ML20216H423

From kanterella
Jump to navigation Jump to search
Provides Notification That No SG Tubes Were Plugged During Outage for Vepc,Iaw NAPS Tss,Sr 4.4.5.5.a.No New Commitments Intended by Ltr
ML20216H423
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/13/1998
From: Mccarthy J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
98-222, NUDOCS 9804210129
Download: ML20216H423 (1)


Text

i a

Visuissar Es.t.:cTitic ANI) Powi:st Cmin Asv RicuuoNo, VouilNi A 232(in April 13, 1998 l

United States Nuclear Regulatory Commission Serial No.98-222 Attention: Document Control Desk NL&OS/ETS R0 Washington, D. C. 20555 Docket No.

50-339 License No.

NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 2 l

STEAM GENERATOR TUBE INSPECTION REPORT l

Planned inservice inspection of the North Anna Unit 2 "A" steam generator was completed during the spring 1998 refueling outage. In accordance with North Anna Power Station Technical Specifications, Surveillance Requirement 4.4.5.5.a, this letter l

provides notification that no steam generator tubes were plugged during the outage.

No new commitments are intended by this letter. If you have any questions concerning these results, please contact us.

l Very truly yours, J. H.(McGs

>, Manager

- Nuclear Licens ng and Operations Support l

0 cc:

U. S. Nuclear Regulatory Commission l

Region II Atlanta Federal Center Atlanta, Georgia 30303 f

61 Forsyth St., SW, Suite 23T85 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station 9804210129 980413 PDR ADOCK 05000339 O

PDR