Text
-_
g
- ^
i Northem States Power Company i
Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 March 20,1998 10 CFR SO Section 50.54(a)
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License No. DPR-42 50-306 DPR-60 Submittal of Revision 21 of the Operational Quality Assurance Plan (OQAP)
Pursuant to 10 CFR 50 Section 50.54(a), Revision 21 to the Northern States Power Compsny Operational Quality Assurance Plan (OQAP) is submitted.
The changes included in Revision 21 do not reduce the commitments in the quality assurance program previously accepted by the NRC. The basis for this conclusion is provided by Appendix D of the enclosure.
Please call Marc Voth at 612-271-5116 or John Mestad at 612-337-2208 if there are any ue tions.
q/
7 fha
,! R er O. Anderson Director, Nuclear Energy Engineering Depart sent i
I c:
Regional Administrator-lli, NRC i$
A./ {
[j c
} (#
NRR Project Manager (Monticello), NRC
/
NRR Project Manager (Prairie Island), NRC Sr. Resident inspector (Monticello), NRC Sr. Resident inspector (Prairie Island), NRC State of Minnesota, Attn: Kris Sanda J. Silberg
.... v A A : i l
Enclosure:
NSP's Operational Quality Assurance Plan, Revision 21 9804150183 980320 PDR ADOCK 05000263 P
l
.c NORTHERN STATES POWER COMPANY OPERATIONAL QUALITY ASSURANCE PLAN GENERATION QUALITY SERVICES I
\\
OQAP Contents Revision 13 Alarch 20,1998 l
Section Revision Iills Contents 13 Operational Quality Assurance Plan Nuclear Operations Contents 1
OQAP 21 Operational Quality Assurance Plan i
Appendix A 21 Monticello Stmetures, Systems, and Components Subject to Appendix B of 10CFR50 Appendix B 21 Prairie Island Structures, Systeras, and Components Subject to Appendix B of10CFR50 Appendix C 21 Nuclear Plant Fire Protection Program Appendix D 21 Revision 21 Change Summary Section Revision Title ANSI N18.1 1971 Selection and Training of Nuclear Power Plant Personnel Reg Guide 1.8 1-R Personnel Selection and Training ANSI N18.7 1976 Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants I
Page 1 of 4
NORTHERN STATES POWER COMPANY i
OPERATIONAL QUALITY ASSURANCE PLAN GENERATION QUALITY SERVICES OQAP Condents Revisir.n 13 March 21,1998 Section Revision Iillg.
ANSI N45.2 1971 Quality Assurance Program Requirements for Nuclear Power Plants ANSI N45.2.1 1973 Cleaning ofFluid Systems and Associated Components During Construction Phase of l
Nuclear Power Plants Reg Guide 1.37 3-16-73 Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants i
ANSI N45.2.2 1972 Packaging, Shipping, Receiving, Storage and Handling ofItems for Nuclear Power Plants Reg Guide 1.38 2
Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants ANSI N45.2.3 1973 Housekeeping During the Construction Phase of Nuclear Power Plants Reg Guide 1.39 1
Housckeeping Requirements for Water-Cooled Nuclear Power Plants j
l ANSI N45.2.4 1972 Installation, Inspection, and Testing l
Requirements for Instrumentation and Electric j
Equipment During the Construction ofNuclear i
Power Generating Stations 1
Page 2 of 4
('
T NORTHERN STATES POWER COMPANY OPERATIONAL QUALITY ASSURANCE PLAN GENERATION QUALITY SERVICES OQAP Contents Revision 13 March 20,1998 Section Revision Iitig Safety Guide 30 8-11-72 Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment ANSI N45.2.5 1974 Supplementary Quality / ;surance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Constmetion Phase of Nuclear Power Plants Reg Guide 1.94 1
Quality Assurance Requirements for Installation, Inspection, and Testing of Structural concrete and Structural Steel During the Construction Phase of Nuclear Power Plants ANSI N45.2.6 1978 Qualifications ofInspection, Examination, and Testing Personnel for Nuclear Power Plants Reg Guide 1.58 1
Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel ANSI N45.2.8 1975 Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants ANSI N45.2.9 1974 Requirements for Collection, Storage, and Maintenance of Quality Assurance Records for Nuclear Powei Plants Reg Guide 1.88 2
Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records Page 3 of 4
NORTIIERN STATES POWER COMPANY OPERATIONAL QUALITY ASSURANCE PLAN GENERATION QUALITY SERVICES OQAP Contents Revision 13 j
i March 20,1998 Seglinn Revision Tith ANSI N45.2.10 1973 Quality Assurance Terms and Definitions Reg Guide 1.74 2-74 Quality Assurance Terms and Definitions ANSI N45.2.11 1974 Quality Assurance Requirements for the Design of Nuclear Power Plants Reg Guide 1.64 2
Quality Assurance Requirements for the Design of Nuclear Power Plants ANSI N45.2.12 1977 Requirements for Auditing of Quality Assurance Programs for Nuclear Power Plants ANSI N45.2.13 1976 Quality Assurance Requirements for Control of Procurement ofItems and Services for Nuclaar Power Plants ANSI N45.2.23 1978 Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants Reg Guide 1.146 8-80 Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants ANSI N101.4 1972 Quality Assurance for Protective Coatings Applied to Nuclear Facilities Reg Guide 1.54 6-73 Quality Assurance Requirements for Protective Coatings Applied to Water-Cooled Nuclear l
Power Plants l
\\
l Page 4 cf 4 l