Text

.

n Y 1998~ R GIONA_03ERATING 3 AN ._

l REGIO \ II l

u

, 1 I

in accordance with the Office of Management and Budget. Circular No. A-11. the contents of this docwent are not publicly releasable. Requests for the docwent should be referred to the Director. Division of Resource and Adriinistration. Region II. USNRC. \

l 1

l l

9804150022 980402 e PDR ORG NOMA 7 PDR ~

~

-. J

i

- TABLE OF CONTENTS l INTRODUCTION '

PAGES PART A: PLANNED ACCOMPLISHMENTS BY PROGRAM AREA SECTION I: PLANNED ACCOMPLISHMENTS AND OUTPUT HEASURES LINKED TO THE NRC PERFORMANCE PLAN GOALS

1. Program Area: Reactor Licensing 1
2. Program Area: Reactor Inspection 4
3. Program Area: Reactor Performance Assessment 17
4. Prog.nm Area: Fuel Facilities Licensing & Inspection 21
5. Program Area: Nuclear Materials Users 40 Licensing & Inspection
6. Program Area: State Programs 56

.7 . Program Area: Reactor / Materials 58 i

Enforcement Actions

8. Program Area: Independent Performance Evaluations 65 SECTION II: SIGNIFICANT REGULATORY EFFECTIVENESS / EXCELLENCE INITIATIVES PART B: REGIONAL MANAGEMENT /0RGANIZATION ACTIVITIES 73 l

l l

I l  !

l l

l l

1

INTRODUCTION l

The Region II Operating Plan provides the major planned accomplishments of the Region for Fiscal Year 1998. It also Fiscal ' ear 2000. The plan reflects tiearovides projected resources through the guidance provided by the EDO in an l August 26. 1997 memorandum. The plan will be used to provide overall '

direction for Regional operations. It is structured to show a direct linkage to the goals and strat5gies described in the NRC Strategic Plan (NUREG-1614 j

Vol.1. September 1997) and FY1999 Performance Plan (Issued Septettber 1997). i The Operating Plan is divided into two major parts: Part A is divided into two sections.Section I lists the planned accomplishments with performance l

output measures and targets that will be conducted in the Region. They are {

organized first by Program Area. Within each Area, the planned I accomplishments are listed under each FY1999 Performance Plan Goal and Strategic Plan Strategy so that the reader and user can visualize a direct link to the goals and strategies.Section II lists the significant regulatory effectiveness / excellence initiatives that will be conducted by the Region.

Part B provides the Regional / Organization Activities planned by the Region.

u l

l In accordance with the Office of Management and Budget. Circular No. A-11. the i contents of this docunent are not publicly releasable. Requests for the  ;

docunent should be referred to the Director. Olvision of Resource and '

Adninistration. Region II. USNRC.

ii

l l

1 l

3Ar~ A l

PLANN ED ACC0k 3LIS- V EN~~S I

3Y 3ROGRAv AREA SECT::0N ::  !

a 3

-~

_ ANh.EJ ACCOV 3 _::S- V EN~~S A\ J

-~

3 0 . v EAS RES _::N(EJ ~~0 ~~- E h RC 3ER 0RVA\CE 3 A\ GOA_S l

l

REACTOR LICENSING PROGRAM A. Resources

.pgTg]itEdi^gj M # d 998h f a #s M Yl1999.M G3 $%$Yg000M

@f$c.

hggg PS'$(k) FTEt s_., . PS.$(k). FTE.;..e .PS 4 (,k,)3 .FTE ; .'-

1.d cens._i m'.d n we.

- h. 2 a.

-,4 5..' 0m.s 7

".um.--. .

- 5.'.1. .w . :,---o J' . 2,.a-b- .

(,;g ;:g. g,y g g73 a.cq .
,
.y 3 , . ,1:g .p;4 f.g Op.a. min,Mg Re_act,or erator.sf(11E2-) cw. w. :iic - N v m . M .. 4 #9 . o, m:.e - -

B. Goals / Planned Accomplishments / Output Heasures By Strategic Arena

1. Strategic Arena: Nuclear Reactor Safety GenifsFGdal@jPrhventiradiati6n ' bra r ~ted: deaths'br%.illnesiesIdUbat6'

-w ws+,.-a Jci'v.11 dan + nuclear.re'act6hs0(GoalLI.)a.@7 '-64

%p.??W

~.I

-w , ,,; - = - - - -

- m - ~.-..,w. - ..

Perfor,mance,,:, Goals:nwig -_ = d., .

g:%.u .u n n-yy?@m !., e;M-:.y;ni;ppi-q@

.e.with&& . *ih% :. . :ks. ' 'AfigFTW9.Wrh

' '.. 7. :.+%. ~ ti c '~

    • --Zefo'.wivil'ian*

-.; w . .<;

. aa _ ~ a. .~~ nuclear ~ - . ~ - s, reactoruccidents-(Goal'I . ..~. ,

l 4

  • i Haintalinblowifrequency. ofeev' entt%hich "could>. lead /toLa rsbvereEccident

'. ::(Goal 1. A.1)~ . -'c'"* r:'. "2

.. 4' '~ " - -^ -

' .':4 ;. l @. @.* sy : .w

. s o n .-2!..' * -

^C2ero

' nuclear deaths'due

~ react :to'.radiationi ori radioactivit _ ' ~~~"'~-~~""~ '

o ~ rs^(Godl'I. A)-'~"~ ~~~ y, releases from civilian

..-.. m n ;.: ,. . , . , -
  • Zero significant radiation exposures due to civilian nuclear reactors u(Goal I .B.1);.. , ,.

Strategy,NRS.1.1 - -

Assure that licensees discharge their primary

~.0.t ~- 3

., 3."s wa.:4.nresponsibility:!for;;

. . . ;.c e- .3 -. w .conducting .. safe . operations .

Substrategy',NRS l'T.'3- '.'RegGleMy assess ~.jobjectivbly measure. 7andsreportvon

. e,SEF;.M.-J. , Q 'J.'U-licensees.'. jer.formance. Muse this tinformation -to .

".s-.I.C3 w.c.c  ;...~ identify-adverse safety; trends.and.to.. identify-early erformance.

individual Increase our plants with declining.p'o'n regulatory attention th6s'elic6n's'eis

.a with marginal performance, including halting .

w. - m e . ^

. operations'if performance-falls 1below an acce3 table level, and distributing inspection resources aased on licensee performance. -

1

Planned Accomplishments:

NRS 1.1.3.1 Heet licensee demand for initial operator license examinations.

Measure: Percentage of requested examinatfons that are conducted. (Target: Conduct 90 percent of requested examinations) ,

2. Strategic Arena,: . Excellence ...

4The,-NRCQebOTator

innaspfM GendraVG6alf*"}0%11okithe,@Ltlon] program'.willibe:sfficf&ntilindIwilW9-rliils

>;g;ce." .;3Mcivi]ian : purposes.. . s,afej.V,i,Ui erformanceiGoal  ;.nuclea'r2

. . :(Go'al; . ; g.,mat .+ e

{VII) :.lfor,ii*Mj

. W E'w.yi:MMSt ?c?. F .i s.' .) : 'T '

1 Performance Goalshp.gdi@F2E?d222spufijydpr,d,

.:.c :. ,. ..; 1 5 y . 2 "" . fM%fiyIikT ~ 3'.YLE.69

. .1W~'E e I: 'liImplementitpejagencylsplan1for:fegulatory: ...' n. .' ,:

3 excellence t,' (Goal;VII)

.. . ;r.w: ~

  • MP t c c :7;:~. ..= ,n. . . c,.

.. .~ +-.

..r M $.iEQTuateraintdm$y'1ementineededflin en p76cTis~eitbWJ0 T*21999NP(G65 ?VIICBPF##W%eWr- tovements?.,for0fiO f'T WN'. ma36tp e

Stpat~'gy@'EX

& %w sWMW/e: W1?MSM We h Wil li nia ke.?regul a to ry;eMel l s6ceithiYc6rn' erst 6n'e .!

J:fokallfof our2 strategies and tacti'itissI&h9E9 v Substtategy@XW:faf1: siwe.;williproactively.exiniine.ourSprogramsAand,@ :c. :#

.ib t '- ..~ -

v g ,, + .; performance 'in order to timprove.the way we :do. our : .

,-m u- . .;, n ., .:,. work'through comprehensive, systematic. ' agency wide.

' xapproach.to: program assessment and improvement.

Planned Accomplishments:

EX 7.1.1.1 Conduct quarterly self-assessments of operator licensing performance on the basis of specific criteria with performance measures to ensure pro expectations for on site, on time, grams andmeet management on target.

Measure: Cappletion of self-assessment each quarter (Target: One per quarter)

Substt ategy EXS*1~2: owe:willM,mplement changes'.to-impi.ove:the effect ^%'~'~~'

  • 'A$pgiT/E'gjgggyp'rogram'iyenes's

.-*'m 1 and.'eff.i.ciency of;our.. regulatory : + ,3 s and our; management and support . activities'. <

Planned Accomplishments:

EX 7.1.2.1 Implement changes to internal processes on the basis of lessons FY1997.

learned and the results of self-assessments in f

l 2

e Measure: Number of changes /itpprovements implemented (Target: 2 process changes in FY98)

Substrategy EX'7.1.4: Provide training and development Ltoio0F3th~ff_to

. . , , . n, .w ena..ble us t

. . ._.m . . . , , . . . . ~ . ..organfiat'io.o acAieve exce]lence;.in,out_nal.;and =. x, . fiEdividesh p Planned Accomplishments:

EX 7.'1.4.1 Plan and implement. training in accordance with MC 1245 requirements, or operator, examiner standards. ._ .

Measure: Individual training requirements that meet all HC 1245 requirements or operator examiner.

standards. (Target: MC 1245 requirements met for refresher training in 90 percent of cases:

  • -required non-technical training complete in 90 percent of cases)

EX 7.1.4.2 Complete the FY 1998 training plan.

