ML20216F750
| ML20216F750 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/22/1987 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Gallagher J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 8706300939 | |
| Download: ML20216F750 (4) | |
Text
_
?
19U j@ 2 2
' Docket Nos. 50-277 50-278 I
-Philadelphia' Electric Company ATTN: Mr. J. W. Gallagher Vice President Nuclear. Operations 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:
}
Subject:
Request For a Cost Estimate From Philadelphia Electric Company For the Installation of Additional Circuitry at the Peach Bottom Power Plant EOF and Permission to Use Site and Company Property For Contingency Telecommunications In the event of an emergency at a nuclear station, the NRC would request the
' Boise Interagency Fire Center (BIFC) to be dispatched to the site with radio equipment for promptly establishing an off-site communications network between the Emergency Operations Facility and the Federal off-site monitoring team.
'To accomplish'this goal, the NRC had a communications survey conducted by BIFC i
for each site nationwide. This survey identified the requirements for emer-gency radio-communication and any pre-installed equipment that would be nec-essary. The communications survey was conducted at the Peach Botto-facilities by an NRC. contractor representative on March 21, 1985.
Based on this survey, NRC Region I is now initiating arrangements.for the installation of contingency emergency telecommunications equipment at the-Peach Bottom. sites. We are seeking your cooperation and assistance in estab-lishing this capability.
Your assistance is requested to obtain (1) a cost estimate for the installation of additional telephone circuits in the Emergency Operations Facility (EOF), and (2) permission for the NRC to-install temporary antennas during emergencies, or as described below.
The circuits and antenna i
locations are essential elements of our emergency telecommunications plan for
'the Peach Bottom sites.
It should be noted that communications equipment, other than the additional' telephone circuits necessary to support them, will i
only be installed at the communications sites in the event of an actual emer-gency or NRC participation drill and will be removed immediately at the termination of the emergency or drill.
We are seeking Philadelphia Electric Company cost estimate for labor and
. material to permanently run three pair of twin lead shielded cables from the NRC room in the EOF to the roof area directly above the EOF complex.
These lines should be terminated at both ends with WE-742 connectors and should be marked for "NRC Emergency Use Only".
The roof terminations should be enclosed in a weatherproof box to protect them from the elements.
These lines will allow installation of the base station equipment required to establish commu-nications from the EOF to the NRC emergency repeater system. The WE-742 connectors will be supplied by the NRC.
neelCIAL RECORD COPY LTR BIFC - 0005.0.0 8706300939 870622 PDR ADOCK 05000277' 06/09/87
/
F PDR g %
j b
w, L
Philadelphia ~ Electric Company-2 7
- We'are also seeking Philadelphia Electric Company's long term permission'for
'the following', if it: should become necessary:
- 1.
Reserve for NRC.use the roof area above the EOF complex for, installation.
1 of. base' system equipment.
Reserve.' or NRC use the upper level of either one of the microwave
- 2.
f towers adjacent.to the North Substation or the Vent Stack just south'of.
~
the~same substat. ion for repeater equipment.
If.you agree to our request, please indicate in your' reply if the wiring installation for the EOF will be. performed by Philadelphia Electric Company, and if not', please provide a listing of preference for'sub-contractors.
Fol-
' lowing receipt of4 your estimate, NRC Region I will issue the necessary purchase order. Work'should not commence-prior to receipt of the purchase order.
i If you have any questions regarding the above,- please feel' free to contact
? Thomas E. Tuccinardi (215) 337-5390 of my staff.
Enclosed'for.your information are the frequencies that the NRC equipment may'.
use'at the Peach Bottom sites. We appreciate your assistance in this matter.
Sincerely, 0Figinal~ T~1e,5 BE
~
l l
Th as
.a n,
i ec k vision of Radiation Safety h
.and Safeguards:
Enclosure:
' Transmitter Frequencies cc w/ enc 1:
Public Document Room (PDR) p Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspectors - Units 2 & 3 John J. Tucker, Site Emergency Planning Coordinator Roberta Kankus, Director of Emergency Prepardeness K. Perkins, AE00 S. Cohen, TB
'D.
Herman, BI,FC Commonwealth of Pennsylvania bec w/ enc 1:
Region ~I Docket Room (w/ concurrences) 4 0FFICIAL RECORD COPY LTR BIFC - 0005.1.0 l
06/09/87
- L '-
. Philadelphia Electric Company 3
I
-i i
l i
i i
i RIr S
RI:DR RI:
1 Tuc nardi/mm/rw/ms li Lazarus 6/ /h/87 6/l]/87 6//g/87 RI:DRM RI:))h5 R:)
Mc0s r Be Wa M2 in
./87' 6//k87 6//h87 0FFICIAL RECORD COPY LTR BIFC - 0006.0.0 06/09/87 i
)
g<
- o 4
30 ENCLOSURE LThe frequencies that the NRC equipment may use at each site are as follows:
'E0F Complex Roof ~ Area Transmitter Frequencies 46.63 166.725 168.550 411.750 46.99 166 775 169.350 411.925 46.81-168.250 169.100 412.150 168.400 165.6625 412.200 166.6125 417.300 167.100 417.350 169.750 417.500 417.800 Repeaters Site Transmit Receive Transmit Receive Transmit Receive 49.73 46.63 168.400 166.6125 411.750- 417.300 49.77 46.99 167.100 169.750 411.925 417.350' 49.91 46.81-169.350 166.725 412.150 417.500 412.200 417.800 All. power levels will tar at 6 watts or less.
OFFICIAL RECORD COPY LTR BIFC - 0007.0.0 06/09/87