Requests Addl Info Re Rev 19 to Northeast Utilities Quality Assurance Program,Millstone Nuclear Power Stations,Units 1,2 & 3
ML20216G409
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/13/1998
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To: Bowling M
NORTHEAST NUCLEAR ENERGY CO.
References
TAC-M95739, TAC-M95740, TAC-M95741, NUDOCS 9803190399
Download: ML20216G409 (5)


Text

g ne p

i UNITED STATES g

j NUCLEAR REGULATORY COMMISSION k

WASHINGTON, D.C. 3M64-0001

...../

March 13, 1998 Mr. Martin L. Bowling, Jr.

Recovery Officer-Millstone Unit No. 2 Northeast Nuclear Energy Company c/o Ms. Patricia A. Lo'.tus Director-Regulatory Affairs P. O. Box 126 Waterford, CT 06385

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING REVISION 19 TO THE NORTHEAST UTILITIES QUALITY ASSURANCE PROGRAM (NUQAP),

MILLSTONE NUCLEAR POWER STATION, UNITS 1,2, AND 3 (TAC NOS.

M95739, M95740, AND M95741)

Dear Mr. Bowling:

In proposed Revision 19 to the NUQAP submitted on June 3,1997, Northeast Nuclear Energy Company (NNECO) identified the role of the Yankee Atomic Electric Company (YAEC) as a contractor to Nuclear Materials and Document Management (NMDM) for the following activities:

(1) vendor audit function and retention of associated records (NUQAP Section 7.2.1 - Vendor Qurlifications), (2) vendor source inspection function (NUQAP Section 7.2.2 - Source inspection), and (3) reporting of vendor audit results (NUQAP Section 18.0 - Audits).

In light of the December 1,1997, acquisition of i.4EC assets by Duke Engineering and Services (DE&S), please provide information on the following:

(a) Describe the current role of YAEC with respect to activities described in the NUQAP approved by the NRC.

(b) Discuss whether NNECO has evaluated the DE&S purchase of YAEC with respect to the organizationai requirements of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 requirements. Specifically, address (1) interfaces between the YAEC and DE&S organizations with respect to NNECO's process for approval of suppliers, and (2) whether YAEC still exists as an organization conducting its activities under a 10 CFR Part 50, Appendix B, Quality Assurance (QA) program, which has been reviewed and approved by NNECO.

(c) Provide the rationale for concluding that the QA program functions previously performed by YAEC, that would now be performed by DE&S, would continue to satisfy the provisions in the NUQAP.

) 0 9803190599 980313 PDR ADOCK 05000245 P

PDR k (p i

1.

Q 1

o T

M. L Bowling March 13, 1998 Please respond to this request for additionalinformation within 30 days of receipt of this letter. If you have any questions on this matter, please contact me at (301) 415-1455.

Sincerely, Original _ signed by:

Stephen Dembek, Project Manager l

- Special Projects Office - Licensing l

Office of Nuclear Reactor Regulation Docket Nos. 50-245, 50-336, and 50-423 l

1 cc: See next page DISTR lBUTION:

W PNe!

l PUBLIC SPO-L Reading l

SPO Re.sding WTravers -

PMcKee LBerry SDembek OGC l

ACRS l.

JDurr, RI JPeralto (0-9A1)

DOCUMENT NAME: G:\\DEMBEK\\M95739.RAI to,,edve a cop r of this document, indcate in the bon' "C" = Copy wi attachment /sd)c, psure "E' = Copy with attachment / enclosure "N" = No copy 0FFICE SPO-L:PM

. 7_

SPO-L:LA t\\ l7'SPJ{-g/fh NAME SDeinbek

//T LBerryyj VR/

P W ee' DATE 03/I W 98~ P "

03/tg/98 " '

,03/(3'98 03i /98 03/ /98 0FFICIAt. RECORD COPY

4,-

l l..

M. L. Bowling l Please respond to this request for additionalinformation within 30 days of receipt of this letter. If you have any questions on this matter, please contact me at (301) 415-1455.