Measure: Cappletion of planned training activities for region-based license examiners. (Target:

90 percent cmpletion of training designated by the Regional training cmmittee.)

a 3

1 i

' REACTOR INSPECTION PROGRAM

~

A. Resources yErnridt'edlAEea$ l#6*EYl@98,g mis $$$fJe19993/CS J4/i[3;F,Y.52_000'@

w w- _nt A ~ ~m ,' &.

Reside hM .

PSt$(k)f :FTE . :.. - PS.$(kL. FTE.htej fSt$(K)'i ETE-9.n f"G.p;.uu

  • ~ ..

51 FU_.

EnspeCR Q (32A2)ume :g:::.pg W M' *r M" u'rdth g:o y 3.g.%;a nr.50 - -.& Wsj?' *:;.y

. ,1.,,w c.

G....y_50 jyk,2 a eJi:

WW ' 7i3' ' Z:Ju'

~

i' Me'giitdni5oili SVii% e.TeT' W --

(-12 *C7:1. ~

... - - - - - ~

W?.uck.?. .- m. v . ? 7*_. . ..:. . . .. , - - n .

+

&,,n,x.,-% M Q ,f.79 "*2 acp,. . . 2.4 cg c 2.4- .

Il @Esd 20iinhi u0$$5 .M've v 4ii. ' i@O W.U- .

TeWEa G ;; -

h,eh5 '4 H2bh ,.,.a%w Deve pme y.r2 6. . +.g:.s:. :+ . 1.: 5,.: ., ; Ow ..

. r v2.4 . .

. . -a .n -. e . s .. . ; . - -

B. Goals / Planned Accomplishments / Output Heasures By Strategic Arena

1. gtrategicArena: Nuclear Reactor Safety  ;

General : Goal:: Prevent radiation related deaths or illnesces due to

~c ivilian nuclear reactors Performance Goals:

)

.Zero civilian nuclear reactor accidents.

(Goal I.A) ~

, 7, ,. .

. ;Haintain-loirirobability.of e. vents lwhich' could. lead.tii.a:~ severe.

J accident C.(Goal iL A.1)'" ~ ' . , - .c < ' ' ' -

-r ? -

f. , . , . .; . . ,

'.iZero deaths due;t'o . radiation-or radioactivity releases from. civilian ~

. - : nuclear . reactors. -(Goal'.I.B). ' '

> - Zero significantsradiation exposures due -to civilian. nuclear ' reactors.

- (Goal 1.B.1) J -

~ '

~

1 Strategy lNRS.1.1:.~

~~

We williassure that' licensees discharge their- I

^

primary responsibility for conducting safe.  !

. operations. 4 1

4 Substrategy NRS 1.1.2: We will. communicate with licensees to facilitate a l clear understanding of existing and emerging  !

regulatory requirements, i

i 4

J

8 s Planned Accomplishments:

NRS 1.1.2.1 Conduct an NRC/ Utility workshop for Region II licensees to discuss current and emerging regulatory issues.

Measure: Cmpletion of NRC/ Utility Workshop (Target: One workshop cmpleted in FY 98)

NRS 1.1.2.2 Meet with site management during peri. odic visits and communicate existing and emerging regulatory requirements.

Measure: Number of management site visits (Target: Each site receives a visit by a senior manager once per year and by a DRP Branch Chief once per quarter)

Substrategy,NRS ;1';1:.~3:WWe will,regula~r-lyJas'sesscobjectively measure.Tand f ~l-

  • 7~.Cy^.'rchdt

'~ 6n111c'en' sees'iperformance. i We will use this

~

information .to_ identify adver.ie safety trends and to

'YN8$9.$@IN.v.didenti

,4.-

b;ih.5h,y3pWm:wperfor.fytearlysindiv'idual p S6-55Ed ett. erit!ioriibnithosi 1,1censees with'margi.nal:man

,7 . ,,.. c...r pla r.per.formance,Hricluding halting operations ife -

s;rf.ihe. :bdd.chdper,formanceifalls. bel.ow an acceptable leve.1, and, 7; t

'i-n'.Wie:Fhserpygdistr.ibu. ingi.r.,es,our.ces. based.on.-licensee .l. .

performance. -

Planned Accohplishments:

NRS 1.1.3.1 Maintain a plant issues matrix (PIM) for each plant in order to capture and to aid in the evaluation of objective plant inspection information.

Measure: Timeliness of PIM entries (Target: PIMs updated within two weeks after issuance of each inspection report for 90 percent of PIMs for each sal.P and PPR)

NRS 1.1.3.2 Conduct management meetings with poor performing plants to communicate NRC's concerns and to evaluate corrective actions. '

Measure: Nunber of managenent meetings (Target:

Bimonthly meetings at designated plants)

NRS 1.1.3.3 Review INP0 evaluation reports to verify that the assessment is consistent with NRC evaluation results and to identify i any unreported safety issues.  !

I Measure: Timeliness of review of INPO report (Target-Review of final report by SRI within 30 days of report issuance and by ORP Branch Chief within 90 days of report issuance for 90 percent of  :

reports issued) l 5 i

1 NRS 1.1.3.4 Monitor allegation receipt to identify early indications of declining performance.

Measure: Conduct detailed analysis of the number of allegations and their character for plants

- indicating anomalies in allegation received.

(Target: Twice per year)

NRSi171'4 eiwi maksDicedse~ et ~

S SubstrhtegilM

" y1. @e.T.

r. W@'%@,[(@with<o))u;rJrdqu'iPem

.e $ E',theinspEctich,frequencyifor.:conseq'ueiitial!by.d cresinb good performei's'and .-E SiD.'$$yM.Y?9fhhTjass'essini.peilsltiisit6 pooFperfoFmers9"' ? </ fJ Planned Accomplishments:

NRS 1.1.4.1 Allocate the regional initiative inspection resources following PPRs and sal.Ps so that the combined inspection effort reflects the performance for each site. ,

Measure: Complete regional initiative inspections as listed in last two PPR letters (Target:

60 percent of planned initiative inspections) }

NRS 1.1.4.2 - Support headquarters inspections for poor performing plants and generic issues, and respond to significant events in other regions. i

  • Measure: Number of requests for inspection support outside Region II (Target: 80 percent of \

requests supported) '

NRS 1.1.4.3 Identify and take enforcement against licensee's who fail to comply with regulatory requirements in accordance with NUREG-1600 and the Enforcement Manual.

Measure: Conduct enforcement panels to coordinate potential escalated enforcement. (Target: As needed on a weekly basis with appropriate panel ,

material provided to participants 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in j advance) '

Measure: Timeliness of Non-exempt escalated enforcement (Target: Process 90 percent of cases within the timeliness goals established in Section 5.6 of the Enforcement Manual with all non-exempt cases  :

1ssued within 90 days, except those case types l with a goal of 105 days) '

Measure: Review 01 investigative findings for appropriate enforcement action. (Target: Review 01 report within 45 days of 01 Report issuance for potentfal enforcement) 6

Measure: Issue Confirmatory Action Letters as needed to confirm licensee comitments regarding emergent safety issues. (Target: CALs issued within two days of receiving cwmitments from licensees 90 percent af the time)

Measure: Review non-escalated enforcement for consistency  :

and compliance. (Target: Participation in 1 Peer Review and completion of 1 audit of a  ;

, representative satiple of inspection reports)

NRC 1.1.4.4 Implement the "N+1" resident inspector policy.  ;

Measure: Nurber.of resident inspectors assigned (Target:

All sites staffed to N+1. with exc?ption of those sites with approved exemptions) c Subs

. - , y-~trategy?NRSt171.'6MWeTwill y

, n 7 p.r~do help ~ensur thatfins @'e't licensees.'lloperat' licensees ions identify ~and resolve - and Te 1

Y 6 ahi^h*h  ?- ' ~

Planned Accomplishments:

NRS 1.1.6.1 Complete the core inspection program at each facility.

,^ Measure: Percentage of plants where core inspection procedures are cortpleted. (Target: All core inspection procedures cortpleted for all SALP cycles that ended during the 'Y) i NRS 1.1.6.2 Complete baseline inspections at all sites for the l maintenance rule.

Measure: Number of sites where baseline inspections for ,

the maintenance rule are completed. (Target: '

All Region 11 sites by end of 1998)

NRS 1.1.6.3 Conduct restart inspections at Crystal River as defined by the restart matrix included in the Manual Chapter 0350 minutes.  !

Measure: Cmplete MC 0350 restart matrix for Crystal River. (Target: Cmplete prior to authority given to restart plant)

NRS 1.1.6.5 Conduct regional initiative inspections based u)on the results of the plant performance reviews and SA.P board meeting conclusions.

Measure: Planned initiative inspection hours at each facility (Target: Total inspection hours at the Region 11 facilities comensurate with conclusions from board) 7

l l

l l

NRS 1.1.6.6 An augmented inspection team (AIT) will be sent to investigate each event as determined by agreement between AEOD. NRR. and Region II.

Measure: Nunber of AITs conducted (Target: AITs 1 -- conducted in accordance with criteria specified i

in M0 B.3) i NRS 1.1.6.7 Maintain on site coverage by qualified inspectors at each

! operating commercial nuclear site's normal working hours. power reactor site during the Measure: Number of instances where there is more than one consecutive normal workday in which there is no covera Zero) ge by a qualified inspector (Target:

NRS 1.1.6.8 Expeditiously determine the safety significance and validity

of allegations received.

