l t
WGINIA Ei.ecruic Asi> Powen CO%II%NY Riemioso, bois:4 2.u6:
April 9, 1998 United States Nuclear Regulatory Commission Serial No.98-190 Attention: Document Control Desk NL&OS/MAE R0 Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTitlC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT REVISION 33 Pursuant to 10 CFR 50.71(e), Virginia Electric and Power Company submits Revision 33 to the Updated Final Safety Analysis Report (UFSAR) for North Anna Power Station. This revision updates only Chapter 17 of the UFSAR which contains the Operational Quality Assurance (QA) Program and contains all changes to Chapter 17 since the last update. These changes to the program description do not reduce the commitments contained therein. This revision is being made at this time to support the licensing of the North Anna Independent Spent Fuel Storage Installation.
Two of the specific changes included are the use of optical disks for document storage and the clarification of the use of summary reports for inservice inspection quality assurance records.
As discussed in the NRC counterparts meeting on March 12,1998, Virginia Power has begun storing quality assurance records in electronic form on optical disks. This method of storage meets the intent of Generic Letter 88-18, dated October 20,1988. Also, the summary report of the inspection of steam generator tubing during inservice inspections will be treated as the quality assurance record documenting the results of the inspection.
One signed original and ten copies of Revision 33 to the UFSAR are enclosed. Each revision package contains replacement instructions for existing pages.
As a duly authorized officer of the Virginia Electric and Power Company, i hereby certify that the information given in the enclosed Revision 33 of the UFSAR Y
O
~ \\ \\\\
I 9804170002 98i)409 PDR ADOCK 05000338 K
PDR J
u
r accurately presents changes to Chapter 17 since the UFSAR was last updated.
l l
Very truly yours,
\\
\\
l f
3s P. O'Hanlon o.
l Senior Vice President - Nuclear Enclosures
)
Commitments made by this letter: None I
cc:
U.S. Nuclear Regulatory Commission Region ll Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station Mr. J. W. Shea Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission, Mail Stop 14-H-22 Washington, D. C. 20555 l
9 I
l l
COMMONWEALTH OF VIRGINIA )
)
i COUNTY OF HENRICO
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. P. O'Hanlon, who is Senior Vice President -
Nuclear, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and i
belief.
Acknowledged before me this day of, A2/
.19d.
My Commission Expires: L
/h4 3/
,19.f8_.
O i
i l
-lAb' hl/
Notiiry Public~ ~~
I (SEAL) l i
L
i 1
Page1of1 NORTH ANNA POWER STATION UNITS 1 AND 2 UFSAR REVISION 33 INSTRUCTIONS These instructions apply for implementing Revision 33 of the North Anna Updated Final Safety Analysis Report (UFSAR). The UFSAR update package consists of:
(1) Instruction Sheet (1) Revision Summary (1) List of Effective Pages (1) Section 17.2 Replacemt o' Pages UPDATE INSTRUCTIONS
- 1. In Volume I, remove and discard the Revision Summary (Revision 32-2/11/98).
- 2. Insert the enclosed Revision Summary (Revision 33-3/31/98) Replacement Pages.
- 3. In Volume I, remove and discard the entire List ofEffective Pages (Revision 32-2/11/98).
- 4. Insert the enclosed List ofEffective Pages (Revision 33-3/31/98).
- 5. In Volume IV, remove and discard the entire contents of Section 17.2 (Revision 32-2/11/98)
(i.e., all pages following Tab 17.2).
- 6. Insert the enclosed Section 17.2 (Revision 33-3/31/98) Replacement Pages.
- 7. In Volume I, initial and date the Record of Changes & Revision Summary to reflect completion of these instructions.
l l
l 1
l l
J
9 Revision Summary Replacement Pages
Revision 33-3/31/98 NAPS UFS AR 1
t l
RFMISION
SUMMARY
Revision 33 1
Section Changes 17.2, 17.2.1.2, Deleted reference to the Nuclear Operations Department Standards and 17.2.2.1,17.2.3, replace with Nuclear Business Unit Standard. Added position of Project 17.2.4,17.2.5, Manager (Configuration Management).
Figure 17.2.1-1, and Table 17.2-0 17.2.1.1 and Clarified organizational position descriptions by noting responsibilities for 17.2.1.2 the ISFSI as they already exist.
17.2.1.2, Deleted the position of Supervisor Administrative Services in the Nuclear Figure Management organization and assigned duties and responsibilities to other 17.2.1-2, and positions.
