ML20217B690

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-298/91-01 on 910108-0219.Violation Noted But Not Cited
ML20217B690
Person / Time
Site: Cooper 
Issue date: 03/04/1991
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20217B694 List:
References
NUDOCS 9103120183
Download: ML20217B690 (3)


See also: IR 05000298/1991001

Text

.-

=

-

MAR

4 1991

,

D$cketNo. 50-298/91-01

@fMHk

7

License No. OPR-46

r-_---

-

" 'Eg

_

,

inasmmuJ

p g"*

'

sfdp % V

Nebraska Public Power District

Ndd[

ATTN: Guy R. Horn

k.'.; FI '

Nuclear Power Group Manoger

.' ) J./ R %,

F.0. Box 499

d, ;p.f...

Columbus, NE 68602-0499

L.; ,49 .?

e , .- s.g : .

f[l

Gent 1emen:

EWy ...q,M

SUBJECT:

NRC INSPECTION REPORT NO. 50-298/91-01

@4 il -..

This refers to the inspection conducted by Messrs. W. R. Bennett, G. A. Pick ,

Y

  • I

I

and R. V. Azua of this office durirg the period January 8 through February 3,

e ,,f t; q

1991.

The inspection included a review of activities authorized f or your

~ .'.3, % "

$(h ;

/E NO

Cooper Nuclear Station facility.

At the conclusion of the inspection, the

findings were ciscussed with those members of the plant statt ioentified in the

? \\h

enclosed report,

  1. - o .).

1

Areas examined during the inspection are identified in the enclosed report.

A. 8 )

'

"'

Within these areas, the inspection consisted of selective uaminotion of

procedures and representat1ve records, interviews with personnel, and

M4 U

observations of activities in progress.

%[j%

Based on the results of this inspection, certain of your activities appeared to

MMMM_J

F

I@6"

be in violation of NPC requirements.

The violation involved the failure to use

-

the correct procedure during perfonnance of surveillance testing.

However, in

accordance with Section V. A of NRC's Enf orcement Pelicy (10 CFn Fort 2

?" ?

.

.

h

Appendix C), no citation is being issued for the violation described in

paragraph 3.d of the enclosed inspection report.

Your prompt and thorough

)4 %

.

Mkl

9 g.j

corrective 2ctions were a key element in our decision. We are concerned

because the root cause of this incident, as well as enother occu rence during

9

this inspection perica, indicated a lack of attention to detail.

These

rammi

incidences appeared to be isolated; however, their root cause was similar to

j

1

that identifleo during a previous inspection,

ui

i

,

y

During this inspution period, Mr. Meacham connitted to inst 611 emerger,cy

l

i

lighting during tne 1991 refueling outage.

The lighting will be instelled to

J

l

1

,

/

ensure personnel safety anc to aid in operating balonce-of-plant equipment.

s

ihe details of the conrnitment are discussed in paragraph 8.f of the enclosed

l

1

report.

l

I

Should your understanding of the connitmerts discussea above dii'er f rom ours,

please contact me innedietely,

j

in accordance with 10 CFR Fart 2.790 cf the NRC's "Ru',es of Practice, a copy

of this letter and its enclosure will be placed in the NPC Public Docuwnt Roon'.

4

D M- )po

PlV:Ry7

RIV:SP![7

PE : DR,P/ p

C:DRP/C

h

WREennet

RVA%e

v

PHHarrell

Wollins

-

p GAPic

y /20/91

t / d/91

p /n91

'W'

,

2

1

P/20/9

.\\

?

k'

Ik {

9103120183 910304

PDR

ADOCK 05000298

\\

o

PDR

fa % %

'

t.

.'

m . . m.

m

N

- . : '

u

._

--_

_ _ _ _ _ _ _ .

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _

__

4

.< _

.

-

,.

f-

+

'-k.

' Nebraska Public Power District

-2-

4

t1

Should you have any questions concernin9 this inspection, we will be pleased to

- "

. discuss them with you.

Sincerely.

Or; gin .1 Sigrcd By:

Sanact J. Collina

'

Samuel J. Collins, Director

Division of Reactor Projects

Enclosure:

Appendix - hRC Inspection Report

50-298/91-01

cc w/ enclosure:

Nebraska Public Power District

ATTN:

G. D. Watson, General Counsel

P.O. Rox 499

Columbus, Nebraska 68602-0499

Cooper Nuclear Station.

ATTN: John M. Meacham, Division

Manager, Nuclear Operations

P.O. Box-98

Brownville, Nebraska 68321

.Nelraska Department of. Environmental

. Control

ATTN: Dennis Grams, Director

P.O. Box 98922

Lincoln, Nebraska 68509-8922

Nemaha County Board of Comissioners

ATTN:

Larry Bohlken, Chairnn

Nemaha County Courthouse

1824 N- Street

Auburn, Nebraska 68305

Nebraska Department of Health

. ATTN: Harold Borchert. Director

Division of Radiological Health

301 Centennial' Hall, South

.P.O. Box 95007

Lincoln, Nebraska- 68509-5007

hnsas Radiation Control Program Director

.

l

+

_ _ _ _ - . _ _ _ - _ . _ . . _

. _ _ _ _ _ _ _ _ -

_

_ _ _ _ _ - _ _

.

a

Nebraska Public Power District

-3-

bec to DMB (IE01)

1

bec distrib. by RIV:

  • R. D. Martin
  • Resident Inspector
  • Section Chief (DRP/C)

Lisa Shea, RM/ALF

  • DRSS-RPEPS
  • MIS System
  • RIY File
  • ProjectEngineer(DRP/C)
  • RSTS Operator
  • DRP
  • Senior Resident Inspector - River Bend

G. A. Pick

  • Senior Resident Inspector - Fort Calhoun
  • DRS

G. L. Constable, DRP/TSS

  • w/766

.

9

P

1

-