Measures: Prortptly assess and acknowledge allegations received. (Target: 90 percent of all cases will be reviewed by the Allegation Review Board and acknowledged within 30 days of receipt, and 18 months for allegations involving wrongdoing)

Measure: Timely closure of allegations. (Target:

n Closure of all assigned cliegations, not Involving wrongdoing or discrimination, within 180 days of receipt)

NRS 1.1.6.9 Assess events both at the site and from the regional office l to ensure safety issues are identified and addressed early. l Measure: Timeliness of reviews of licensee event reports (Target: 90 percent of LERs reviewed within 90 days of report issuance)

NRS 1.1.6.10 Identify and address generic significance. plant-specific safety issues that have Measure: Nunber of proposed information notices and potenttal generic issues forwarded to NRR (Target: Five proposed information notices or Task Interface Agreements in FY98)

NRS 1.1.6.11 Document the results of the inspections conducted.

Measure: Timeliness of issuance of inspection reports (Target: Reports issued within 30 da of inspection in 90 percent of cases,ys of45 and end days for team inspections) l 8

NRS 1.1.6.12 Implement temporary instruction inspections.

Measure: Percentage of temporary' instructions cornpleted within established schedules. (Target: 90 percent) 4 NRS 1.1.6.13 Support 01 investigations.

Measure: \

Percentage of support requests conducted. \

. (Target: Provide requested technical suppcrt to \

0180 percent of the time).

NRS 1.1.6 '14 Control and monitor employee's radiation dose and im controls for use of radioactive materials by staff. plement Measure: Inplementation of MO 10.131. (Target:

Implementation af ROI 2130. Radiation Protection \

. Manual and ROI 2132. Region 11 Personnel l Monitoring Program)

NRS 1.1.6.15 Ensure that supervisors accompany inspectors on a periodic basis.

Measure: Number of inspection accmpaniments. (Target:

Branch Chiefs will accompany an inspector quarterly and each inspector each fiscal year and will accmpany new inspectors more n frequently)

Substrategy NRS 1.1.8: We will. maintain and exercise an. incident,. response capability to. ensure that licensees and the NRC are-  ;

prepared to respond to radiological emergencies.

Planned Accomplishments:

NRS 1.1.8.1 Sup) ort each incident response exercise by providing tecinical managers and staff personnel qualified to function in the incident response center.

Measure: Nunber of exercises performed (Target: four exercises per year)

NRS 1.1.8.2 Respond to incidents with qualified individuals to assess radiological emergencies and provide accurate assessments to response managers.

Measure: Membership and training qualifications of al]

reactor safety team and protective measures team. (Target: cmpletion of semi-annual training)

NRS 1.1.8.3 Maintain sufficient number of qualified individuals for emergency response in the Region.

9 l 1

( .

Measure: Number of personnel designated for each position.

(Target: Maintain depth of t.'aree people in each position)

NRS 1.1.8.4 Review changes to licensee's Emergency Plan.

\

Heasure: Quality and timeliness of all Emergency Plan changes. (Target: 80 percent of licensee's Emergency Plans reviewed within 60 days of receipt) l l

I 1

il l

10

. I

2. Strategic Arena: Common Defense and Security and International Involvement General TGoal:nraPrevent the. loss'.or theft 'of'special < nuclear. materials -

r a: ng:W.4 2

regulated by;.the"NRC', :and support %U;S.4 national.. interests

. . .,c, Min the sa'fe use:ofanucle'ar. materials ~and. in.non-

.%.,vu.

- M_.'.i

. , * ,. i-h.t p.r. ol i fe. . rat.i o.n . y. (,

..m , . . .

. Goal .!IV).~ J

.~ .

% _L y ;.f ..:'* -

l} . . % - _.s.,..,..~-'%T-W;9'.;.;,,

-- ,- J. y Performanc.Te 'Gdal s m  :.;,;.

e ... ;* f y,,_)

3 .u. ..f ,, . v-y *. . . . . . . . . . _.' .: .. _ . . . : .2., .

re.: .-

o. m mi z w w rv:fitii*t QtL% k~ % ,w.ct;t= <.. ,d.WLHt.7%$f' WC.W . . +A  ; .y-4Provideildadership'tto?stren .

r Y:'wo'r.ldsideSy(Godl .pIV.B)W. '

gtheninuclearisafety

.' !:F i'.- c" - A w ' ."ar:c randi Yafeguards.

-G.. ' '. . . _.

0TN.F WAC42F# @ternatio$

.635upport41n  %! GRI8

@ ?':

naTprogramsiand:/?E research:

%G4-f tha'tthav:ed:e&&6%?U.

> nef.icisl . :'t

.mMimpactPon'inJcl e'arfreactor4 and inuel sa r :materi al s' sa'fet9; y!(G651 .I V. C )?

Strategy'4v1:-We will-provide-leadership ,to-strengthen nuclear-safety.w c .'rRLM-and: safeguards-worldwide.- 4 - Ji?"; W.mm.w. .

Substrategyr4riv4:i..... We.willesu) port-international-programs,and research

~ r.wracepcq.t;".a .mthat t have oenef.i ci al simpacts on s nucl ea F; reactor.:and

.-* 4Ms.a.fr6Wsh;nucleartmater.1als safetyl-7.r*'- -

Planned Accomplishments:

COSII 4.1.4.;1. Provide assistance to international regulatory organizations.

Measure: Percentage of requests for support (Target:

Support provided for 80 percent of requests) 11

3. Strategic Arena: Protecting the Environment General Goal: .., , Protect,the. environment.;in connection with._civ.i.l_ian..use of .

.-:sg 2csource, . byproduct.pand.specialanuelear mater.ials:through e

-shi;W.%ithe . implementation of:th.e' Atomic Energy:Act 'and"theU ' -

~

f. JA.

Policy, Acti,a(Goal.' V). 'm:

.. 4 u.: p.dr.?r National.iEnvironmentap, y;; :;ff.f+g---pr,;tr. .i_n.. .:.l.. .['ag;: p Performanc;e ; Goals:c_:..J - 9. 1.:; ., a . -u ' w .s ' ' a x.

c. . .

.,w . . . .n;b:

. :. M L  :;

releases fro.. c-w &y%...n%. r.r,w~ .gwy '-:...v.:n: 'j:

m.m.x L ' 1

,as

  • .Wc;m; . s.,

Zerotoffs'ite,:m .x .

v ,2.- s m: rp. = . - .

operating (faciliti. J, ,c.es:of radioac.t'ive cy_...w:.

igmater,dnment idli.that n':c haveit.het po.tenti alato.sca usega dve.cse ei mpa ction ,t he a

. ?.1stivir  !(Goal 2.V. A)?:_.Q W. tN W.R-EE;t:Te

. ::+ 4Q5 M  ;;@.9.M:h.Mm.M?&;ijndy(96 .s.:-= QWYO:;;;:. fun $1  :.' i.-T: . 1
  • ? @ W.!N6l11ncRe  %-ri.ofiof fsi te c rsl ea ses i from' operati ng @.E C J' i a sef.i n3the inumbe l EM i:f acij l i ti est ofdra di ca ctiye,.materfaltthat; exceed .;10 :CFR -Pa rt {

~ ~-"(Goa1 TA?l) F ~ '- -~ ~~~-~'" *-~'"***320 hl.:imi" "ts-2 : 4 Strategy;PEi5!2:E T: We will..assureithatilicense~esl.protectithe?,t .::..-!

= --

.= -environment?during' operations'.

M 9'~A Subst r.st.egy(REiSi2~<2 :W.We : wil l F.i nspectctokensure :that /.l i censeesii deliti fyp

--~ 9 4g.; -"-s x - ;and

.mitigateipotentialfadverse-impactsion'.'the.'.h h environment 7from theirfoperation's as7 equi' red *by'the j

.w.:.a ~an .* . ?. .

NRC. - -

l 1

l Planned Accomplishments:

I PE 5.2.2.1 Monitor the licensee's onsite activities to ensure potential adverse impacts on the environment Measure: Percentage of core inspections in environmental  ;

procedures. (Target: Core inspection procedures completed for all SALP cycles that end during the FY in accordance with inspection manual chapter for power reactors) 12

4. Strategic Arena: Public Confidence Gen ~er~si Gobl: ~ The:public -those we:r' gulate.

e and other stakeholders in the national and international community . will have clear.

.:.i.w.:.ma . :.. .5 o and. accurate inf

, a . - ., < n arespect.for ,a,nd..ormation confjdenceabout..a. meaningful <program.

in. .NRC'ssregulatory role;in.;and,-

...'7 r- *

. . .:4l  %. y...x b.::7 .n,.., . -

.J

. ...-...e ~.-

Performa$*NA" M' N't 55 nce

%rWi 7. ,Q :-(GodliVI)> . ?.. , ,95 W '~~."

f . ;. gu ....a ;

. . m s a. -c n ...; . 4 O

gg;yp.51%i'T.3;*.,ikitk%t p g y p p p :G;,..M:,D .3M&Ws

[..- g .); 9..- g Nj); . ~;7l::-"'g'.~. %

w.rsn m .mAgency.s n.. :p]yg wwan;,topimprove how-it ,16 forms a

. . ~ .

e.?gg>wyUmpl ement' the

, : um . . .= -

.c" *-?rr:: Minvolves7the public.;those'We ~ regulate, and-other;st'akeholde'rs'f

'in:NRCs 7 reg 0latdry/prbgrahil,.J(Goal .'VI. AL. . 4DG5 6'F- C Strategy *PC'6'T.'i*f.3

..j. wav#.y3shre #Welwill?

enablin obj@ectivelf demonstrate'that tfs.nationtousenuclear' mater.ials NRC'.s

. :- .. .:': ' ' "isafety.

6 .

Substrategi.!PC-661Y2i2.WtWeWil.Umeasureta.nd' report the: performance of both W M 2irM M s M 4 4. W ANRC and;1ts?,1.icenseessand share this:per.formance' -

N'<m t4 @".E m D.. . A. . 2.% -'Dm information!.ini'a fair 9and focused ~

way with ?.'. t -

.:5 r. interested .stakeholders. ' - ' ~

Planned Accomplishments:

a PC 6.1.2.1 Promptly disseminate clear and accurate information regarding nuclear reactor events.