Figure 17.2.1-3 17.2.2.6 and Provided clarification of Quality Inspection Coordinator qualifications.
17.2.2.8 17.2.17, Tables Added Generic Letter 88-18 commitment regarding storage of quality 17.2-2 and assurance records on optical disk media.
17.2-3 Table 17.2.0 Added provision for storage of quality assurance records in an approved offsite facility.
Table 17.2-0 Provided an additional alternative to ANSI /ANS 3.1.
Tables 17.2-2 Clarified the description of ensite and offsite nuclear safety review and 17.2-3 committees.
Revision 32 Section Changes Foreword Updated to reflect recent NRC initiatives regarding UFSAR submittal requirements, and adequacy and consistency of design basis information; and to note Virginia Power's adoption of electronic methods to enhance UFSAR maintenance, and UFSAR distribution in both hardcopy and electronic media.
Tables 3.9-1 &
Updated to reflect current plant configuration.
3.9-2 f
I 3.10.2 & 3.10.3 Deleted references to Virginia Power Engineering standards STD-CEN-0020, STD-CEN-0026, and STD-GN-0038 a
Revision 33-3/31/98 NAPS UFSAR
- 2 Revision 32 (continued)
Section Changes 4.1 Revised to indicate that fuel assemblies may be used that differ from those described in the UFSAR-with an NRC-approved exemption or license condition.
4.2.3 Revised to reflect removal of secondary neutron sources starting with the Unit 1 Cycle 13 reload core; secondary source replacement in future reloads is optional.
5.2.4.1.1 Eliminated seismic qualification requirements for the Containment Gaseous and Particulate Radiation Monitoring System. Added procedural requirements for system operability verification after a seismic event.
6.2.1.2.18 New section to describe lead blanket shielding storage boxes, explain why they are not designated Seismic Category I, and provide references to drawings that depict storage box locations.
7.2.2.2.1.7 Revised reactor trip breaker test procedure.
7.2.2.3.5 Added discussion of IEEE-279 control and protection interaction criteria as they apply to steam generator Jow level /high steam-feed flow mismatch trip channels.
8.3.1.1 Clarified the "C" containment air recirculation cooler fans operating description.
9.3.4.2.2.3 Clarified that the mixed-bed demineralizer may be removed from service if primary coolant activity is within normal limits.
9.5.3 Added High Pressure Sodium among types of non-containment normal lighting.
9.5.4.2 Revised duration of full-load operation with minimum allowed day tank inventory.
13.7 Deleted references to Regulatory Guide 1.17 and Section 2.790. Added references to 10 CFR 73, Sections 21,55,56,57, and Appendices B & C.
15.2.12 Revised to reflect reanalysis to support Virginia Power's Accident Analysis Design Basis Document project.
15.2.14 Revised to reflect the results of an extended Virginia Power evaluation of the
" Spurious Operation of the Safety Injectiou System at Power" event.
15.4.3.1 Deleted paragraphs that referred to the configuration of steam generators just before the repair project that included replacement of the tube bundles.
Table 17.2.0 Deleted reference to the Surry Training Center records vault.
L
l Revision 33-3/31/98 NAPS UFSAR
'3 I
Revision 32 (continued)
Section Changes l
Tables 17.2-2 Corrected typos.
l
& 17.2-3 Clarified record retention requirements.
