MONTHYEARML20212J6311999-10-0101 October 1999 SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 ML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML20212F0831999-09-23023 September 1999 Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval ML20212F4761999-09-23023 September 1999 Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML20210L4361999-08-0202 August 1999 Cycle 9 12-Month SG Insp Rept ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20210L4451999-07-31031 July 1999 Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20210G6631999-07-28028 July 1999 Cycle 9 90-Day ISI Summary Rept ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20211F9031999-06-30030 June 1999 Cycle 9 Refueling Outage ML20196J8521999-06-28028 June 1999 Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i) ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20206Q8951999-05-0505 May 1999 Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10 ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML20205P9811999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20204C3111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20205B6631999-02-28028 February 1999 Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys ML20203H7381999-02-18018 February 1999 Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed Conditions ML20211A2021999-01-31031 January 1999 Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP Intersections ML20198S7301998-12-31031 December 1998 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20199G3641998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20197J5621998-12-0303 December 1998 Unit 1 Cycle 9 90-Day ISI Summary Rept ML20197K1161998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20195F8061998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With ML20154H6091998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20154H6251998-09-17017 September 1998 Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 Colr ML20153B0881998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With ML20239A0631998-08-27027 August 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Sequoyah Nuclear Plant,Units 1 & 2 ML20236Y2091998-08-0707 August 1998 Safety Evaluation Accepting Relief Requests RP-03,RP-05, RP-07,RV-05 & RV-06 & Denying RV-07 & RV-08 ML20237B5221998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Snp ML20237A4411998-07-31031 July 1998 Blended Uranium Lead Test Assembly Design Rept ML20236P6441998-07-10010 July 1998 LER 98-S01-00:on 980610,failure of Safeguard Sys Occurred for Which Compensatory Measures Were Not Satisfied within Required Time Period.Caused by Inadequate Security Procedure.Licensee Revised Procedure MI-134 ML20236R0051998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant ML20249A8981998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 ML20247L5141998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant ML20217K4471998-04-27027 April 1998 Safety Evaluation Supporting Requests for Relief 1-ISI-2 (Part 1),2-ISI-2 (Part 2),1-ISI-5,2-ISI-5,1-ISI-6,1-ISI-7, 2-ISI-7,ISPT-02,ISPT-04,ISPT-06,ISPT-07,ISPT-8,ISPT-01 & ISPT-05 ML20217E2221998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant ML20248L2611998-02-28028 February 1998 Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2571998-01-31031 January 1998 Cycle 9 Voltage-Based Repair Criteria 90-Day Rept ML20202J7911998-01-31031 January 1998 Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2441998-01-29029 January 1998 Snp Unit 2 Cycle Refueling Outage Oct 1997 ML20199F8531998-01-13013 January 1998 ASME Section XI Inservice Insp Summary Rept for Snp Unit 2 Refueling Outage Cycle 8 ML20199A2931997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20198M1481997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20197J1011997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199C2951997-11-13013 November 1997 LER 97-S01-00:on 971017,vandalism of Electrical Cables Was Observed.Caused by Vandalism.Repaired Damaged Cables, Interviewed Personnel Having Potential for Being in Area at Time Damage Occurred & Walkdowns ML20199C7201997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant L-97-215, SG Secondary Side Loose Object Safety Evaluation1997-10-23023 October 1997 SG Secondary Side Loose Object Safety Evaluation 1999-09-30
[Table view] |
Text
.
- 28N T 7_. f r3 For: The Commissioners From: Victor Stello, Jr.
Executive Director for Operations
Subject:
PRELIMINARY SCHEDULE FOR SEQUOYAH RESTART ACTIVITIES
Purpose:
To inform the Commission of the Office of Special Projects' (OSP) s;hedule of licensing and inspection activities related to restart of Sequoyah Unit 2.
Discussion:
Attached for your information is a preliminary schedule prepared by OSP of licensing and inspection activities related to restart of Sequoyah Unit 2.
