ML20216J179
| ML20216J179 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 09/12/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hagan J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20216J183 | List: |
| References | |
| 50-416-97-19, NUDOCS 9709170187 | |
| Download: ML20216J179 (6) | |
See also: IR 05000416/1997019
Text
4
/%g
i
UNITED ST ATis
f.
/t
NUCLEAR REGULATORY COMMISSION
.
$
RtosoN tv
p
611 RYAN PLAZA ORivt, SulT E 400
('1
' * '
9....."
AR LINGT ON. T E X AS 76011 8064
SEP 121997
Joseph J. Hagan, Vice President
Operations - Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
SUBJECT: NRC INSPECTION REPORT 50-416/97 19 AND NOTICE OF VIOLATION
Dear Mr. Hagan:
An NRC inspection was conducted August 3 through September 6,1997, at your Grand
Gulf Nuclear Station reactor facility. The enclosed report presents the scope and results of
that inspection.
During the 6 week period covered by this inspection period, your conduct of activities at
the Grand Gulf f acility was generally characterized by safety-conscious operations, sound
engineering and maintenance practices, and careful radiological work controls. However,
the inspection identified three violations involving the failure to follow system operating
procedures, failure to maintain design control, and failure to have controls to ensure the
required separation of non-Class 1E cables from Clas* 1E cables.
During the extt meeting for this inspection, you presented information related to the
violation for failure to maintain design control of the battery racks. While we recognize
your position that the racks were subsequently determined to be in a seismically
acceptable configuration, we consider the regulatory perspective in this . report to be
appropriate. This is based on the f act that the manuf acturer drawing used to construct the
rack that was seismically tested and the current manufacturer drawing for the rack both
show no gap between the cells and the end rails of the safety-related batteries. We
believe this establishes compelling proof that the approved design did, and still does,
require the battery rack to encase the batteries, as shown on the drawings.
These violations are cited in the enclosed Notice of Violation (Notice) and the
circumstances surrounding the violations are described in detailin the enclosed report.
Please note that you are required to respond to this letter and should follow the
instructions specified in the enclosed Notice when preparing your response. The NRC will )
use your response, in part, to determine whether further enforcement action is necessary
'
)
!
to ensure compliance with regulatory requirements.
,
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR). To the extent possible, your response should not include any personal privacy,
ADOCK 05000 ,416
kg. g.!%!
9709170187 970912
PDd
.
o
e
.
..
.
. - . - -
..
_ _ .
. - - .
. . . - -
- . _ . - - .
. ,
.
I
. -
' Entergy Operations, Inc.
-2-
'
,
proprietary, or safeguards information so that it can be placed in the PDR without
l
,
redaction.'
i
4
,
Should you have any questions concerning this inspection, we will be pleased to discuss
-'them with you.
-,
i
Sincerely,-
Di sion of Reac
Projects
,
- .
- Docket No.: 50 416
License No.: NPF 29
.
Enclosures:
_.1, Notice of Violation
2. NRC Inspection Report
.
50-416/97 19
<
i
~
cc w/ enclosures:
Executive Vice President
and Chief Operating Officer
Entergy Operations, Inr;.
P.O. Box 31995
Jackcon, Mississippi 39286-1995
i
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Winston & Strawn
,
1400 L Street, N.W. .12th Floor-
c.
.Wachington, D.C. 20005 3502
,
Sam Mabry, Director -
Division of Solid Waste Management
Mississippi Department of Naturnt -
Resources
P.O.' Box -10385 '
' Jackson, Mississippi 39209.
.
f
2
--
. _ , ,
,
, _ . , , , - . , _ . -
_
-
, . =
..
. . _ _ .
.
-l
.
Entergy Operations, Inc.
3
.
President
Claiborne County Board of Supervisors
Port Gibson, Mississippi- 39150
Manager of Operations
q
Dechtel Power Corporation
'
P.O. Box 2166
Houston, Texas 77252 2166
.
General Manager
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
The Honorable William J. Guste, Jr.
Attorney General
Department of Justico
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
Office of the Governor
State of Mississippi
'
Jackson, Mississippi 39201
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
P.O. Box 22947
Jackson, Mississipp) 39225
Dr. F. E. Thompson, Jr.
State Health Officer
State Board of Health
P.O. Box 1700
Jackson, Mississippi 39205
Eddie S. Fuente, Director
State Liaison Officer
Division of Radiation Health
-Mississippi Department of Health
P.O. Box 1700
Jackson, Mississippi 39215 1700
-
-
.
.
.
4-
Entergy Operations, Inc.
-4-
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286 1955
Director, Nuclear Safety
and Regulatory Affairs
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
Vice President, Operations
,
Grand Gulf Nuclear Station
-
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
_
-_
_ _
.
- .
t
.-
Entergy Operations, Inc.
5-
SEP l 21997
E-Mail report to T. Frye (TJF)
' E Mail report to T. Hiltz (TGH)
E Mail report tc NRR Event Tracking System (IPAS)-
E Mail report to Document Control Desk (DOCDESK)
E Mail report to Richard Correia (RPC)
E Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib, by RIV:
Regional Administrator
Senior Resident inspector (River Bend)
DRP Director
DRS-PSB
-
Branch Chief (DRP/F)
MIS System
Project Engineer (DRP/F)
RIV File
- Branch Chief (DRP/TSS)
Senior Resident inspector (Grand Gulf)
.
DOCUMENT NAME: R:\\_GG\\GG719RP.JDH
To receive copy of document, Indicate in box: "C" = Copy wthout enclosures "E" = Copy wth enclosures "N" = No copy
Rl
C:DRP/F
D:DRP
_
_
,
JDixon-Herrity @ KDWeavor/d,$ DKirsch g
TPGwypn h,1 y)
[09/p/97
09R3/97
09///97
0948g97 KV
09/ /97
'
f
OFFIC,AL RECORD COPY
\\}
__
)
>.
Entergy Operations, Inc.
5-
SEP I 21997
E Mail report to T. Frye (TJF)
E Mail report to T. Hiltz (TGH)
E Mail report to NRR Event Tracking System (IPASI
E Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (River Bend)
DRP Director
DRS-PSB
Branch Chief (DRP/F)
MIS System
Project En0 neer (DRP/F)
RIV File
i
,
Branch Chief (DRP/TSS)
Senior Resident inspector (Grand Gulf)
DOCUMENT NAME: R:\\_GG\\GG719RP,JDH
To receive copy of document, Indicate in box: "C" = Copy witnout enclosures "E" = Copy with enclosures "N" = No cpy
_
,
_
l
]
RI
' C:DRP/F
D:DRP
JDixon-Herrity @ KDWeaver@ DKirsch g
TPGwypn h ,(j)
'
09/o/97
09hl97
09///97
09 @ 7 KV
09/ /97
'
/
OFFIDAL RECORDWY
y
l'70009