ML20216J165
| ML20216J165 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/13/1998 |
| From: | Terry C, Walker R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20216J172 | List: |
| References | |
| TXX-98065, NUDOCS 9803230371 | |
| Download: ML20216J165 (1) | |
Text
s EE Log # TXX 98065 C-C File # 10010.2 C
C Ref. # 10CFR50.36 1UELECTRIC March 13, 1998 C. lance Tm Senior Mce President
& PrincipalNuclear Officer U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR FEBRUARY 1998 Attached is the Monthly Operating Report for February, 1998, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the CPSES Units 1 and 2 Operating License Nos. NPF 87 and NPF 89, respectively.
During this reporting period, there have been no failures or challenges to the Power Operated Relief Valves or Safety Valves for CPSES Unit 1 and Unit 2.
I This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
Should you have any questions, please contact Douglas W. Snow at (254) 897 8448.
Sincerely, b.h C. L. Terry By: h r 6 b, N RogerM. Walker Regulatory Affairs Manager OWS/grp Attachment I
c-Mr. E. W. Herschoff, Region IV l
Mr. J. I. Tapia, Region IV Mr. T. J. Polich, NRR Resident Inspectors 9803230371 980313 PDR ADOCK 05000445 R
PDR O
COMANCHE PEAK STEAM ELECTRIC STATION
$dO V
P.O. Bos 1002 Glen Rose. Texas 76043 1002 J