

M.

S.

Tuckman i

Enclosures xc:

w/ enclosures Mr.

L.

A. Reyes Administrator, Region II U.

S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, GA 30303 Mr.

F.

Rinaldi U.

S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555 Mr.

S. M.

Shaeffer Senior Resident Inspector McGuire Nuclear Station Mr. Mel Frye Division of Radiation Protection 3825 Barrett Drive Raleigh, NC 27609-7221 I

~

U.

S. Nuclear Regulatory Commission March 20, 1998 Page 3 M.

S. Tuckman, being duly sworn, states that he is Executive Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission revisions to the Facility Operating Licenses of McGuire Nuclear Station; and that all the statements and matters set forth herein are true and correct to the best of his knowledge.

. b, M.

S.

Tuckman, Executive Vice President Subscribed and sworn to before me this day of M '/ h > 2 3, 1998

\\

~ aAn

~

Not ry Publib My Commissitu Expires:

b%t, b,,A A 0 8

'/

l

\\

O ENCLOSURE 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION SECTION 3.6 O

O