ML20216C703

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-361/97-17 & 50-362/97-17 on 970706- 0816 & NOV
ML20216C703
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/04/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20216C709 List:
References
50-361-97-17, 50-362-97-17, NUDOCS 9709090124
Download: ML20216C703 (4)


See also: IR 05000361/1997017

Text

. _ _ _ _ _ _

. _ _ _ _ _ ___- ______________- ________-_________ _ _ __ _ ___

O'

  • "%, UMit t D $1 ATE S

.

.f NUCLEAR REGULATORY COMMISSION

[h 8*

,\5 ntoioN iv

611 RY AN PL AZ A DRIVE sUlit 400

.

,

3 / A f4 LING T ON, i t x A S 76011 8064

3....*

SEP , 41997

Harold B. Ray, Executive Vice Presioent

Southern California Edison Co.

San Onofre Nuclear Generating Station

l

P.O. Box 128

San Clemente. California 92674-0128

SUBJECT: NRC INSPECTION REPORT 50 361/97 17:50 362/97 17 AND NOTICE OF

VIOLATION

Dear Mr. Ray:

An NRC inspection was conducted July 6 through August 16,1997, at your San Onofre

Nuclear Generating Station, Units 2 and 3 reactor facility. The enclosed report presents

the scope and results of that i,spection.

During the 6-week period covered by this inspection, your conduct of activities at

San Onofre was generally characterized by safety conscious operations, sound engineering

and maintenance practices, and careful radiological work controls. This was especially

significant given the challenges posed by the dual unit outage. However, weaknesses in

operator attention to detail, knowledge of plant conditions, procedural adherence, the

communication of management expectations, and the overall quality of operational

procedures were noted. Your continued attention is warranted.

in addition, baseo on the results of this inspection, the NRC has determined that four

violations of NRC requirements occurred. These violations are cited in the enclosed Notice

of Violation (Notice) and the circumstances surrounding the violations are described in

detail in the enclosed report. Please note that, for Violations A, B, and D, you are required

to respond to this letter and should follow the instructions specified in the enclosed Notice

when preparing your response. The NRC will use your response, in part, to determine

whether further enforcement action is necessary to ensure compliance vf.th regulatory

requirements.

The NRC has concluded that information regarding the reason for Violation C, the /

corrective actions taken ano those planned to correct and prevent its recurrence are

already adequately addressed in Enclosure 2. Therefore, you are not required to respond to' /

/f

this letter for Violation C unless the description therein does not accurately reflect your

corrective actions or your position, in that case, or if you choose to provide additional

information, you should follow the instructions specified in the enclosed Notice,

in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this

letter, its enclosures, and your response will be placed in the NRC Public Document Room

(PDRh To the extent possible, your response should not include any personal privacy,

proprietary, or saf] guards information so that it can be placed in che PDR without

redaction.

9709090124 970904

PDR ADOCK 05000361

k!!,l!!!!h! , ,

,

_ _ . . .

.

.

Southern California Edison Co. 2-

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

I' n,b'

  • T[omas DJw(g

t4t "

y n, Director

l. ivision of Re tor Projects

,

Docket Nos.: 50 361

50 362

License Nos.: NPF 10

i NPF 15

.

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

!

50 361/97 17;50-362/97-17

cc w/ enclosures:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diogo, California 92101

Alan R. Watts, Esq.

Woodruff, Spradlin & Smart

701 S. Parker St. Suite 7000

Orange, California 92868-4720

Sherwin Harris, Resource Project Manager

Public Utilities Department

City of Riverside

3900 Main Street

Riverside, California 92522

R. W. Krieger, Vice President

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

.

.

Southern California Edison Co. 3-

Dr. Harvey Collins, Chief

Division of Drinking Water and

Environmental Management

California Department of Health Services

P.O. Box 942732

Sacramento, California 94234-7320

Terry Winter, Manager

Power Operations

l San Diego Gas & Electric Company

P.O. Box 1831

San Diego, California 92112

Mr. Steve Hsu

Radiological Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento, California 94234

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, California 92672

Mr. Truman Burns \Mr. Robert Kinoslan

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

l

_

.

.

Southern California Edison Co. 4-

E Mail report to T. Frye (TJF)

E Mail report to T. Hiltz (TGH) _

E Mail report to NRR Event Tricking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

E-Mail report to R. Correia (RPC) and F. Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

.

Regional Administrator Resident inspector

DRP Director DRS PSB

Branch Chief (DRP/F, WCFO) MIS System

Senior Project inspector (DRP/F, WCFO) RIV File

Branch Chief (DRP/TSS) M. Hammond (PAO, WCFO)

WCFO File

DOCUMENT NAME: R:\_SO23\SO717RP.}JAS

To receive copy of document, indicate in box: "C" * Copy without enclosures "E" a Copy with enclosures "N" = No copy

RIV: SRI:DRP/F <

C:DRP/F D:DRP. f

JASlpen M y DFKirthML TPGwynnff[(#

' ' ' '

08/d97 08/6/97 09/t//97 //

'l OFFIClAI L RECCl9D COPY

I

i

I

C'

.?

Southern California Edison Co. 4-

E Mail report to T. Frye (TJF)

E Mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

E Mail repori to Document Control Desk (DOCDESK)

E-Mail report tr R. Correia (RPC) and F. Talbot (FXT)

bec to DCD (IE01)

'

I

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB

Branch Chief (DRP/F, WCFO) MIS System

Senior Project inspector (DRP/F, WCFO) RIV File

Branch Chief (DRP/TSS) M. Hammond (PAO, WCFO)

WCFO File

DOCUMENT NAME: R:\_SO23\SO717RPNAS

To receive copy of document. Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

ISRl:DRP/F <

C:DRP/F l D:DRP , l

JASl9 tin g gf

' ' ' '

DFK%hML TPGwynn /u llO

08/f97 08/Q97 0$/G/97 /i

'/ OFFICitg RECC(RD CO)Y

i

_a