i l
All
. Consolidated l'7 volumes to 8 volumes l
(no change
- Referenced Station Drawings previously included in UFSAR: inserted bars) simplified diagrams
. Removed notations associated with previously deleted material and renumbered sequentially Renumbered previously inserted items that had suffixes (e.g.,4A,4B) l
- Applied consistent typeface and page layouts
- Improved consistency of measurement notation (e.g., time, mass, velocity), including abbreviations l
l
[
i l
l I
Revision 33-3/31/98 NAPS UFSAR
'4 Intentionally Blank l
9 i
List of Effective Pages Replacement Pages
l Revision 33-3/31/98 NAPS UFS AR LEP-1 LIST OF EFFECTIVE PAGES
- VOLUME I -
General Table of Contents (Note: Repeated in each volume)
First Page Last Page Revision TOC-i TOC-vi Revision 32-2/11/98 l
Foreword First Page Last Page Revision I
6 Revision 32-2/11/98 List of Effective Pages First Page Last Page Revision i
LEP-1 LEP-8 Revision 33-3/31/98 Key Word Index First Page Last Page Revision KWI-l KWI-90 Revision 32-2/11/98 Chapter 1 First Page Last Page Revision 1-i 1-iv Revision 32-2/11/98 1.1-1 l'.1-2 Revision 32-2/11/98 1.2 1 1.2 14 Revision 32 2/11/98 Revision 32-2/11/98. - - -.. _ - - -. -
1.3-1 1.3-26 l
~
~
~ ~ Revision 32-2/11/98 1.4-l 1.4-10 1.5-1 1.5 26 Revision 32-2/11/98
- -Revision 32-2/11/98-.. -.... -
1.6-1 1.6-4 Chapter 2 i
First Page Last Page Revision 2i 2-x Revision 32-2/11/98 l
2.1-1 2.1-26 Revision 32-2/11/98 2.2-l 2.2-10 Revision 32-2/11/98
'2.3-1 2.3-76 Revision 32-2/11/98 2.4-1 2.4-54 Revision 32-2/11/98 l
_2.5-1 2.5-36 Revision 32-2/11/98 1
l l
l
)
Revision 33-3/31/98 NAPS UFSAR LEP-2 Chapter 2 (continued)
First Page Last Page Revision 2Ayi 2A-vi Revision 32-2/11/98 2A-1 2A-40 Revision 32-2/11/98
~~
Z 71I98
~ I Att. I-1 ~5A Att. l-if IEisIon~52
~~
2 2
~ ~ ievision 32--2/11/98
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~
2n' ti~~2 i~ ~2 5tt.2 72 l
~
~
~
~'
~ d Att. 3-1~ ~ ' 25 ~Att."3-58 ~ Revision 32--2/11/98 2
~ XXtt. 4-1 2A Att.4-46 RevisionW2/il/98
~
~~
2 Seismic Survey of the North Anna Power Station, Virginia Electric and Power Company Prepared for Stone & Webster Engineering Corporation by Weston Geophysical Engineers, Inc.; UFS AR pagmation does not appear on 22 pages that follow 2B-2, which were taken from original report and are not subject to revision.
Report on Fcmndation Studiesfor the Proposed North Anna Power Station in Lentisa County, Virginia: Prepared by Dames & Moore; UFS AR pagination does not appear on 52 pages that follow 2C-2, which were taken from original report and are not subject to revision.
- VOLUME II Chapter 3 First Page Last Page Revision
{_
I On
...3.2 1 3.2-22 Revision 32_2/11/98__. _ __. _.. _ _
3.3-4 Revision 32-2/11/98 3.3-1
........ - - -..3.7-112.
-. Revision 32-2/11/98 3.7-1 3
. - ~_.
6,,._._..
i Revision 33-3/31/98 NAPS UFSAR LEP-3 J
j
- VOLUME III-Chapter 3 (continued)
First Page Last Page Revision 3/
3-xiv Revision 32-2/11/98 3A. ~ ' _.3A-viii ~
.._3A-1 3A-30_ _ _ -
' Revision 32._2/11/98 Revision 32-2/11/98
~3 B' ~1 _._._ 3 B-20 ~
Revision'32-2/11/98
~
~3D-1' 3D-234 '
Revision 32--2/11/98
~~
~
i The Fremklin Institute Research Laboratories Technical Report F-C3486, Testing of Protective Coatings underDesign Basis Accident Environment, dated April 1973; UFS AR r
I pagination does not appear on 232 pages that follow 3D-2, which were taken from original report and are not subject to revision.
3E i 3E-vi Revision 32-2/11/98 3E-1 3E-116 Revision 32-2/11/98
' 3E Ait.1-1" ~ ~3E XitIl~2FRevisiin~32-2/l"I/98~~
~
~~ ~ ~ ~ ~ ~ - ~ ~
)
~
~
Geotechnical Engineers Inc. Report on Cyclic Triaxial Tests on Soil Samples Service Water Reservoir, dated December 5,1975: UFS AR pagination does not appear on 23 pages between 3E Att.1-2 and 3E Att.1-26, which were taken from original report and are not subject to revision.
Geotechnical Engineers Inc. Report on Cyclic Triaxial Tests on Soil Samplesfrom the Service Water Reservoir, dated December 31,1975; UFS AR pagination does not appear on 16 pages that follow 3E Att. 2-4, which were taken from original report and are not subject to revision.
