Forwards Engineering & Technical Support Team Insp Rept 50-461/90-27 on 901217-910130 & Notice of Violation
ML20217B180
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/05/1991
From: Phillips M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20217B185 List:
References
NUDOCS 9103120019
Download: ML20217B180 (2)


See also: IR 05000461/1990027

Text

-

}

g-

g

q

.

,.

.

i

MAR

51991

Docket flo. 50-461

lilinois_ Power Company

1

ATTil:

J. S. Perry

Vice President

Clinton Power Station

flail Code V-275

P. O. Box 678

Clinton, IL- 61727

Gentlemen:

This refers to the Engineering and Technical Support Team Inspection conducted

by P. R. Rescheske, V. P. Lougheed, J. H. Neisler, and I. T. Yin, of this

office on December 17, 1990, through January 30, 1991, of activities at the

Clinton Power Station, authorized by flRC Operating License flo. IlPF-62, and to

the discussion of our findings with you and other members of your staff during

the on-site exit meeting held on January 11, 1991. Additional material was

submitted by your staff and discussions were held subsequent to the onsite

portion of the inspection. The results of our review were discussed with

tir. J. Sipek of your staff on January 30, 1991.

The inspection focused on yot

c -+rol and implementation of temporary .nd

permanent plant design changt

' ' enclosed copy of our inspection report

identifies areas examined dur,

e inspection. Within these areas, the

inspection consisted of a selecuve examination of procedures and representative

records, observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in violatien

of flRC requirements, as specified in the enclosed flotice.

A written response

4

is required. Your response should not be limited to the specific examples

cited, but should also address the scope of your initiatives in the area of

design control and associated status and schedules.

Weaknesses with the

design control process are discussed in Paragraph 7 of the enclosed report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the flRC Public Document Room.

The responses directed by this letter and the accompanying tiotice are not

subject to the clearance procedures of the Office of flanagement and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

I

9103120019 910305

I

PDR

AD

O

. OCK 05000461

/g

PDR

2

<

,

.

'

.

.

.-

. , - -

Illinois Power Company

2

MAR

51991

We will gladly discuss any questions you have concerning this inspection.

.-

flonte P. Phillips, Chief

Operations Branch

Enclosures:

1.

Ilotice of Violation

2.

Inspection Report

flo. 50-461/90027(DRS)

cc w/ enclosures:

J. Cook,fianager, Clinton Power Station

F. Spangenberg,111, llanager -

Licensing and Safety

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspector, Rill

LPll, llRR

J. licCaffrey, Chief, Public

Utilities Division

Patricia O'Brien, Governor's

Office of Consumer Services

S. Zabel, Esquire, Schiff, Hardin,

& Waite

L. Larson, Project flanager,

General Electric Company

Chairman, DeWitt County Board

Illinois Department of

fluclear Safety

Robert flewmann, Of fice of Public

Counsel, State of Illinois Center

Perry SRI

-

'kB

}> 5

/

~

.Rlj

IJ I

Rill

R

i

i

beske/cg

u'g

cl'

1 1r

Yin

02/fF/91

02/Je/91

02bf/91

02/1 / 1

RI

RI

RillbU.-

R 11)

QD'h-

G,ilips

'Wrligh t

k

7

Ptf

.

ic 'niet

Lanksbury

02/ /91

/4/91

03 /4/ /91

0 /( /91