This schedule, which indicates the plant could be ready for non-nuclear heatup in late August, reflects input from TVA regarding its schedule for submittal of technical information and resolution of concerns. However, the schedule for criticality is uncertain in that the staff is requiring an independent vertical design / construction review of one safety related schedule.
system and this effort has not yet been factored into the Furthermore, the attached schedule is probably optimistic in that it assumes that no problems will be encountered in resolving identified issues and that no new problems will arise. Notwithstanding, the schedule is useful in depicting the many staff activities currently underway to resolve the numerous TVA issues at Sequoyah.
The staff anticipates briefing the Commission on the status of TVA Sequoyah activities in late July and, at that time, should have a more realistic for resumption schedule on when the plant will be ready of operation.
D M nl El ined-by V. SteHof-
- Victor Ste1To[Jr.
Executive Director for Operations CONTACT: J. Donohew, OSP 49-27292
(/
Enclosure:
TVA Sequoyah Unit 2 Schedule 5/7/87 - Commissioners only.
/p '6 g' 6 O
8707020348 PDR 870623 SECY 87-153 PDR
- l l
i Distribution Docket File 1 NRC PDR l Local PDR l OSP Rdg TVA Rdg l TRehm VStello JTaylor MBridgers (ED0-2838) l BTompkins (87-45) i ED0 Rdg )
OIA Rdg
]
1 1
l 1
1 l
1
- DTVA:0SP *DTVA:0SP *DTVA:0SP *DTVA:DD *DTVA:DIR CJamerson JDonohew JZwolinski SRichardson SEbneter
/ /87 / /87 / /87 / /87) / /87
- 0SP:DD *0SP:DIR DED0 E3 JAxelrad JKeppler JTaylor V llo
/ /87 / . /87 / /87 4 /y/87 b
- See previous concurrences.
e For: The Commissioners .
From: Victor Stello, Jr.
Executive Director for Operations
Subject:
PRELIMINARY SCHEDULE FOR SEQUOYAH RESTART _ ACTIVITIES /
Purpose:
To inform the Commission of the Office-of Special Projects # (OSP)
/
schedule of licensing and inspection activities related'to restart i of Sequoyah Unit 2. /
Discussion: Attached for your' information is a preliminyy schedule prepared by OSP of licensing and inspection activities related to restart of Sequoyah Unit 2. This schedule, w couldbereadyfornon-nuclearheatup)4ichindicatestheplant in late August, reflects input from TVA regarding its setjedule for submittal of technical ,
information and resolution o However, the schedule for criticality is uncertajn,f c'oncerns.
in that the staff is requiring an independent vertical design / construction review of one or more safety related systems'and this effort has not yet been factored into the schedule optimisticintha/Furthermore,theattachedscheduleisprobably t it assumes that no problems will be encountered in resolving /dentified issues and that no new problems will arise.
anding, the schedule is useful in depicting the many Notwiths}tivities staffje currently underway to resolve the numerous TVA ispesatSequoyah.
The staff anticipates briefing the Commission on the status of TVA Sequoyah activities in late July and, at that time, should _
have a more realistic schedule on when the plant will be ready for resumption of operation.
Victor Stello, Jr.
Executive Director for Operations CONTACT: J. Donohew, OSP 49-27292 i
Enclosure:
TVA Sequoyah Unit 2 Schedule 5/7/87 - Commissioners & EDO only.
~ ,
DISTRIBlfrION Central File OGC OSP Rdg TVA Rdg TRehm VStello JTaylor MBridgers (ED0 2838)
BTompkins (87-45)
E00 Rdg OIA Rdg JKeppler JAxelrad SEbneter SRichardson JZwolinski l CJamerson i B.D.Liaw l GZech,RII f SConnelly i JPartlow j
I b I )L M(
1 DT k W DTVA:0SP DTVA:DD cDTVA:DIR JZwolinski SRichardson /Sfbneter DTVA:0SP(1/
CJamerso J Tohew y b/t(/87
'-/ t(/87 [ h /) 87 L /1S/87 6/ 6/87 P DD//
Md JKepMC hw E00 VStello g//g/87 g//f/87 M / /87 i