3E Att. 3-1 3E Att. 3-60 Revision 32-2/11/98 Geotechnical Engineers Inc. Report on Laboratory Soil Testing, dated June 2 l, l976; UFSAR pagination does not appear on 56 pages that follow 3E Att. 3-4, which were taken from original report and are not subject to revision.
M ^"b..
b"II.L. R@@on p-2/11j_{,_],_
_,___,_ _ _]_
~
3E Att. 4-1 3E Att.4-68 Revision 32-2/11/98
~3E ti.5i 3E ti~5-Iv~~Revis' Ion ~32-2/II9ti ~
~ ~
~ ~'
^5E AtiT-T-35fAttXI0~-Revisiim~35 __2/lI58_. _ _ _ _ _. _. _. _. -. _ _. -. _
~
~ ~ ~ ~ ~
~
~
..3F-i
.. _ _ Revision 32-2/11/98 3F-vi i
t j
i Revision 33-3/31/98 NAPS UFSAR LEP-4
- VOLUME IV -
Chapter 4 First Page Last Page Revision 4-i 4-viii Revision 32-2/11/98 n3 1
._4.2-1.. _ _ _. _ _........... _ _ _. _ Revision 32-2/11/98 4.2-90 v
n3 Chapter 5 First Page Last Page Revision 5-i 5-viii Revision 32-2/l l/98
_5.1-1 5.1-14 Revision 32-2/11/98__
._5.3-1__ _ 5.3-2. _ _ _ Revision 32--_2/11/98_ _ _______ __ _ _
5.2 _i 5.2 98 Revision 32-2/11/98
' 5.4-1
~5.4d0
' Revision 32--2/fl/98 5 ~
5.5-90 Revision 32--2/11/98
. 5 _1__
5.6-10____ _. Revision 32 2/11/98 _ __ ___
5.6-1 5A-1 5A-166_ _ _
Revision 32-2/11/98 _
Discussion between the Nuclear Regulatory Commission and Virginia Electric & Pcwer Company on Steam Generator Lower and Reactor Coolant Pump Supportsfor North Anna Units No. / and 2, Transcript, dated April 13,1976; corrected copy of transcript, dated May 18,1976; UFSAR pagination does not appear on 164 pages that follow SA-2, which were taken from original report and are not subject to revision.
~ 4 Att.'l-32 ' Revision 32 - 2/11/98
~
5A Att.1-1 5
- VOLUME V -
Chapter 6 First Page Last Page Revision 6-i 6-xii Revision 32-2/11/98 6.1-1 6.1-4 Revision 32-2/11/98 6.2-l 6.2-340' Revision 32-2/11/98
~
~
~
6.3-1 6.3-74 ' ~
~ Revision 32--2/11/9'8
~
~
~
6.4-1 6.4-18 Revision 32-2/11/98 6A-i 6A-iv Revision 32-2/11/98 6A-1 6A-6 Revision 32-2/11/98 m
i l
Revision 33-3/31/98 NAPS UFSAR LEP-5 Chapter 7 First Page Last Page Resision 7-i 7-viii Revision 32-2/11/98
'7.'l-1 ~
~ ~ '7.1 - 14 R' vision 32--2/11/98
~
e l
7.2-1 7.2-54
. _ _... Revision 32. 2/11/98 7J-1 ~'
~
' Revision 32--2/11/98 "
~
~
~
7.4-8 7.5-1 Revision 32-2/11/98
..7.5.20-....-
7.7-1
~7.7-42 Revision 32--2/11/98~~
' ~ ~
7.8-1 7.8-2 Revision 32.2/11/98- _ _ _ _ _ _ _ _. _ _ _ - _ _. _. _ _.
- VOLUME VI -
Chapter 8 First Page Last Page Revision 8i 8.iv..
. Revision 32. 2/11/98..
8.1-1 8.1 -6 Revision 32-2/11/98 8.21 8.2 44 Revision 32 2/11/98
-.... - _ Revision 32-2/11/98.......
8.3-1 8.3-60 Chapter 9 First Page Last Page Revision 9-i
.-x..
9 Revision 32 2/11/98 9.1-1.. -.
9.1-50 Revision 32-2/11/98 9.2-1 9.2-62 Revision 32-2/11/98
~ ~ M-34 Revision'32-2/l'l'/98 ~~
~
9N-1 '
9 9.5-1 9.5-82 Revision 32 2/11/98
. _ ~.