Measure: Type of Preliminary Notifications and press {

releases issued (Target: Issue PNs in '

accordance with criteria spectfled in NRC Inspectton Manual Chapter 1120)

Measure: Timeliness of issuing PN (Target: within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from event report)

PC 6.1.2.2 Conduct periodic press conferences in location where there is anticipated interest.

Measure: Number of conferences. (Target: Quarterly) 13

(

I l

l PC 6.1.2.3 Conduct public exit meetings for significant inspections. l Measure: Percentage of public exit meetings conducted for each AIT or significant inspection. (Target:

80 percent)

PC 6.1.2.4 Conduct periodic meetings with local officials to share performance information.

)

i Measuce:

Timeliness of meetings. '(Target: New SRIs meet with local officials within 90 days of assi nt and offer followup meetings each i 180 s) l PC 6.1.2.5 Respond to inquiries from the public.

Measure: Timeliness and quality of response (Target:

. Respond within 30 days of receipt)

PC 6.1.2.6 Provide notice of meetings held with licensees.

Measure: Timeliness and type of notice. (Target:

Notices issued in accordance with Mana l Directive on meetings with licensees) gement PC 6.1.2.7 Disseminate information to public on significant actions, a Measure: Timeliness and quality of press releases.

(Target: Press releases issued within two days i of issuance of civil penalty or order) l (Target: Press releases issued for each open pre-decisional enforcement conference) l l

l l

14 i

I .

5. Strategic Arena: Excellence General; Goal:eaThe NRC regulatory < program <will-be< efficient'and will -

m?mw.c. 0.~._ R allow the; Nation-tofsafelyz use'. nuclear! materials ~for'h !

m ; m _pa;.4.9 civilian purposes .'f(Goal'VII)T

  • " r

~ *wout ?. ' n:- " :. : m : r:=.= . :.,7 -

PerfdN.ia ri05 'G6'il 'sF'"~~ ~"' ~

" ~ ~ ~ ~ ~ ~ ~ ~ " ~

~

. .::muY.ict.Wrc. t*

. > ',PIri1plement the agency's plan .for regulatory excdllence.

"@,:%"el'5.y. 7(GoalgjIIj A)x ) @gf.gnfis !gg g:::;.;.f.e .r;- N.I . . . . pin 24

>. rd Je;:.:.+MrEvalu'ateiand .im lilien$nkdeddm rovements fori -

five major.NRC

Mprocesses by.du y?1.L.1999n--:(Goa . VII:B).

s 1

Strategy;EX

1. "; < 2 ; ~. 7.:1.:,J;;g'xWe.will,.make'.

jM. ~.t'. !;.for 'al.1.of our2_ regulatory. excellence the cornerstone ;..

. strategies andia'ctivities. "

Substrategy:EX.7..11:'. We.will proactivsly examine our programs and rove the.way'we:do.our....

Np,ig.b. ..qfu.....

. : -: g.R9 :.. . ,wo

- r@:

performance t hrolighM:6ripYe.incorder h'e'ns We .- -to imp'ys'yst'smatic. f age'nc i

~ :". :1. -

r napproach:to' program' assessment and improvement.

Planned Accomplishments:

EX 7.1.1.1 Conduct quarterly self-assessments of performance on the a basis of specific criteria with performance measures to ensure programs meet management expectations for on site, on time, and on target.

Measure: Canpletion of self-assessment. (Target: One per quarter) l l

EX 7.1.1.2 . Conduct periodic reviews of the quality of inspection reports.

l Measure: Number of inspection reports reviewed for quality (Target: Each site will receive a peer review at least once per year) l l

EX 7.1.1.3 Conduct inspector objectivity visits in accordance with l MC 0102.

i Measure: Nwnber of objectivity visits by each resident l inspector (Target: 90 percent of the residents will spend at least one week per year at another site)

EX 7.1.1.4 Observe National Nuclear Accreditation Board meetings and INP0 accreditation team visits.

Measure: Number of Board meetings and team visits observed. (Target: One regional manager will 15

l l

l observe a board meeting each year and observe l

team visit every two years) 4 Substrategy,;.7aj.:.y. .We.will-provid training-and:develo ment to our?

staff to enable us to achieve excel ence tin our -

organizational and individual performance.

Planned Accomplishments:

NRS 7.1.4.1 Train and qualify inspectors in accordance with MC 1245.

Measure: Percentage of qualifled inspectors with requirements maintained current (Target:

95 percent)

Measure: Percentage of sites with at least one. resident inspector who has attended course P-111. "PRA

  • Technology and Regulatory Perspectives (Target:

100 percent.by end of CY98)

NRS 7.1.4.2

'. - Provide training to managers in accordance with NRC program

.and Region II supervisory addendum.

Measure: Individual training requirements in procedures met. (Target: Requirements met in 90 percent of cases within 24 months of assignment as supervisor)

NRS 7.1.4.3 Conduct periodic training for resident inspectors to clarify expectations and provide refresher training.

Measure: Number of resident meetings (Target: two meetings in FY98)

NRS 7.1.4.4 Conduct rotational assignments to the Chairman's and E00's l office, i l

Measure: Number of rotational assignments to the Chairman's and ED0's office (Target: one per year)

NRS 7.1.4.5 Develop and maintain a pool of highly qualified reactor inspections from which resident inspectors can be drawn.

. Measure: Average length of program participation for those candidates who attain program certification. (Target: 12 months for internal candidates.18 months for outside candidates) 1

{

16

REACTOR PERFORMANCE ASSESSMENT PROGRAM A. Resources Ta;rje g g ea g s ,-o,J5FY.2199Ei h Md1F.Y.i.1999.dni f2AEW200.0.M.?

IMS4gdN.Sh

~

PS 5.(k) F.TE' '." ~PS $(k)- FTE PS _s(k): ETE SAQ%$$2nW -

' ' 4 :2 * ?.' .. .

. 4.2 -

4:2 -

ITerisYd 4.52' < ~4. 6 4.5 ,

b, ' =mw -

Ov:e;rsiDit,wAudE.P.erfor.niah@cg$.Ms

~

v. a: ~ :'^

"'N 2e ' 2 *: 'e

^

-A =i- -' '

B. Goals / Planned Accomplishments / Output Heasures By Strategic Arena

1. Strategic Arena: Nuclear Reactor Safety General Goal:.D y.4 Pre.venttradiation related deaths or illnesses due to
  • civilian nuclear reacto'rs..:.(Goal::1)
a. . :7.

- 7:% - ..

, ,: .a . . . . .

Per'forniance~ Goals:#<.cc '6.b w.f. AN 7l:hW;+- - h-

'v " '

. . y m .7. .i. . i  :-+-~,z. % r.: v ". *

..Zero civilian. nuclear. reactor. accidentsr-(Goal I. A) .

. Zero qeaths due to.radia' tion.orkradioactivity releases.from 41vilian?-

nuclear reactors. (Goal.I.B)

.. . i

>- 'kaintain. low. frequency of events.which could lead to a severe accident.- (Goal. I.A.1)

Zero significant radiation exposures due to civilian nuclear reactors.

.(Goal . I .B .1) - - .Y'- .: . -

Strategy NRS_1.1:. .. We.will, assure.that licensees discharge their W . g , ,. , " - ' f- .

' pri. mar.y.responsib,.1,1jty.for condotting safe

. operations. c. -. .

Substrategy NRS 1.'1.3: We .will4esularly assess.: objectively measure; and -

report on licensees'ipe'r'formance'."'We will-use this l # J .2 -

information to-identify adverse safety trends and to

-identify.eatly Mndividual plants with declining

'performancei: We'willcincrease our regulatory

~.: w:. -

.e

' ' . attention.on..thoseilicensees with marginal a'

' performance, ' including halting operations if

performance.fal.ls,below an acceptable level..and distributing resources-based on licensee performance.

17 i

Planned Accomplishments:

NRS 1.1.3.1 Conduct a SALP board for each operating facility on about a 18-month schedule.

Measure: Timeliness of SALP's conducted and reports issued (Target: All SALP cycles in accordance with MD 8.6 requirements and 90 percent of the reports issued within 60. days of the end of the (

period) -

NRS 1.1.3.2 ~

Conduct Plantreactors.

all operating Performance Reviews on a semiannual basis for '

Measure: Timeliness of Plant Performance Reviews conducted and letters issued (Target: PPRs conducted for all plants on a semiannual basis: i PPR letters issued to licensees within 30 days  !

of PPR completion for 90 percent of cases)

NRS 1.1.3.3 ' Provide input into the Senior Management Meeting prior to each meeting. l Measure: Completion of input into SI+1 process (Tar'get.

Sl+1 input provided for all sites to be discussed)

NRS 1.1.3.4 n Conduct SALP observations in other Regions.

Measure: Percentage of scheduled SALP observations that are conducted. (Target: Canplete in accordance with guidance fran Program Office ea Board Member to observe one per ye;ar)ch SALP l

NRS 1.1.3.5 1 Provide assessment Management information for Commission and Senior site visits.

l Measure: Timeliness of information to visitors. (Target:

Information provided five working days before visit u 90 percent of cases)

NRS 1.1.3.6 Hold msetings with licensees to discuss performance during SALP period.

Measure: Licensee self-assessment meetings and bi-monthly '

meetings to followup on identified problems.

(Target: One self-assessment meeting with each licensee during SALP period: bi-monthly meetings with each licensee identified by RA as needing specific fo1lowup on performance.

i 18 l

l

(  :

i l

I i

l Strategy NRS ~1.2:" '>cWe Williincrementally implement 4isk-informed? and. '

2.-- . a where a]pr.oprjate..per.formance based, regulatory. .

~ . .,.a:mA. c .s #n.+.approac les -for. power _ reactors. . -

s.=> N 4 4 n .

