Notice of Violation from Insp on 970728-0814.Violation Noted:Licensee Failed to Write Problem Identification & Resolution Rept for Known Failure to Follow Safety Related Procedure
ML20216J623
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/12/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20216J621 List:
References
50-298-97-13, NUDOCS 9709180009
Download: ML20216J623 (2)


Text

.

4 ENCLOS_t)RE 1 NOTICE OF VIOLATION Nebraska Public Power District Docket No.:

50 298 Cooper Nnclear Station Licenso No.:

DPR-46 During an NRC inspection conducted on July 28 through August 14,1997, one violation of NRC requirements was identified in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

Technical Specification 6.3.2, states, in part, that written procedures and instructions shall be established, implemented, and maintained for the following:

... B. Actions to be taken to correct specific... malfunctions of safety-related systems or components.

Surveillance Procedure 6.1 ADS.301, " ADS Reactor Pressure Permissive Calibration and Function and Logic Tests (Reactor in Run) (Div 1)," Revision 1, Step 8.27, states, in part, that test personnel are to connect a meter to read resistance and verify the contacts are closed.

Administrative Procedure 0.5, " Problem Identification and Resolution," Revision 8, Section 14.2, requires, in part, that all personnel are responsible for reporting problems that are, or potentially could be, conditions adverse to quality through the processes of this procedure.

Contrary to the above, on July 23,1997, the licensee failed to write a problem identification and resolution report for a known failure to follow a safety-related procedure. Specifically, during performance of Step 8.27 of Surveillance Procedure 6.1 ADS.301, when contacts were found open rather than closed, test personnel raised the test pressure (which closed the contacts), and then proceeded with the test without reporting this condition in a problem identification and resolution report.

This is a Severity Level IV violation (Supplement 1)(298/9713-02).

Pursuant to the provisions of 10 CFR 2.201, Nebraska Public Power District is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Cummission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011,, and a copy to the NRC Resident inspector at the f acility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the

' basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the 9709190009 970912 PDR-A00CK 05000298 G

PDR

t

iT

?

i

^,

2 required response if an adequate reply is not' received within the time specified in this i

_ Notice, an order or'a Demand for Information may_be issued as to why the license should, not be modified, suspended, or ievoked, or why such other action as may be proper should.

not be taken. _ Where good cause is shown,~ consideration will be given to extending the-response time.

Because your response will be placed in the NRC Public Document Room (PDR), to th's i-extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. However, if you find it -

- necessary to include such information, you should clearly indicate the specific information that you desire not to be placed in the PDR, and provide the legal basis to support your request for withholding the information from the public.

1 Dated at Arlington, Texas this 12th day of September 1997 p