ML20217B385
| ML20217B385 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/16/1997 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-M98861, TAC-M98862, NUDOCS 9709240280 | |
| Download: ML20217B385 (2) | |
Text
f.,+
UNITED STATES 5
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. m September 16, 1997 MEMORANDUM FOR:~5 Docket File' FROM:
Peter S. Tam Senior Project Manager
]
Project Directorate 11-2 ph M
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA UNITS 1 AND 2 - IMPLEMENTATION OF AMEN 0MENTS 160 AND 152 TO OPERATING LICENSES (TAC M98861 AND M98862)
The attached page, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendments 160 (for Unit 1) and 152 (for Unit 2) on August 18. 1997.
Docket Numbers 50-413 and 50-414 I
Distribution i
Docket file -
PUBLIC H. Berkow.
k)k ADO 13 P
PDR ll!!!!l!!I,1lllllll
=
Nudear Policy Maned Yeleme 2 NSD Appendt D. 221. !mplementation Siwet APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET i
FAClllTY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SIIEET dCNS O MNS O ONS UNIT NO. Il d2 0 3 TS N o.
b 7. /3. $. d
- 2 DATE RECEIVED fl /M7 i
AMENDMENT. NO. IG0//52, DESCRIPTION kN48 n'881tm 70lw *d km LCV W h<h OS be&J WA4 9' $ArdIshte fe Hw d b.g Auke yp Amp of fbs, I. IMPIDfENTATION DAES
'Mdh 6MfdN" 6 don Y
A. NRC ISSUE DATE (Dete of NRC Cover Letter);
d8Sl8 II, /497 1
B. NRC EF':ECTIVE DATE (From Text of NRC le:ter):
Atun'94 il l'I4'l C. STATION IMPLEMENTATION (No later than NRC E6cctive Date):
bW il IN l
- 2. PLANT NOTIF1 CATION A.
1 ia E Mail Distnbution: Include Site Technical Contacts B.
/
Preenplementation items (Items 13)
- 3. RGC TECHNICAL CONTENT REVIEW CRITERIA O
A. All Discrepancies Have Been Resolved Via NRC Interface.
O g B. No inadverent Changes Were Made To TS Sheets involved.
3 C.
5 Chang Was issued :R sted By DPC.
TECHNICAL REVIEWER-M I!/I!N v
(Last Dacrepancies On A ched Page)
Date f!/(/U l
CHECKED BY:
O V
l (List Discrepancies On Attached Page)
Date I
- 4. PIP NUMBER (If generatod):
CD dEM
- 5. O ALL CORRECTIVE AC
'ONS FROM ASSIGNED PIP COMPLETED f//f/U VERIFIED BY:
Regulatory Compliance Date b 48-NA*'t A M I b, M h
- pp,eva %p netaa kaw see.gg,d h 4Af, ajg6 (ferrtS[Dr#@ 8VM b 0* W eb vleisa4LN ekm % %U0 @M 5 gnet/bg W4 Wry grer+
M4 do not rakh (A+s44 wmW h N8c. SWurto, mit04 44y#
(38 JUN 1997) 4de g pel -(t l% Q D 22127 200 @
33NVI*IdA03 AH0JY1333H ISTCIC9COS IVd 03:0I NOK 10/SI/00 t