9.6.I 9.6-10 Revision 32-2/11/98 9A-i 9A-vi ~
Revision 32-2/11/98
~
~
...9A.1... _..
_ Revision 32.2/11/98..... _. _. _. _. _ _ _
9A-22 98-1 9B-16 Revision 32-2/11/98 l
l
Revision 33-3/31/98 NAPS UFSAR LEP-6 1
- VOLUME VII Chapter 10 First Page Last Page Revision 10-i 10-iv Revision 32-2/11/98 10.1-4 Revision 32-2/11/98
-10.1.1..
10.4-1 10.4-60 Revision 32-2/11/98 Chapter 11 First Page Last Page Revision 11-i l1-vi Revision 32-2/11/98 11.2-1 11.2-58 Revision 32-2/11/98 1
-l
'~~~"11.4-18~
~ Revision 32-2/11/9'8 '
~ ~~
~~~
l1.5-1 11.5-14 Revision 32-2/11/98
~1 l'A i l 1 A-iv Revision 32-2/11/98~
~ ~ ~
~
~~ ~
~ ~ ~
~
~
l 1 A-1 11 A-4 Revision 32-2/11/98
' Rev'ision 32-2/11/98~~ ~
~ '
~
~~~ ~~
~1 l'II-l ~~
~11B-32
~
T l IC-i 1IC-vi Revision 32-2/11/98 Chapter 12 First Page Last Page Revision 12-i 12-iv Revision 32-2/11/98 "12-1
~ ~ ~ 12-2'
' Revision 32-2/ll/98'
~~ '
~~
~~
~
12.1-1 12.1-44 Revision 32-2/11/98 12.4 Revision 32. _.2/11/98.
12.4 1
...... -2 __
.. _ _12A-i._.
_. _ Revision 32-2/11/98 12 -l
~
' 12 A-20
~ Revision'32-2/11/98'
~
~
~'
~
~
L
Revision 33-3/31/98 NAPS UFSAR LEP-7 l
Chapter 13 First Page Last Page Revision 13-i 13-il Revision 32-2/11/98 I
_[3,2i__
133-4 __ Revision 32-2/11/98 _
Revision 32--2/11/98 13.3-1 13.3-2 13.5-1 13.5-2 Revision 32-2/11/98 13 3-1 ~
~l3.7-2"
~ ' Revision'32-2/ll/98~ ~
~
Chapter 14 First Page Last Page Revision 14-i 14-iv Revision 32-2/11/98 14
~ Revision 32-2/11/98
~
14 1...-..__.-4.
14.2-l~
14.2-2 Revision 32--2/11/98 ~
~~
~
14A-i Revision 32-2/11/98
... _..14A.iv. _. _ _..
- VOLUME VIII -
Chapter 15 First Page Last Page Resision l
15-i 15-xiv Revision 32-2/11/98
~15-i~ ~
'15-4'
' Revision 32-2/1098~
~
'~'
~ ~ ~
~'
15'.1-1
~ Revision 32-2/11/98
'15.1-3'4 Revision 32-2/11/98
._.15.4.1. _ _..-15.4.144 15'A'-l ~
15A-2' Revision 32-2/l'l/98 15A Att.1-1 15A nt' l-54 Revision 32-2/11/98 Nuclear Energy Service.:. Inc. report on Spent Fuel Cask Drop Analysisfor North Anna PowerStation Units 1 & 2, h'ES 81 A0478, dated August 23,1976; UFS AR pagination not applied to 52 pages that follow 15A Att.1-2, which were taken from original report and are not subject to revision.
I J
5 Revision 33-3/31/98 NAPS UFSAR LEI -8 Chapter 16 First Page Last Page Revision 16-i 16-ii Revision 32-2/11/98 16.1-1 16.1-2 Revision 32-2/11/98 16.2-1 16.2-2 Revision 32-2/11/98 Chapter 17 First Page Last Page Revision 17 i 17 Revision 32 2/11/98
.-.....-.....-......-il...... _.. -. -. - -. - -. - -.. -. -. - - -. - -
17.1-1 17.1-2 Revision 32-2/11/98 I7.2-i I7.2-vi
~ Revision 33-3/3I/98~
~~
~~ ~
~
~
~
~
~
~
~
~~
17.2-1 17'2-104 Revision 33--3/31/98 L
e l
f 17.2 Replacement Pages
-