Substr'ategylNRS~1!2:1: :We/Will focds onl,those.regalated: activities .that -

J$y$N3m:lp?9.ifvMg2M Gk dpose ..the' great'est'..r.isk. to.,the.,publi c,::buil b bilistic.r.1sk: assessment

  • concepts:.a.ndidther?) ?
    1. $?

c:.5M,$3Phir.c4ff$ pro a 1ow iskT ni ng t hi gh!4 E1,: M&9cO.7 activities!kFfnM :a pproa ches f.forJldetermi EN'W?b Y Planned Accomplishments:

NRS 1.2.1.1 Senior Reactor Analysts will evaluate events reported in accordance with 10CFR50.72 and 50.73 to determine which of those events warrant additional . inspection effort.

1 Measure: Review 50.72 and 50.73 reports. (Target:

Reviews conducted within one kerk week) l NRS 1.2.1.2 Senior Reactor Analysts will evaluate enforcement actions to provide risk-informed assessments to the enforcement panels. I Measure: Risk assessment included in Enforcement Action Worksheets. Attendance at enforcement panels.

(Target: Ccmplete review and attendance of 90 percent) u Substrategy NRS 1.2.5: We 'will reflei:t a risk informed, performance based approach in our inspection, licensing, and performance' assessment process.

Planned Accomplishments:

NRS 1.2.5.1 Senior Reactor Analysts will provide a risk assessment in I each of the plant performance review inputs.

Measure: Quality of input and attendance at review meetings. (Target: Senior Reactor Analysts will attend 90 percent of SALP boards and PPRs \

to provide risk-informed insights and to gain performance insight fra the meetings) 1 19

I I

i

, 6. Strategic Arena: Public Confidence  ;

and other;stakeholders in General Goal: ~ ""~Tt ^

'. TheipubliciCthose hs'risti 6 n aPidd ~i jite rn a t'i 6n Jwe?

s regulate"i comriiunity 'will f ""a o

t

. ,' fhr'*",s'h

' ~~ J 7lf.J;r.ridfancurat~e;ihforniation?ab'

/ ut7a :me861 espect' for and:.tonfident'e"in,7NRC's?regulstorye ro ng'fdli'r6TeTiB

( -h&4W-bbt v % m y~ 4 ic & r D e ? '^ # ? :F G i: v 2 . q LT c&

Wm+ v;tu-'*nM.w#

V- - "r-  % grani.i

nike (.{n +al?VI)f =.? y I ph*t7 [c'eNa1 5 WI" E 'O I'iL 2' # Di ~~ C i aawy 9M@i!Mi3EGid$$A'WidI:.fiiGEM2fe.2f -h 1 l r. '

~ ..f" . 9mplement the. Agency's . plan 1,tolimprove.how it; informs and ~. ' . - I 9M;; involves.'the public;E.those. we regulate, andothdr'Ytikeh'oTders I

' ' f ~~ RinlNRC'stregulatory' program l ;(Goal .VI. A) ~ ' - "

l StrategyJC16.1 :,r.maWe:w111; objectively; demonstrate that NRC's: efforts

! ^-  :{ '! '.;.'

4 vare. enabling the: nation to use nuclear-materials

- ag,y.w y.g. ,-%. safety.'i h"*' 7'~D W ~;u: *v W

~

SubstrateggCf.12,:cp3We.will: measure _and:repor,tthe.performancer.ofythj-ynsbr#Mfir# chm NRCia infor.ndLits:.1.1.censees mat' ion in a fair and :a.nd shareithjs performanc. (

. ,; .H , -- x ..

focused way with. -

.c v. c. .& . .. .sg. #. e...6.interestedsstakeholders. '

.. ~

Planned Accomplishments:

PC 6.1.2.1 u Conduct aublic sal.P meetings with invited local officials to discuss 4RC oversight activities and to share performance infonnation.

Measure: Nunber of meetings conducted (Target:

80 percent of SALP reports issued each year)

PC 6.1.2.2 Provide notice of assessment meetings held with licensees.

Measure: Timeliness and type of notice. (Target:

notices issued in accordance with MD on meetings with licensees) l l

20

FUEL FACILITIES LICENSING AND INSPECTION PROGRAM A. Resources Ja Et'E~d?A[}i~ ~~4 tyzyfYR998?fM id&tM.219999-Q.' $ M.F2 20002ln' 2 IP aFsW...s .tTErn*m*eIPAFT.UED; f Pm"e?2..

. :Pl.fi(6.9 s 5I$$..75. .

uha ng ((.{Q ,y9][jj. yy,i . J,3y, 7~ N ((

QcensiQ%fR5Mr'QM -s w.<c . , . , .. .

. ., _.y .,' , .,

and3fnspection w c* *e' . - - '

B. Goals / Planned Accomplishments /0utput Heasures By Strategic Arena Strategic Arena:

1. Nuclear Materials Safety.

GeneralcGobi:WWPfe' vent. radiation related deaths ort-flinesses#due'to""

..a.q W %VM Jef$%; iateF1a' civil.ianhuse Ts".'1' ~ .of . source 4 byproduct.;and;special

'f'.' "

. nudlear .

'J-'"

+r;p.g&hy.QTqks -~ !(Goa'l!IIV'N."S.F.@L  %?&$ --

' ' .:^.-*e-

_ ,f ' .

.] . :-* ? ?.=

~+?.

>

  • t t%.

'f

.?gZer..r 0*'.

.hsk!bni

o. r.adiation related:

,.a .:

Mrr.=Li25. ..=

. .=: ~..;. c -

c-ht% < . . .+ death's.ifue.v

-to civilian'dse of. source.

i.'J..T3bypt. o ductMndispicial:nQclear(materials. (Goal II.A)

.ma

.. o

(....

,.._ .J'.? 4;.

., LNd yn .:.v:.a.v:.

incr,e. ,

,ase

. . . . .in

.ofthe significantnumber.7' radiation..;. exposures due

,Lto loss or use of source.; byproduct. and special nuclear materials. (Goal IIJA.1)L

. N.

  • .No. increase in the number of losses of licensed material as '

- re@rted 'to# Co' n gress annually? '(Goal'II.A.1.a) - -

. .u . d.. No.accdental ctitjcality*!. involving licensed material.

c.;. aux @p'(Go aD.,.II . A. ,. . 1.

o. :b) '"c' .r'..

e c' c.o r. c s..:..

. . .". . . . . . . . .. j e >..n t..

> " ' Noin..v'reas.

c . . the nu ..mber of m'isadministration events which er.in

  • Neause significant radiati;'no e'x~posures. (Goal II;A.2) -

Strate'gpl.NHS (2 FICWesill = assure. thatsli cens'eesidischarge thei r.. '. pnim' 'ari'~ :"

.-$}NdNN,Ndres'

> . s ..a . ,. . .- : pons'ib'ilitydorfus~ing'.

materials.safet 7-

.~f ' '

Substrategy.NHS 2.1.2- We will communicate with licensees to facilitate a

. -- a .. .

' l clear understanding of existing and emerging 3 '

e. 2.m uyow. iregulatory requirements.

21

1 1

Planned Accomplishments:

NHS 2.1.2.1 Conduct an NRC/ Utility workshop for Region II licensees to discuss current and emerging regulatory issues.

Measure: Completion of NRC/ Utility Workshop (Target: One workshop canpleted in FY98)

NMS 2.1.2.2 Meet with site management during periodic visits and  ;

communicate existing and emerging regulatory requirements.

Measure: Number of management site visits (Target: One site visit per year for each senior manager)

\

a c. c Substr,ategyMMSf2(1!3)h#etwi;11hregul.arlyimeasure(the ng : . J &F . performance exhibited by.' material. licensees.an

. ' ~ w;; s.Md. G6:shareithisainformation with2tliemswc Oh*

Flanned Accompli.shments:

NHS 2.1.3.1 Conduct periodic Licensee Performance Reviews (LPRs) for fuel facility licensees.

Measure: LPRs in accordance with IMC 2604. (Target: The LPRs will meet the quality standard of IMC 2604 1 will be conducted in accordance with the \

schedule in MC 2604 (annual for high enriched \

fac11ities and every two years for low enriched facilities), with LPR meetings with licensees held within 90 days of the end of the LPR perfod) i NMS 2.1.3.2 Provide input into the Senior Management Meeting once every j six months. '

Measure: Conpletton of input into SM1 process (Target:

Screening meeting and SM1 input in accordan:e with input requirements and schedules provided by date requested by WISS.)

Substrateby-NMS '.2,1.'4WWe'wilFirfa~ke Ti~ ensee"per c formance~and .complia' ndev

~

l

.ns-' withirbhuireiiientsPcon' sequent'i all byi decrea s i ng %the :

, inspection,frequ.ency for.. good compliers;andu;a .

assessing penalties for non compliers. i NMS 2.1.4.1 Maintain a plant issues matrix (PIM) for each fuel facility in order to capture and to aid in the evaluation of objective plant inspe-tion information.

l Measure: Timeliness of PIM entries (Target: All PlHs '

updated within two weeks of issuance of resident inspector reports for fuel facilities with 22

resident inspectors and monthly for other fuel facilities)

NMS 2.1.4.2 Adjust the Master Inspection Plan'(MIP) for fuel facility licensees based on the LPR results.

Measure: Timeliness of revision of MIP. (Target:

Development of revised MlP within 45 days of LPR meeting)

NMS 2.1.4.3 Identify and take enforcement against licensee's who fail to comply with regulatory requirements in accordance with NUREG-1600 and the Enforcement Manual.

Measu;e: Conduct enforcement panels to coordinate potential escalated enforcement. (Target: As needed on a weekly basis with appropriate panel

. material provided tc participants 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in ,

i advance) i I

Measure: Timeliness of Non-exempt escalated enforcement (Target: Process 90 percent of cases within the timeliness goals established in Section 5.6 of the Enforcement Manual with all non-exempt cases issued within 90 days, except those case types with a goal of 105 days. )

l u Measure: Review 01 investigative findings for appropriate enforcement action. (Target: Review Of report within 45 days of Of Report issuance for potenttal enforcwent)

Measure: Issue Confirmatory Action Letters as needed to confirm licensee cwmitments regarding emergent safety issues. (Target: CAls issued within two days of receiving corrmitments from licensees 90%

of the time.)

