ML20217B237

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/90-36 on 901219-910125.No Violations or Deviations Noted
ML20217B237
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/20/1991
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20217B241 List:
References
NUDOCS 9103120042
Download: ML20217B237 (3)


See also: IR 05000302/1990036

Text

~

%.

OFi~ 0 AL 003Y

,

I

FEB 2 01991

Docket No. 50-302

License No. DPR-72

Florida Power Corporation

Mr. P. M. Beard Jr.

Senior Vice President, Nuclear Operations

ATTN: Manager, Nuclear Operations Licensing

P. O. Box 219 - NA-21

Crystal River, FL 32926

Gentlemen:

S'JBJECT:

MRC INSPECTION REPORT NO. 50-302/90-36

This refers to the inspection conducted by P. Holmes-Ray of this office on

December 19, 1990 - January 25, 1991.

The inspection included a review of

activities authorized for your Crystal River facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, violations or deviations were not

identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED BY

A%kVIN V. SINKULE

Marvin V. Sinkule, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ encl:

(See page 2)

9103120042 g g2 go2

PDR

ADOCK

PDR

-7"""bL

G

s

.

_

._

T.

..

Florida Power Corporation

2

FEB 2 01991

cc w/ enc 1:

Gary L. Boldt

Vice President, Nuclear Production

Florida Power Corporation

P. O. Box 219-SA-2C

Crystal River, FL 32629

P. F. McKee, Director

Nuclear Plant Operations

Florida Power Corporation

P. O. Box 219-NA-2C

Crystal River, FL 32629

R. C. Widell, Director

Nuclear Operations Site Support

Florida Power Corporation

P. O. Box 219-NA-21

Crystal River, FL 32629

A. H. Stephens

General Counsel

Florida Power Corporation

MAC - A50

P. O. Box 14042

St.-Petersburg, FL 33733

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee, FL 32304

Jacob Daniel Nash

Office of Radiation Control

Department of Health and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee, FL 32399-0700

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone Road

Tallahassee, FL 32301

,

i

State Planning and Development

!

Clearinghouse

l

Office of Planning and Budgeting

l

Executive Office of the Governor

i

The Capitol Building

l

Ta'.lahassee, FL 32301

cc w/enci cont'd:

(See page 3)

l

- - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

4

4

!

0 1991

Florida Power Corporation

3

cc w/ enc 1 cont'd:

Chcirman

Board of County Commissioners

Citrus County

110 N. Apopka Avenue

Inverness, FL 36250

Robert B. Borsum

Babcock and Wilcox Company

Nuclear Power Generation Division

1700 Rockville Pike, Suite 525

Rockville, MD 20852-1631

State of Florida

bJr w/ encl:

kDocument Control Desk

R. Crienjak, Rll

H. Silver, RII

NRC Resident Inspector

U.S. Nuclear Regulatory Comission

6745 N. Tallahassee Rd.

Crystal River, FL 32629

b

fY

{

fj qj

Doc,N Q 90-36

02/

91

2/

_. .

. _ _ .