ML20217B180
| ML20217B180 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 03/05/1991 |
| From: | Phillips M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jamila Perry ILLINOIS POWER CO. |
| Shared Package | |
| ML20217B185 | List: |
| References | |
| NUDOCS 9103120019 | |
| Download: ML20217B180 (2) | |
See also: IR 05000461/1990027
Text
-
}
g-
g
q
.
,.
.
i
51991
Docket flo. 50-461
lilinois_ Power Company
1
ATTil:
J. S. Perry
Vice President
Clinton Power Station
flail Code V-275
P. O. Box 678
Clinton, IL- 61727
Gentlemen:
This refers to the Engineering and Technical Support Team Inspection conducted
by P. R. Rescheske, V. P. Lougheed, J. H. Neisler, and I. T. Yin, of this
office on December 17, 1990, through January 30, 1991, of activities at the
Clinton Power Station, authorized by flRC Operating License flo. IlPF-62, and to
the discussion of our findings with you and other members of your staff during
the on-site exit meeting held on January 11, 1991. Additional material was
submitted by your staff and discussions were held subsequent to the onsite
portion of the inspection. The results of our review were discussed with
tir. J. Sipek of your staff on January 30, 1991.
The inspection focused on yot
c -+rol and implementation of temporary .nd
permanent plant design changt
' ' enclosed copy of our inspection report
identifies areas examined dur,
e inspection. Within these areas, the
inspection consisted of a selecuve examination of procedures and representative
records, observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in violatien
of flRC requirements, as specified in the enclosed flotice.
A written response
4
is required. Your response should not be limited to the specific examples
cited, but should also address the scope of your initiatives in the area of
design control and associated status and schedules.
Weaknesses with the
design control process are discussed in Paragraph 7 of the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the flRC Public Document Room.
The responses directed by this letter and the accompanying tiotice are not
subject to the clearance procedures of the Office of flanagement and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
I
9103120019 910305
I
O
. OCK 05000461
/g
2
<
,
.
'
.
.
.-
. , - -
Illinois Power Company
2
51991
We will gladly discuss any questions you have concerning this inspection.
.-
flonte P. Phillips, Chief
Operations Branch
Enclosures:
1.
Ilotice of Violation
2.
Inspection Report
flo. 50-461/90027(DRS)
cc w/ enclosures:
J. Cook,fianager, Clinton Power Station
F. Spangenberg,111, llanager -
Licensing and Safety
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, Rill
LPll, llRR
J. licCaffrey, Chief, Public
Utilities Division
Patricia O'Brien, Governor's
Office of Consumer Services
S. Zabel, Esquire, Schiff, Hardin,
& Waite
L. Larson, Project flanager,
General Electric Company
Chairman, DeWitt County Board
Illinois Department of
fluclear Safety
Robert flewmann, Of fice of Public
Counsel, State of Illinois Center
Perry SRI
-
'kB
}> 5
/
~
.Rlj
IJ I
Rill
R
i
i
beske/cg
u'g
cl'
1 1r
Yin
02/fF/91
02/Je/91
02bf/91
02/1 / 1
RI
RI
RillbU.-
R 11)
QD'h-
G,ilips
'Wrligh t
k
7
Ptf
.
ic 'niet
Lanksbury
02/ /91
/4/91
03 /4/ /91
0 /( /91
L
- -