Docket No. 50-298 MEMORANDUM FOR:
Docket File FROM:
W. O. Long, Project Manager 4
Project Directorate - IV Division of Reactor Projects - III, IV V and Special Projects
SUBJECT:
LICENSEE RESPONSE TO GENERIC LETTER 87-06, TAC 64913 Iri Generic Letter 87-06 dated March 13, 1987 the staff requested licensees to provide information regarding periodic verification of leak-tight inte-
)
grity of pressure isolation valves.
TAC 64913 was opened to track the action for Cooper Nuclear Station.
On June 8, 1987 the licensee responded with the requested information.
A copy of the response was provided to 0. Rothberg on June 12, 1987.
By tele-con of June 17,-1987, Mr. Rothberg stated that 1) the response is satisfac-tory, 2) the information is for use relative to Generic Issue 105 CRGR studies, and 3) no immediate plant-specific technical review or licensing action is needed for Cooper.
Accordingly, TAC 64913 is hereby considered completed.
IGf W. O. Long, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects DJSTRIBUTION Wocket File PD4 Reading File ORothberg LMarsh FCherny JJaudon DDubois PD4 gV PD PD4 /P WLong[:asPN n
JACalvo 6/M/87 6
/87 6/p/87 e707020082 070622 DR ADOCK 0500 7 0 D
- pn nsouq'o, UNITED STATES
["
g NUCLEAR REGULATORY COMMISSION
~,
- E WASHINoTON, D. C. 20555 f
%, * * * *
- p
\\
June 22,1987 Docket No. 50-298 MEMORANDUM FOR:
Docket File FROM:
W. O. Long, Project Manager j
Project Directorate - IV j
Division of Reactor Projects - III, IV l
V and Special Projects
SUBJECT:
LICENSEE RESPONSE TO GENERIC LETTER 87-06, TAC 64913 In Generic Letter 87-06 dated March 13, 1987 the staff requested licensees to provide information regarding periodic verification of leak-tight inte-grity of pressure isolation valves.
TAC 64913 was opened to track the action for Cooper Nuclear Station.
On June 8, 1987 the licensee responded with the requested information.
A copy of the response was provided to 0. Rothberg on June 12, 1987.
By tele-con of June 17, 1987, Mr. Rothberg stated that 1) the response is satisfac-tory, 2) the information is for use relative to Generic Issue 105 CRGR studies, and 3) no immediate plant-specific technical review or licensing action is needed for Cooper.
Accordingly, TAC 64913 is hereby considered completed, n
- h v
W.O.Long,ProjectManager Project Direct nrate -IV Division of fu ot tor Projects - III, IV, V and Special Projects j