ML20216E996
| ML20216E996 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/09/1998 |
| From: | FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20216F000 | List: |
| References | |
| NUDOCS 9804160375 | |
| Download: ML20216E996 (1) | |
Text
1 l
Document Transmittal #: 92800 Date: 4/9/98 I
Tc:
NRC (DC DESK)
MAC: N/A Destination:
==
Description:==
Copy Copy Totals Document:
Revision:
Comment:
INFO CNTL MSTR
)
APO470 07 MINOR CHANGE 7
1 0
0 AP0770 25 MINOR CHANGE 7
1 0
0 1
i l
I l
l 1
\\1
)
l
)
Y fC l
I Instructions to the Addressee.
1 Pl3ase verify the document (s) received agrees with the above information.
Operations department must attach old document (s) or portions of document (s) superseded by the above l
to this transmittal.
l Th3 signature indicates acknowledgment of receipt of the above document (s) and that documents have l
beIn updated. Retum signed and dated transmittal to Document Control within 15 working days of transmittal date to mail code:
1 NA1C Florida Power Corporaten Document Control, NA1C Crystal River Energy Complex 15760 W. Power Line St.
Crystal River, FL 3442&4708 Signature of Addressee:
Date:
)
9804160375 900409
~
l PDR ADOCK 05000302 P