Forwards Insp Repts 50-456/98-03 & 50-457/98-03 on 980128- 30.No Violations Noted.Insp Included Assessment of Maint Activities on Turbine Digital electro-hydraulic Control Sys That Initiated Reactor Trip on 980126.Deficiencies Noted
ML20216H247
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/16/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20216H252 List:
References
50-456-98-03, 50-456-98-3, 50-457-98-03, 50-457-98-3, NUDOCS 9803200227
Download: ML20216H247 (2)


See also: IR 05000456/1998003

Text

r; ;

Dco)Dc6

  • .

. . . .

March 16,-1998

l

L

Mr. Oliver D. Kingsley -

President, Nuclear Generation Group

Commonwealth Edison Company

L

ATTN: Regulatory Services

Executive Towers West Ill'

.1400 Opus Place, Suite 500 -

Downers Grove, IL- 60515

SUBJECT:

NRC INSPECTION REPORTS 50-456/98003(DRS); 50-457/98003(DRS)

Dear Mr. Kingsley:

,

On January 30,1998, the NRC completed a special inspection at your Braidwood Nuclear

Power Station Units 1 and 2. The purpose of this inspection was to review activities relative to

the Unit 2 reactor trip on January 26,1998. The inspection included an assessment of

maintenance activities on the turbine digital electro-hydraulic control system that initiated the

reactor trip.

The inspection identified deficiencies in the maintenance activities on the Unit 2 turbine digital

electro-hydraulic control system including: 1) use of a blanket work request that bypassed the

normal work control process,2) use of uncontrolled documentation to perform troubleshooting

on the nuclear programmable logic circuit cards, 3) failure to follow vendor instructions for

configuring the nuclear programmable logic card that caused the reactor trip,4) failure to use a

procedure for bench testing the nuclear programmable logic card, and 5) failure to assign the .

correct priority to emergent work that resulted in bypassing normal approved work controls.

Altho' ugh the components involved are balance-of-plant components, we are concemed that

similar deficiencies in operational analysis department work control activities may carry over

into activities involving safety related components.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice" a copy of this letter and its

- enclosures will be placed in the NRC Public Document Room.-

I

amssa

9903200227 990316

/y.

PDR

ADOCK 05000456

G

PDR

a_

,

-

__

I

,

.

O. D. Kingsley

-2

March 16, 1998

j

We will gladly discuss any questions you have concerning this inspection.

l

'

Sincerely,

/s/ H. O. Christensen for

John A. Grobe, Director

Division of Reactor Safety

Docket Nos. 50-456; Docket No. 50-457

License Nos. NPF-72; NPF-77

cc w/ encl:

M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager -

1. Johnson, Licensing Director

DCD - Licensing

T. Tulon, Site Vice President

Braidwood Station Manager

T. Simpkin, Regulatory

Assurance Supervisor

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

Distribution:

Docket File w/enci

DRP w/enci

PUBLIC IE-01 w/encI

TSS w/enci

A. Beach w/ encl

DRS (2)w/enct

Deputy RA w/ encl

Rlli PRR w/enci

Rlli Enf. Coord. w/ enc!

RAC1 (E-Mail)

SRI Braidwood w/ encl

IEO (E-Mail)

Project Mgr., NRR w/ enc!

DOCDESK (E-Mail)

GREENS'

DOCUMENT NAME: G:DRS\\ BRA 98003.DRS

v.

.

.

mu w e c - - - r.co .. - ~

,r.we.

i

j-

OFFICE

Rlli

(/[]e l6

Rlli

lE

Rlli

lC

Rlll

l/

I

,

'

NAME

Neisler:sd

Gardnerf);4/.,.

Jordan 45

Grobe (N

DATE

03/fl/98

03/// /98

6#V

03ht/98

03//4./98

fd

'

OFRCIAL RECORD COPY

_

.

..

.

.

--

-

-