ML20216C760
| ML20216C760 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/22/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20216C763 | List: |
| References | |
| NUDOCS 8706300353 | |
| Download: ML20216C760 (2) | |
See also: IR 05000498/1987027
Text
g
..
I
D>
JUN 2 21987
In Reply Refer To:
Docket: -50-498/87-27
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group
Vice President, Nuclear
'P. O. Box 1700
Houston, TX' 77007
Gentlemen:
l
This refers to the inspection conducted by Mr. J. I. Tapia of this office
during the period May 18-21 and June 8-11, 1987, of activities authorized by
"
.'
L
NRC Construction Permit CPPR-128 for the. South Texas Project, Unit 1, and to
the discussion of our findings with'Mr. S. Head and other members of your staff
.
-at the conclusion of the inspection.
!
Areas examined during the inspection included verification of the as-built
configuration of selected' structural steel assemblies.
Within this area, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspector.
During'this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to.
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the' specifics contained
in the Notice of Violation enclosed with this letter.
Details of this inspection will be included in.a report to be issued in.the
near future and' identified as NRC Inspection Report 50-498/87-27.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act.of 1980, PL 96-511.
Should you have any questions concerning this inspection, we'will be pleascd to
,
discuss them with you.
Sincerely,
Odg1nal Signhd By
i
E. H. Johnson
J
l
J. E. Gagliardo, Chief
.
Reactor Projects Branch
l
Enclosure:
(see next page)
RIV: rih
C:0S h
P
- RP
C:RSB
C:RPB k
JITapia/cz
DMHunnicutt
aylor[G aristable TFWester an JEGagliardo
l[
b A9 /87
to/l4/87
(olt{/87 ' (p/1 Y87
f,//9/87
6/12/87 Y
8706300353 a70622
r
DR
ADDCK 0500
8
L
_ _ - _ _ _ _ _ _
___
,
..
sw
,
Houston' Lighting & Power Company
2-
-
-l
Enclosure:,
Appendix - Notice of Violation
t
,
cc w/ enclosure:
,
.
!
' Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. 0.' Box 1700
T-
Houston, Texas ~
77001
Houston Lighting &' Power Company
ATTN: Gerald E. Vaughn,.Vice President
Nuclear Operations
P. O. Box 1700
Houston, Texas
!77001
Texas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
)
Leol
- RRI-0PS-
R.
D.- Martin, RA
- )'
!
- RRI-CONST.
- Section Chief (RPB/C)
'
RPSB
- MIS System
- RIV File
- D. Weiss, RM/ALF
- RSTS' Operator-
R. Pirfo, 0GC
L
- R. G. Taylor, RPB/C
- RSB
- Project Inspector, RPB
- R. Hall-
l
NRRProjectManager
- J. Tapia
l;
- Section Chief (RSB/05)
- w/766
L
d
!-
l
3
_:
.
(
,
i.
' ~ _ _
______i___________._____.___m._
_ _ _ _ _ . - _ _ _ . _ _
__m_
--. ______.__ -- _______....__-- - --_ .-____