Forwards Pilgrim Nuclear Power Station Loss of RHR,811221
ML20216J017
Person / Time
Site: Pilgrim
Issue date: 10/21/1982
From: Wolf T
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Michelson C
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Shared Package
ML20216J020 List:
References
AEOD-E244, NUDOCS 9709170138
Download: ML20216J017 (1)


Text

. .- - . ____ - __ - - _. --- . _. - - . _.

g, UNITE 3 8TATES 8' q NUCLEAR REGULATORY COMMISSION j -

wAsHwarow, o. c. rms .

fop //PA f

/; OCT 21882

\*e ns s" .. - -

i repuc8tCUMEHI H '!

I AE0D/E244 1 MEMORANDUM FOR: Carlyle Michelson, Of rector . . gg Office for Analysis and Eva15tiET 20 l

. of Operational Data -

y tigt stot.'tSTED IHROUGH: Karl V. Seyfrit Chief

[404 /[s.( f i

Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operational Data .

Agtf FROM: Thomas R. Wolf Reactor Systems 4 Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operational Data

SUBJECT:

ENGINEERING EVALVATION REPORT - LOSS OF RESIDUAL HEAT REMOVAL SYSTEM EVENT AT PILGRIM NUCLEAR POWER STATION .. DECEMBER 21, 1981

_ Enclosed is my evaluation of a loss of residual heat removal (RHR) cooling

' event which occurred at Pilgrim on December 21, 1981. In this instance RHR cooling flow was lost while a system pump was operating. This condition went unrecognized for almost five hours. The consequences were minimal sicce the plant was in the very late stages of an extended refuel,ing outage.

I believe the most important feature of this event was the failure of the operators in two shifts to recognize this loss is serious. However, even when considering this fact, the overall event does not appear to meet the criteria necessary to classify this event as an abnormal occurrence. It does seem,' though, to be a good candidate for " Power Reactor Events."

Also, it serves to reinforce the recommendations put forth in IE Circular 81-11 " Inadequate Decay Heat Removal During Reactor Shutdown" '(issued July 24,1981.) . .

T.Aewtw 16. Et]

Thomas R. Wolf '

Reactor Systems 4 9709170138 021021 Reactor Operations Analysis Branch PDR ADOCK 05000293 Office for Analysis and Evaluation f 8 PDR of Operational Data '