Measure: Review non-escalated enforcement for consistency and cortpliance. (Target: Participation in one Peer Review and completion of one audit of a \

representative satrple of inspection reports) i i

i Substrategy NHS'2.1.F

'We will'licen,s:e~ and inspect facilities 'and materials M

usersito' help"ensur.e .that they operate and .

decommission safely-and develop safe products. i NMS 2.1.5.1 Perform timely evaluation of events including on-site I inspections as needed to identify causes and root causes of events, risk precursors, evaluate licensee compensatory measures and corrective actions, determine if there are generic implications, document findings, review NRC processes, procedures and performance to determine if 23

actions are necessary to improve NRC performance and l develop recommendations.

Measure: Quality and timeliness of licensee event report reviews and NRC process evaluation. (Target:

  • Preliminary Notifications. Morning Reports. and Input to NEED system in accordance with the quality and timeliness requirements of IMCs and Directives. Responses will be cmmensurate'with

, the risk significance and site specific / generic implications of the event. Review 95 percent of licensee events reported to NRC within five working days. For events classified as A0s or other events of interest considered as A0s. a lessons learned evaluatton wi11 be performed)

NMS 2.1.5.2 Conduct Augmented Inspection Team (AIT) inspections to review each event that meets the thresholds established in MD 8.3.

Measure: AIT inspections conducted to review significant events. (Target: AITs conducted in accordance with MD 8.3 and IMC 0325 and 90 percent of AIT

' reports issued within 45 days of the end of the inspection)

NMS 2.1.5.3 Expeditiously determine the safety significance and validity n

of allegations received..

\

Measure: Prmptly assess and acknowledge allegations received. (Target: 90 percent of all cases will be reviewed by the Allegation Review Board and acknowledged within 30 days of receipt)

Measure: Timely closure of allegations. (Target:

Closure of all assigned allegations, not involving wrongdoing or discrimination, within 180 days of receipt)

Measure: Provide periodic status to allegers. (Target:

Issue status letters at 6 month intervals)

\

Measure: Maintain management focus on allegation l timeliness. (Target: Weekly meetings with )

senior Regional management focusing on allegations open greater than 90 days)

NHS 2.1.5.4 Support 01 investigations.

Measure: Timeliness in cmpleting investigations.  !

l (Target: Provide technical support to Of on the ,

\ schedule requested by 0180 percent of the time) i NMS 2.1.5.5 Schedule and complete fuel facility inspections in a timely manner to determine regulatory compliance and early ,

24 1

indications declining licensee performance and issue timely inspection reports.

Measure: Quality and timeliness of safety-related inspections. (Target: Completion of 90 percent

- of the safety-related inspections scheduled in the Master Inspectton Plan (MIP) on time in accordance with the appropriate procedures.

Completion of inspection reports in accordance

' with the quality standards and timeliness of MC 0610 (21 days for "nutine and 30 days for team) with less than u percent overdue)

NMS 2.1.5.6 Draft revisions to fuel facility security inspection 3rocedures in the areas of access controls and alarms and Jarriers and draft revision of MC 2681.

Measure: Quality and timeliness of revisions. (Target:

Drafts of revisions wi11 be in accordance with NMSS guidance and will be provided to NMSS by September 30. 1998)

NMS 2.1.6.7 Provide comments to NMSS on selected fuel facility license applications.

Measure: Quality and timeliness of coaments to WiSS.

(Target: Coments provided to WISS in 9 accordance with NMSS due dates 90 percent of the time)

NMS 2.1.5.8 Ensure that supervisors accompany inspectors on a periodic basis.

Measure: Number of inspection accanpaniments. (Target:

Branch Chiefs will accanpany each inspector each fiscal year and will accappany new inspectors more frequently)

NMS 2.1.5.9 Ensure that inspectors are adequately trained and fully qualified to perform inspections.

Measure: Timeliness of staff qualification and maintenance of staff qualification (Target:

Staff qualification 1246 (or IMC canpleted and maintained in accordanca with IMC 1245 for previously qualified staff). For staff in qualification, cappletion of courses in accordance with the Training Plan. 80 percent of staff will be qualified within two years of continuing qualification maintained.) ,

l t

25

i NMS 2.1.5.10 Identify safety issues that have generic significance.

Measure: Timeliness of draft Information Notices forwarded to Headquarters (Target: 60 days frorn identification)

- l RS 1.1.5.11 Sup$ ort each fuel facility incident response exerche or dri 1 by providing technical managers and staff personnel qualified to function in the incident response center.

- Measbre: Nurnber of exercises performed (Target: one

. . exercise per year)

NRS 2.1.5.12 Control and monitor employee's radiation dose and implement controls for use of radioactive materials by staff.

Measure: Implementation of MD 10.131. (Target:

- . Inplementation of ROI 2130. Radiat'uon Protection Manual and ROI 2132. Region 11 Personnel Monitoring Program) \

Strategyj.NMS 2.2,_: ; . We willeregulate uses _ consistent with .the ilevel oft.-

y .ty,g .a.r-M ? 7'Hr'i skM hvol ve'd:byl decFeasing ' oversight Lof .'those s *.

i

~ a-i . O.6.a bn..

. . materials that~ pose the70'west' radiolog'ic'al : risk .to '

. ce . .f 3:

v.

. . ;Wyp,pjt?'~t.helpubliciand.co'ntinuing emphasis:.on:higMrisk

' * ~ ' '- '

.acthfitie's2'F'"T.T TFtM

., i Substrategy NHS 2.2.2 We will assess our7 regulations and arocesses to

. :r identify those that- are now of can 3e risk-informed.

c.;n;c. ..performahce based 'or'ri' s k informed, less " 7 '

prescriptive.

Planned Accomplishments:

NMS 2.2.2.1 Support the revision of fuel facility and materials regulatory requirements, including the revision of 10 CFR Part 70. by reviewing and commenting on the draft proposed rule changes.

Measure: Quality and timeliness of review provided to hMSS. (Target: Cmments provided to NM3S in  !

accordance with requested schedule 80 percent of '

the time) l 1

26 '

1 l

l 2. Strategic Arena: Nuclear Waste Safety

\

General Goal: ),'.JEnsure tre'atment,. storage,- and disposal of wastes produced

,n

~ *

. by civilian use.of-nuclear material in ways that do not

' adversely..'a,ffect.t,h_is or'. future generations. (Goal.III)

Performance Goalj g n ,3..- g .... ,

. .. : e ~  ;. & n. ,~y, y g g ,

. .. ..;.:: -@Nd';sibn:.a , . :accidentah,rdle.:. . ; . .

~i.f.icant

~

e.-l!',7

.O..

' 4Y7stirage%nd a tr' nsport'6t'ioniofihi g hilases.of radioactive r fuel)..or loflevel waste? (Goal .III. A)evel . waste 1(inclu~ ding ' spent Stra1is6y:s'#No:'speci fi c 6st rategy 9 n ~ performsnce ' pl an. '- ~

l Planned Accomplishments:

NWS 1 I Schedule and complete ISFSI inspections in a timely manner l and issue timely inspection reports.

Measure: Quality an'd timeliness of inspection of ISFSI licensees and reports of inspections. (Target:

90 cwplete inspections in accordance with IMC 2681 with less than 10 percent overdue as defined in the IMC. Completion of inspection reports in accordance with the quality standards n and timeliness of MC 0610 (21 days for routine  ;

and 30 days for team) with less than 10 percent overdue)

NWS 2 Schedule and complete spent fuel transportation inspections, including route surveys. in a timely manner and issue timely f inspection reports.

Measure: Quality and timeliness of inspection licensees and reports of inspections. (Target: Comolete inspections in accordance with IMC 2681 with 1ess than 10 percent overdue as defined in the l IMC. Coqpletion of inspection reports in accordance with the quality standards and timeliness of MC 0610 (21 days for routine and 30 days for team) with less than 10 percent overdue)

NWS 3 Identify and take enforcement against licensee's who fail to comply with regulatory requirements in accordance with NUREG-1600 and the Enforcement Manual.

\ Measure: Conduct enforcement panels to coordinate i potential escalated enforcement. (Target: As needed on a weekly basis with appropriate panel material provided to participants 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in advance) 27

l Measure: Timeliness of Non-exemt escalated enforcement (Target: Process 90 percent of cases within the timeliness goals established in Section 5.6 of \

the Enforcement Manual with all non-exempt cases '

issued within 90 days, except those case types with a goal of 105 days.)

Measure: Review 01 investigative findings for appropriate enforcement action. (Target: Review 01 report

. within 45 days of 01 Re potenttal enforcement) port issuance for

' Measure: Issue Confirmatory Action Letters as needed to confirm licensee corrmitments regarding emergent safety issues. (Target: CALs issued within two days of receiving cortmitments from licensees 90 percent of the time.)

Measure: Review non-escalated enforcement for consistency and compliance. (Target: Partitipatton in one Peer Review and coqoletion of one audit of a representative samle of inspection reports)

Control and monitor employee's radiation dose and im NWS 4 controls for use of radioactive materials by staff. plement Measure: Implementation of MD 10.131. (Target:

n Implementation of ROI 2130. Radiation Protection Manual and ROI 2132. Region 11 Personnel Monitoring Program) 28

l l

l

3. Strategic Arena: Common Defense and Security and l j

International Involvement i Gener51' Goal: . ?;. Prevent the los's or.. theft of special nuclear materials

.: ,.J: regulated by the NRC7and . support U.S. national interests J .. s^. . ' ' . .. .in the safe use of.. nuclear. materials and in non-~

4 i

Q. . r.o. li.ferat. ion.' .(.G.o. al,.I. V_)

.. . - . . _. l Perfofmanc(a;oals':

G Q. . 'i MiLIR'

  • 23g sg . . yZe'ro

, A,+}G%'ss o

. n c.d.%%-lo ~y.7.qnu'd%.;~-i.'#4b.RP or? theft.of.specialinuclear n n

~ mater.ials regulated by the i e .

