Forwards Monthly Operating Repts for Mar 1998 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Operating Repts for Feb 1998 for Limerick Generating Station,Unit 1
ML20216F320
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/12/1998
From: Grimes J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216F325 List:
References
NUDOCS 9804170030
Download: ML20216F320 (1)


Text

Limsrick Gsnerating Station

E.

PECO NUCLEAR fs'fdia' "*"'

s u- <n nco a n

'"""" * "^ " " #

I l

l T.S.6.9.1.6 Ako /

-March-12,1998 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of March 1998 forwarded pursuant to Technical Specification 6.9.1.6.

In addition, revised sheets for Limerick Unit 1 February report are enclosed. The shutdown hours (147.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />) attributed to the repair of the HPCI Exhaust valve included additional hours after the turbine was on-line. The correct number of outage hours attributed to this valve is 132.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> which also changes the total shutdown hours to 217 hours0.00251 days <br />0.0603 hours <br />3.587963e-4 weeks <br />8.25685e-5 months <br />.

Very truly yours, Joseh P. Grimes j

Director - Site Engineering i

vta Enclosures cc:

H. J. Miller, Administrator, Region I, USNRC l

A. L. Burritt, USNRC Senior Resident Inspector LGS g

J. D. von Suskil, Vice President, LGS l

.nu O

,y 9804170030 900412 PDR ADOCK 05000352 R

PDR