Forwards Insp Rept 50-416/97-19 on 970803-0906 & Nov. Violations Involves Failure to Follow Sys Operating Procedures & Failure to Have Controls to Ensure Required Separation on non-Class 1E Cables from Class 1E Cables
ML20216J179
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/12/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hagan J
ENTERGY OPERATIONS, INC.
Shared Package
ML20216J183 List:
References
50-416-97-19, NUDOCS 9709170187
Download: ML20216J179 (6)


See also: IR 05000416/1997019

Text

4

/%g

i

UNITED ST ATis

f.

/t

NUCLEAR REGULATORY COMMISSION

.

$

RtosoN tv

p

611 RYAN PLAZA ORivt, SulT E 400

('1

' * '

9....."

AR LINGT ON. T E X AS 76011 8064

SEP 121997

Joseph J. Hagan, Vice President

Operations - Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

SUBJECT: NRC INSPECTION REPORT 50-416/97 19 AND NOTICE OF VIOLATION

Dear Mr. Hagan:

An NRC inspection was conducted August 3 through September 6,1997, at your Grand

Gulf Nuclear Station reactor facility. The enclosed report presents the scope and results of

that inspection.

During the 6 week period covered by this inspection period, your conduct of activities at

the Grand Gulf f acility was generally characterized by safety-conscious operations, sound

engineering and maintenance practices, and careful radiological work controls. However,

the inspection identified three violations involving the failure to follow system operating

procedures, failure to maintain design control, and failure to have controls to ensure the

required separation of non-Class 1E cables from Clas* 1E cables.

During the extt meeting for this inspection, you presented information related to the

violation for failure to maintain design control of the battery racks. While we recognize

your position that the racks were subsequently determined to be in a seismically

acceptable configuration, we consider the regulatory perspective in this . report to be

appropriate. This is based on the f act that the manuf acturer drawing used to construct the

rack that was seismically tested and the current manufacturer drawing for the rack both

show no gap between the cells and the end rails of the safety-related batteries. We

believe this establishes compelling proof that the approved design did, and still does,

require the battery rack to encase the batteries, as shown on the drawings.

These violations are cited in the enclosed Notice of Violation (Notice) and the

circumstances surrounding the violations are described in detailin the enclosed report.

Please note that you are required to respond to this letter and should follow the

instructions specified in the enclosed Notice when preparing your response. The NRC will )

use your response, in part, to determine whether further enforcement action is necessary

'

)

!

to ensure compliance with regulatory requirements.

,

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR). To the extent possible, your response should not include any personal privacy,

ADOCK 05000 ,416

kg. g.!%!

9709170187 970912

PDd

.

o

e

.

..

.

. - . - -

..

_ _ .

. - - .

. . . - -

- . _ . - - .

. ,

.

I

. -

' Entergy Operations, Inc.

-2-

'

,

proprietary, or safeguards information so that it can be placed in the PDR without

l

,

redaction.'

i

4

,

Should you have any questions concerning this inspection, we will be pleased to discuss

-'them with you.

-,

i

Sincerely,-

VT

Di sion of Reac

Projects

,

.

- Docket No.: 50 416

License No.: NPF 29

.

Enclosures:

_.1, Notice of Violation

2. NRC Inspection Report

.

50-416/97 19

<

i

~

cc w/ enclosures:

Executive Vice President

and Chief Operating Officer

Entergy Operations, Inr;.

P.O. Box 31995

Jackcon, Mississippi 39286-1995

i

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

Winston & Strawn

,

1400 L Street, N.W. .12th Floor-

c.

.Wachington, D.C. 20005 3502

,

Sam Mabry, Director -

Division of Solid Waste Management

Mississippi Department of Naturnt -

Resources

P.O.' Box -10385 '

' Jackson, Mississippi 39209.

.

f

2

--

. _ , ,

,

, _ . , , , - . , _ . -

_

-

, . =

..

. . _ _ .

.

-l

.

Entergy Operations, Inc.

3

.

President

Claiborne County Board of Supervisors

Port Gibson, Mississippi- 39150

Manager of Operations

q

Dechtel Power Corporation

'

P.O. Box 2166

Houston, Texas 77252 2166

.

General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

The Honorable William J. Guste, Jr.

Attorney General

Department of Justico

State of Louisiana

P.O. Box 94005

Baton Rouge, Louisiana 70804-9005

Office of the Governor

State of Mississippi

'

Jackson, Mississippi 39201

Mike Moore, Attorney General

Frank Spencer, Asst. Attorney General

State of Mississippi

P.O. Box 22947

Jackson, Mississipp) 39225

Dr. F. E. Thompson, Jr.

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, Mississippi 39205

Eddie S. Fuente, Director

State Liaison Officer

Division of Radiation Health

-Mississippi Department of Health

P.O. Box 1700

Jackson, Mississippi 39215 1700

-

-

.

.

.

4-

Entergy Operations, Inc.

-4-

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286 1955

Director, Nuclear Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

Vice President, Operations

,

Grand Gulf Nuclear Station

-

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

_

-_

_ _

.

.

t

.-

Entergy Operations, Inc.

5-

SEP l 21997

E-Mail report to T. Frye (TJF)

' E Mail report to T. Hiltz (TGH)

E Mail report tc NRR Event Tracking System (IPAS)-

E Mail report to Document Control Desk (DOCDESK)

E Mail report to Richard Correia (RPC)

E Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib, by RIV:

Regional Administrator

Senior Resident inspector (River Bend)

DRP Director

DRS-PSB

-

Branch Chief (DRP/F)

MIS System

Project Engineer (DRP/F)

RIV File

- Branch Chief (DRP/TSS)

Senior Resident inspector (Grand Gulf)

.

DOCUMENT NAME: R:\\_GG\\GG719RP.JDH

To receive copy of document, Indicate in box: "C" = Copy wthout enclosures "E" = Copy wth enclosures "N" = No copy

SRI

Rl

C:DRP/F

D:DRP

_

_

,

JDixon-Herrity @ KDWeavor/d,$ DKirsch g

TPGwypn h,1 y)

[09/p/97

09R3/97

09///97

0948g97 KV

09/ /97

'

f

OFFIC,AL RECORD COPY

\\}

__

)

>.

Entergy Operations, Inc.

5-

SEP I 21997

E Mail report to T. Frye (TJF)

E Mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPASI

E Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Senior Resident inspector (River Bend)

DRP Director

DRS-PSB

Branch Chief (DRP/F)

MIS System

Project En0 neer (DRP/F)

RIV File

i

,

Branch Chief (DRP/TSS)

Senior Resident inspector (Grand Gulf)

DOCUMENT NAME: R:\\_GG\\GG719RP,JDH

To receive copy of document, Indicate in box: "C" = Copy witnout enclosures "E" = Copy with enclosures "N" = No cpy

_

,

_

l

]

SRI

RI

' C:DRP/F

D:DRP

JDixon-Herrity @ KDWeaver@ DKirsch g

TPGwypn h ,(j)

'

09/o/97

09hl97

09///97

09 @ 7 KV

09/ /97

'

/

OFFIDAL RECORDWY

y

l'70009