~ . t m .. . ~.' .

. v ' NRC'.,'.s(Goal'IV A)~ .

~.

, u. . v.s . ..:: . -, , ; , , .. .. . m .. w r:s.z .

re. = . .: ..

  • .O. .7"'Nois0bstantiikcase of.'attumpthd'. theft or~diversio'n.of aformula' '

.;f.i i.9.quantitie.s:of.. strategic's~pecial nuclear materials.

' ggjGdQQy.. A{1) y~ . .?d.,. g.g.- 71 .

. .. . r. . 3. ~ . ; .c y. . . . , .. ,,m . s s . . g .. q .. . -

  • -  : 1 .No.. substantiated breikdow,n/of '
3. i.'.:].,i.* coiltrobs(i.er'.accbss : containment, control. physical security or materia or accountability.

I

?.'-Q,h,,JGfisyst'eiris){thstEsignificintly weaken ~ed the protection.:against. .4 l

T. f.,MRp.m.'.theftlor diversion;of'. formula, quantities of strate ~gic special nucl eir mat' eYi sl ?2(Go'512IViA!2 ) .' : 'V'

  • i

Strategy'CDSII*472MF We Will"assdre that -licensees control, faccount forF'

~

i

. c ..m.;c..;-x O r.:..:and protect sucTeaiF rrist'eHils 'from being misplaced.

Substrategy.!CDSII 4:2.1 J 'We:willdnspectrand complete license reviews

e. , -

~

-,' ~

-to ensure licensees prevent the theft or diversion of nuclear materials.

Substrategy.CDSII:4.2.2 -

We will require that licensees be prepared to.

, w. . respond to threatening situations involving theft or . sabotage of nuclear materials.

Planned Accomplishments:

CDSII 4.2.1.1 Complete timely security plan change reviews and document the bases for decisions.

Measure: Quality and timeliness of reviews. (Target:

Coqolete reviews on minor plan changes in 1 90 days and major plan changes in 180 days 90 percent of the time) l l

CDSII 4.2.1.2 Schedule and complete security inspections of fuel facilities and ISFSIs in a timely manner and issue timely inspection reports. i Measure: Quality and timeliness of security inspections. l (Target: Completion of 90 percent af the fuel facility security inspections scheduled in the 29 1

Master inspection Plan (MIP) { including those in other regions when requested) and ISFSis in accordance with IMC 2690. on time in accordance with the appropriate procedures. Canpletion of insoection reports in accordance with the quality standards and timeliness of MC 0610 (21 days for routine and 30 days for team) with less than 10 percent overdue)

CDSII 4.2.1.3 Ensure that security inspectors and license reviewers are adeq0ately trained and fully-qualified to )erform and

. complete inspections and licensing caseworc actions.

Measure: Timeliness of staff qualification and maintenance of staff qualification. (Target:

Staff qualification completed and maintained in accordance with IMC 1246 (or IMC 1245 for

, previously qualified staff). For staff in qualification. canpletion of courses in accordance with the Training Plan. 80 percent of new staff will be qualified within two years of beginning assignment. Staff continuing

. . qualification maintained)

CDSII 4.2.1.'4 ' Perform timely evaluation of security events including on-site inspections as needed to identify causes and root causes of events, risk precursors, evaluate licensee a compensatory measures and corrective actions: determine if there are generic implications: document findings: review NRC processes, procedures and performance to determine if actions are necessary to improve NRC performance; and develop recomendations.

Measure: Quality and timeliness of licensee event report reviews. (Target: Preliminary Notifications, and Morning Reports in accordanc.e with the quality and timeliness requirements of IMCs and Directives. Responses will be conmensurate with the risk significance and site specific / generic implications of the event. Review 95 percent of licensee events reported to NRC within five working days. For events classified as A0s or other events of interest considered as A0s, a 1 lessons learned evaluation will be performed.) l CDSII 4.2.1.4 Conduct Augmented Inspection Team (AIT) inspections to review each event that meets the thresholds established in MD 8.3.

Measure: AIT inspections conducted to review significant events. (Target: AITs conducted in accordance with VD 8.3 and IMC 0325 and 90 percent of AIT reports issued within 45 days of the end of the inspection.)

30

COSII 4.2.1.5 Evaluate and respond to security allegations.

Measure: Quality and timeliness of allegat' ion reviews.

(Target: Conplete 80 percent of the allegation

  • reviews in accordance with and within the

. quality and timeliness requirements of MD B.8.)

CDSII 4.2.1.6 Support 01 investigations of security issues.

Measure: Timeliness in cm security issues. pleting investigations (Target: of Provide technical support to Of on the schedule requested by 01 80 percent of the time)

COSII 4.2.1.7 Schedule and complete spent fuel transportation inspections, l including route surveys. in a timely manner and issue timely inspection reports.

Measu're: Quality and timeliness of inspecticm and reports of inspections. (Target: & .lete inspections in accordance with IMC Si with less than 10 percent overdue as defineo in the IMC :oapletion of inspection reports in accordance with the quality standards and timeliness of MC 0610 (21 days for routine and \

30 days for team) with less than 10 percent overdue)

CDSII 4.2.1.S Coordinate threats against licensed facilities with the IAT.

Measure: Quality and timeliness of threat assessment and coordinatton with IAT. (Target: All threats assessed in accordance with IAT process and procedures)

COSII 4.2.1.9 Identify and take enforcement against licensee *s who fail to comply with regulatory requirements in accordance with NUREG-1600 and the Enforcement Manual.

Measure: Conduct enforcement panels to coordinate l potentfal escalated enforcement. (Target: As needed on a weekly basis with appropriate panel \

material provided to participants 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in advance)

Measure: Timeliness of Non-exenpt escalated enforcement i (Target: Process 90 percent of cases within the timeliness goals established in Sectir:: 5.6 of the Enforcement Manual with all non-exempt cases issued within 90 days, except those case types with a goal of 105 days.)

Measure: Review 01 investigative findings for appropriate enforcement action. (Target: Review Of report 31

}

within 45 days of 01 Report issuance for potenttal enforcement) \

Measure: Issue Confirmatory Action Letters as needed to confirm licensee comitments regarding emergent safety issues. (Target: CALs issued within two days of receiving cmmitments frorn licensees 90 percent of the time.)

Measure:' Review non-escalated enforcement for consistency and cmpliance. (Target: Participation in one

. Peer Review and cmpletton of one audit of a representative sanple of inspection reports)

4. Strategic Arena: Protecting the Environment i

jGeneral Goal:  : Protect the environment ~1n' connection with civilian use of i ..

' c source;ibyproduct..and.special nuclear materials:through mtw.. ,p;r hexiniplementation it ofdhe Atomic' Energy Act and the P.2% Nat'

  • . 44.itgi.?.:iCo.ioria'PEnilironmenl tile,+Pdlicy: Act.= :(Goal'.V

.:.W:at w :.m r:;w-qw n-. . .:

NWN'M" 4 - a

'PeYf8tiin?i'.GoiTsM*c.

_c,...,.,s..-

n ro ,offsite_

r- . w ;.

, leas. .rrcWMh.n.-F....@ -

.n Vb.

- c2 . " . . ' .

es y;

. fro.e . .- . - facilities. of. radioactive

. .u .

c ,r_.p.yke_.

, ;, .: . rre mcoperating l

c.wgMenvi t ?<.

ma S. ~ ter.iat-th~at ronment , , .

? 7;(G6al h' ve .the.poth'ntial.:to a

~

SV : impact.on cause adverse ~

A) QfCthe'l

. ' o. increase;in the. number <.of.offsite . releases from operatinga I

~. W' facilities of radioactive' material that exceed 1  !

. . . . limits.

. s .- .(Goal

. V. A.1). .

!> . Environmental . Imp' acts h' ave 'been. identified through NEPA process i j

l before regulatory action.is._taken. . (Goal V.B)

I l> "" acc}

.. ...No sites.will be released until satisfactorily remediated in ordance" with'.NRC ' release': criteria. (Goal. V.C)

Stretegy'PE 5.1'-We will improve-the process-by which licensees p -s m 2.; E

. t-m=.tvsw.:su'ccVsiif0lly?cWmplhte;; decommissioning.of non reactor sTt'es 9 3 2 N 2' W # W Planned Accomplishments:

PE 5.1.1 Schedule and complete decommissioning inspections in a timely manner and issue timely inspection reports.

Measure: Quality and timeliness of inspection of licensees undergoing decmmissioning and reports of inspections. (Target: Co7plete inspections in accordance with IMC 2605 with less than 10 percent overdue as defined in the IMC.

Co7pletion of inspection reports in accordance with the quality standards and timeliness of 32 1

MC 0610 (21 days for routine and 30 days for team) with less than 10 percent overdue}

PE 5.1.2 Maintain an adequate supply of operable and calibrated portable survey instruments to support independent surveys during inspections and to support incident response.

Measure: Number of operable and calibrated instruments.

(Target: The cmplement of instruments

. necessary for incident response will be maintained at all times. The supply of other instruments will be in accordance with the documented minimum inventory requirements 80 percent of the time.)

PE 5.1.3 Maintain capability to do screening analyses of samples for beta / gamma activity, low energy beta activity, and alpha

' activity. Coordinate with Region I other radiological analytical services. Develo equipment 0A/0C procedures. p and implement counting Measure: Operability of instruments and timeliness of transmittal of samples to Regfon I. (Target:

' Betalganma.10w energy beta, and alpha counting instrunents will be operable and calibrated or will be sent for repair within ten working days of identification of inoperability. Samples n will be sent to Region I within ten working days of receipt in Region.)

