ML20216E996

From kanterella
Jump to navigation Jump to search
Forwards Rev 7 to AP-470, Loss of Instrument Air & Rev 25 to AP-770, EDG Actuation
ML20216E996
Person / Time
Site: Crystal River 
Issue date: 04/09/1998
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216F000 List:
References
NUDOCS 9804160375
Download: ML20216E996 (1)


Text

1 l

Document Transmittal #: 92800 Date: 4/9/98 I

Tc:

NRC (DC DESK)

MAC: N/A Destination:

==

Description:==

Copy Copy Totals Document:

Revision:

Comment:

INFO CNTL MSTR

)

APO470 07 MINOR CHANGE 7

1 0

0 AP0770 25 MINOR CHANGE 7

1 0

0 1

i l

I l

l 1

\\1

)

l

)

Y fC l

I Instructions to the Addressee.

1 Pl3ase verify the document (s) received agrees with the above information.

Operations department must attach old document (s) or portions of document (s) superseded by the above l

to this transmittal.

l Th3 signature indicates acknowledgment of receipt of the above document (s) and that documents have l

beIn updated. Retum signed and dated transmittal to Document Control within 15 working days of transmittal date to mail code:

1 NA1C Florida Power Corporaten Document Control, NA1C Crystal River Energy Complex 15760 W. Power Line St.

Crystal River, FL 3442&4708 Signature of Addressee:

Date:

)

9804160375 900409

~

l PDR ADOCK 05000302 P

PDR