ML20217B399
| ML20217B399 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/15/1997 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-M98958, TAC-M98959, NUDOCS 9709240323 | |
| Download: ML20217B399 (3) | |
Text
-
s 2 EE@(,e p
c
[
t UNITED STATES
!)
y j
NUCLEAR REGULATORY COMMISSION
't WASHINGTON, D.C. 20656 4001
/
September 15, 1997 MEMORANDUM FOR:
Docket' File-FROM:
Peter S. Tam. Senior Project Manager
- roject Directorate 11-2
[
e l
Division of Reactor Projects - 1/II l
Office of Nuclear Reactor ReJulation i
SUBJECT:
CATAWBA UNITS 1 AND 2 - IMPLEMENTATION OF AMENDMENTS 161 AND 153 TO OPERATING LICENSES (TAC M98958 AND M98959)
The attached two pages, transmitted by fax from Duke Energy Corporation, signify the implementation of operating license Amendments 161 (for Unit 1) and 153 (for Unit 2) on September 15, 1997.
(:\\
Docket Numbers 50-413 and 50-414 k
Distribution Docket file PUBLIC H. Berkow
$ $ $ ? ?,$ T I f? Q Q Q }?
9709240323 970915 PDR ADOCK 05000413 P
PDR 11llllll !!lill,I,I II
Noelear Policy Mensal. Volume 2 NSD Appenes D. 221. Implementation Sheet APPENDIX D. 221. FACILITY OPERATING UCENSE/ TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACILITY OPERATING LICENSEffECHNICAL SPECIMCATIONS AMENDMENT IMPLEMENTATION SilEET CNS D MSS D ONS UNIT NO. O I C 2 0 3 TS NO. b ' Cbe edu DATE RECEIVED 3397 AMENDMEhT. NO. W M U1153 DESCRIPTION b f$.m.
btk b bw
% Dukahc Cnen m u C A W S &%+ j l[m "*d ee.W 'm
- 1. IMPLEMENTATION DATIS
!l A. NRC ISSUE DATE (Date of NRC Cover leuer):Ii A'tM l
Il B. NRC EFFECTIVE DATE (From Text of NRC letter):
bM*n k
C. STATION IMPLEMENTATION (No later than NRC Date):
3 ).L /4 ~7
- 2. PLANT NO'III1 CATION initialt date MM Via E Mail Distribution; include She Technied Contacts Ah B.Ch Pre. implementation items (Items 1 5)
- 3. RGC TECHNICAL CONM:NT REVIEW CRITERIA D
A All Die-ics Have Been Resolved Via NRC Interface.
O B. No inadvenent Chanan W To S Sheets involved.
K C. TS Char.se Was issued R
B DPC.
TECHNICAL REVIEWER:
Y
/
/
v (List Discrepancies On At Page)
( Date i
CHECKED BY:
McM lol%
(List Ducrepancies On Aftached Page) h -) D *"I'*k N 8 4. PIP NUMBER (If gen:rsted): -O -< J ").194Yu. M %%
ww~ Date
A VERil'IED BY:
NNw
- l J 8=l9 7 Regulatory Compliance Y Date
- Pie O cco -m 1 h
~ b.e.4 t
p o, i,. p,.. A ts.'s e +ti-)
ct w a.W b wrk -t.2 adde % cr % sig doe 4 w m r~p r@ d % % f t..M
- L, A ro,4 g N m @ey.
(36 JLN 1997)
D.22127 gong aastriaca Anorlanau totettsros m m ot m n'91/00
NSD Appendia D. 221. Implamentation Sheet Nedear Policy Maneal Vohene 2 FACILITY OPERATING LICENSETIECHNICAL SPECIFICATIONS AMENDMENT LMP11MENTAT10N SHEET
- 6. FINAL IMPLEM. TATION APPROYAL
_ /M[ab 1 lab 7 Manager, Regulatory Comp
Date WW 9lIshY Manager, Safety' Assurance Date
- Approval may be waived (see 221.8 Item 6).
- 7. ADVANCEIMPLIMENTATION 6.1 dvanz copies distributed 9!/.i 97 b A 4 As a e r n tN'(Q1 vn i
Responsible Licensing Individfal 6/ "
I$ ate 6.2 ONTROL ROOM / WORK CONyOL N IF N
/\\/ A WER~ drecera$.
. 1 c?ft 2
Responsible Licensing Indi$ dual ~
" (I
~'
ba*.e 6.2.1 IN UCTIONS TO OSM/SWM/CRSROlWCSRO (if needed) 6.2.2 ACKNOW1.EDGMENT OF RECEIPT OF ADVANCE COPIES BY OPERATIONS PE S NNEL l'
page
- Dat4, E. DOCUMENT CONTROL DISTRIBLTION A copy of the Technical Specification packag: has been terwarded to Document Management for station distabution.
Responsiole Licensing Individual Date
- 9. FINAL REGULATORY COMPLIANCE SIGNOFF Manager, Regulatory Compliance Date D-22123 (30 JUN 1997) i C002 33NVildK03 XHO.IY1333H I61rit9tOS YV3 sliot Noh 10/91/00