Sincerely,

/

/

v' Stephen Dembek, Project Mancger

~

Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-245,50-336, and 50-423 cc: See next page 1

l l

l l

A Northe:St Nuclear Energy Comp ny -

Millstone Nuclear Power Station, Units 1,2, and 3 cc:

Charles Brinkman, Manager Lillian M. Cuoco, Esquire Washington Nuclear Operations Senior Nuclear Counsel _

ABB Combustion Engineering Northeast Utilities Service Company 12300 Twinbrook Pkwy, Suite 330 P. O. Box 270 Rockville, MD 20852 Hartford, CT 061410270 Mr. D. M. Goa.:iel Mr. Kevin T. A. McCarthy, Director.

Vice President - Nuclear Oversight Monitoring cnd Radiation Division Northeast Utilities Service Company Department of Environmental P. O. Box 128 Protection Waterford, CT 06385

~

79 Elm Street Hartford, CT 06106-5127 Senior Resident inspector Millstone Nuclear Power Station Mr. Allan Johanson, Assistant Director clo U.S. Nuclear Regulatory Commission Office of Policy and Management P. O. Box 513 Policy Development and Planning Niantic, CT 06357 Division 450 Capitol Avenue - MS 52ERN Mr. David Amerine, Vice President P. O. Box 341441 Nuclear Engineering and Support Hartford, CT 06134-1441 Northeast Utilities Service Company P. O. Box 128 Regional Administrator, Region I Waterford, CT 06385 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. M. H. Brothers King of Prussia, PA 19406 Vice President - Operations Northeast Nuclear Energy Company First Selectmen P. O. Box 128 Town of Waterford Waterford, CT 06385 Hall of Records 200 Boston Post Road Mr. M. R. Scully, Executive Director Waterford, CT 06385 Connecticut Municipal Electric Energy Cooperative Mr. J. P. McElwain 30 Stott Avenue Recovery Officer-Millstone Unit 1 Norwich, CT 06360 Vice President (Acting)- Millstone Unit 3 Northeast Nuclear Energy Company Mr. William D. Meinert P. O. Box 126 Nuclear Engineer Waterford, CT 06385 Massachusetts Municipal Wholesale Electric Company

. Mr. Wayne D. Lanning P. O. Box 426 Deputy Director of Inspections Lud:ow, MA 01056 Special Projects offee 475 Allendale Road Emest C. Hadley, Esq.

King of Prussia, PA 19406-1415 1040 B Main Street P. O. Box 549 Mr. F. C. Rothen West Wareham, MA 02576 Vice President-Work Services Northeast Nuclear Energy Company Joseph R. Egan, Esq.

P.O. Box 128 Egan & Associates, P.C.

Waterford, CT 06385 2300 N Street, NW Washington, D.C. 20037

)

l ' :.

Northe:st Nuclear Energy CompIny i 5 Millstone Nuclear Power Station, Units 1. 2, and 3

_ 4, cc:

Citizens Regulatory Commission Mr. B. D. Kenyon ATTN: Ms. Susan Perry Luxton Chief Nuclear Officer - Millstone 180 Great Neck Road Northeast Nuclear Energy Company Waterford, CT 06385 P. O. Box 128 Waterford, Connecticut 06385 The Honorable Tony Concannon Nuclear Energy Advisory Council Deborah Katz, President Room 4035 Citizens Awareness Network Legislative Office Building P.O. Box 83 Capitol Avenue Shelbume Falls, MA 03170 Hartford, CT 06106 Mr. G. D. Hicks Unit Director-Millstone Unit 3 Northeast Nuclear Energy Company P. O. Box 128 Waterford, Connecticut 06385 Little Harbor Consultants, Inc.

Millstone -ITPOP Project Office P. O. Box 0630 Niantic, CT 06375-0630 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Mr, Daniel L. Curry Project Director Parsons Power Group inc.

2675 Morgantown Road Reading, PA 19607 Mr. Don Schopfer Verification Team Manager Sargent & Lundy 55 E. Monroe Street Chicago, IL 60603 Mr. P. D. Hinnenkamp Director-Unit Operations Northeast Nuclear Energy Company P. O. Box 128 Waterford, Connecticut 06385 Mr. J. A. Price Unit Director-Millstone Unit 2 Northeast Nuclear Energy Company P. O. Box 128 Waterford, Connecticut 06385

.