PE 5.1.4 Ensure that decomissioning inspectors and license reviewers are adequately trained and fully qualified to perform and complete inspections and licensing casework actions.

Measure: Timeliness of staff qualification and maintenance of staff qualification. (Target:

Staff qualification completed and maintained in accordance with IMC 1246 (or IMC 1245 for previously qualiffed staff). For staff in qualificatlon. completion of courses in accordance with the Training Plan. 80 percent of new staff will be qualified within two years of beginning assignment. Staff continuing qualification maintained)

PE 5.1.5 Control and monitor employee's radh tion dose and implement controls for use of radioactive mateiials by staff.

Measure: Inplementation of MD 10-131. (Target:

Implementation of ROI 2130, Radfation Protection Manual and ROI 2132. Region 11 Personnel Monitoring Program) 33

i Substrategy'PE 5.5.2 . We will inspect to ensure that licensees identify l *- "' '

and mitigate p'tential o adverse impacts on the

_ , f :+ , 0;f. f ronmenK7,[oggtheig operations as requir.ed by the l

P1anned Accomplishments:

PE 5.5.2.1 Schedule and complete fuel facility effluent control.

environmental monitoring and decommissioning inspections in a timely manner and issue timely inspection reports.

Measure: Quality and timeliness of effluent control and environmental monitoring inspections. (Target:

Completion of 90 percent of the effluent control ,

and environmental monitoring inspections scheduled in the Master Inspection Plan (MIP) on {

, time in accordance with the appropriate procedures. Canpletion of inspection reports in accordance with the quality standards and timeliness of MC 0610 (21 days for routine and 30 days for team) with less than 10 percent overdue)

PE 5.5.2.2 Ensure that inspectors are adequately trained and fully- f qualified to perform inspections and complete licensing {

casework actions.

F esure: Timeliness of staff qualification and maintenance of staff qualification. (Target:

Staff qualification comoleted and maintained in accordance with IMC 1246 (cn IMC 1245 for l previously qualified inspection staff and 1 Directives for licensing staff). For staff in qualification, completion of courses in accordance with the Training Plan. 80 percent of new staff will be qualified within two years of beginning assignment. Staff continuing-qualification maintained.)

PE 5.5.2.3 Perform timely evaluation of environmental events including on-site inspections to identify causes and root causes of events, ris( precursors evaluate licensee compensatory measures and corrective actions, determine if there are generic implications, document findings, review NRC processes, procedures and performance to determine if actions are necessary to improve NRC performance, and develop recommendations.

Measure: Quality and timeliness of licensee event reports l reviews. (Target: Preliminary Notifications.

Morning Reports, and input to NMED system in accordance with the quality and timeliness requirements of IMCs and Directives. Re:ponses l

will be cortmensurate with the risk significance 34 ,

1

[

I and site specific / generic implications of the

?

event. Review 95 percent of licensee events reported to NRC within five working days. For events classified as A0s or other events of interest considered as A0s, a lessons learned 1

1

  • evaluation will be performed.)

PE 5.5.2.4 Conduct Augmented Inspection Team (AIT) inspections to review MD 8,3. each event that meets the thresholds established in Measure: AIT inspections conducted to review significant events. (I?rget: AITs conducted in accordance with MD 8.3. IMC 0325 and 90 percent of AIT reports issued within 30 days of the end of the inspecticn) .

PE 5.5.2.5 Evaluate and respond to effluent control, environmental or decommissioning allegations.

Measure: Quality and timeliness of allegation reviews.

(Target: Complete 80 percent of the allegation reviews in accordance with and within the quality and timeliness requirements of MD B.8)

PE 5.5.2.6 Support 01 investigation of effluent control, environmental or decommissioning issues, u '

Measure: Timeliness in com effluent control,pleting investigations enviromental, or of decomisstoning issues. (Target: Provide }

technical support to Of on the schedule l requested by 0180 percent of the time)

PE 5.5.2.7 Identify and take enforcement against licensee *s who fail to comply with regulatory requirements in accordance with NUREG-1600 and the Enforcement Manual.

Measure: Conduct enforcement panels to coordinate potenttal escalated enforcement. (Target: As needed on a weekly basis with appropriate panel material provided to participants 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in advance)

Measure: Timeliness of Non-exempt escalated enforcement (Target: Process 90 percent of cases within the l timeliness goals established in Section 5.6 of 1 the Enforcement Manual with all non-exempt cases issued within 90 days. except those case types i with a goal of 105 days.)

Measure: Review 01 investigative findings for appropriate enforcement action. (Target: Review Of report within 45 days of 01 Report issuance for potenttal enforcement) 35

Measure: Issue Confirmatory Action Letters as needed to confirm licensee co7mitments regarding emergent safety issues. (Target: CAls issued within two days of receiving commitments fro 71 licensees 90 percent of the time. )

Measure: Review non-escalated enforcement for consistency and corrpliance. (Target: Participation in one Peer Review and co7pletion of one audit of a

, representative sample of inspection reports)

5. . Strategic Arena: Public Confidence GeneraT:Gdalf.W:lThe.publ.i~ c..'.those 'We'iregulate, and .otherJ stakeholders -in

,,..-...,.m the' natiorial

' . and 'interpational.. community. -will have iclear

.,l- L. -y d:and accurate'.informationiabout.ca meaningfurrolelin',Nand-h,Nhlhblb5r

. ? -

h$ ang; conf.i gy ngpis, r,egu1 atorygogram.< .: , ,

. . . : 'n:?-rzy . ;. :::m :*. :: .. .,.  ;

,n -,

.?.  ;> , - .

,... . . , .. g . .... -

Performancy Goal;g. .;n, ; g . g f.. g m j. g g g;.,f. ,. 7_ .j ,,.a . e l +f 7

+ w w.v . >. ~.w y iu .

L'",.49]-n:. ... a .,heagency.'s" plan'ito,.i.mprove how it informs and -

EQ,j.;.I.* Implement'tlD.invoWes;thegubljc *i,those.w f.."

iri'NRC's"regu atory'.progra F .(Goal-VI.A) . - .

Strategy PC 6.1: . , -

~

- We will ob3Ectively demonstrate that.NRC's. efforts

.. D =

are.enablin m:w.. .m n. . c . w gage 39, , .g..the:" n . nation to .use. nuclear materials Substrategy PC 6.1.2: We will. measure and report the performance of both NRC and its licensees and share this performance information .in a fair and focused way with

. - -m - -interested .stakeholders. -

Planned Accomplishments:

PC 6.1.2.1 Hold meetings open to the public with licensees to discuss the results of fuel facility LPRs or to discuss significant licensing issues, and hold open pre-decisional enforcement conferences.

Measure: Number of public meetings conducted (Target:

Meeting conducted for each LPR and for each pre-decisional enforcement conference that meets the criteria of the Enforcement Manual to be open)

PC 6.1.2.2 Disseminate information to public on significant actions.

Measure: Timeliness and quality of press releases.

(Target: Press releases issued within two days of issuance of civil penalty or order) 36 1

l (Target: Press releases issued for each open pre-decistonal enforcement conference) l PC 6.1.2.3 Conduct public stakeholder meetings for significant decommissioning activities.

Measure: Number and timeliness of meetings. (Tar Meetings held as spectffed in IMC 2605) get:

PC 6.1.2.4 Conduct periodic press conferences in location where there is anticipated interest.

Measure: Number of conferences. (Target: Quarterly)

PC 6.1.2.5 ' Conduct public exit meetings for significant inspections.

Measure: Percentage of public exit meetings conducted for each AIT or significant inspection. (Target:

80 percent)

PC 6.1.2.6 Conduct periodic meetings with local officials at sites where there is a Senior Resident Inspector (SRI) assigned to share performance information.

Measure: Timeliness of meetings. (Target: New SRIs meet with local officials within 90 days of ,

assignment and offer followup meetings each l 9 365 days)

PC 6.1.2.7 Respond to inquiries from the public.

Measure: Timeliness and quality of response (Target:

Respond within 45 days of receipt of a written request 80 percent of the time and prmptly (within two work days) to verbal requests 80 percent of the time)

PC 6.1.2.8 Provide notice of meetings held with licensees.

Measure: Timeliness and type of notice. (Target:

Notices issued in accordance with Mana Ofrective on meetings with licensees) gement 37

6. Strategic Arena: Excellence General Goal:., . Jhe NRC regulatory;p,rogram will be efficient and.will -
hilow the' Nation to. safely Juse . nuclear materials .for

, civilian;purposesff(Goal VII) . ~

....c. . . . . . .

.n...r.. .. . . . . c . -

Performance Goals:N 1 ,. .-22.7, ". ' f .' ,. .~

a": , ml_m .i.

., ,m 4 s.

o -- .

  • . .'. '_'d ' #-

m.wns% Go6. F,.V.II-!.A)": ;'";".

e w / dr'.' nm' ":&-mplement

.:. ..' > 'W#;' n.n :- the. ' ~ :-'agenc'yls

~y,n: * , u ' . . . '>

?

...;" .c .? :: :; .. .

.....- ~

i %*." . .

" Evaluate;tby70ulfil7
andi.im'pl'ement:nes' W E Sprocssses 1999?'!.(Gosl'.'VII;B):

P -

~ ' ded.*-improve Strategy EX 7.1:'- .

JWe will make regulatory excellence..the cornerstone Js#.cc J;w%"lcqfof-all'of 200f:stratsgies 'and activities? '?

~

l Substrategy.:EX 7.1.1:.. We.will.proa~ctively examine our.programssand ;_. -

1:i.atME:.M.hTppniciperformance~:inIorder:torimproveuthe way we:do-ourF t,- l l

- 5 % q.i :W' sEi.E ' s~ ;r.:.vg.iwor.ktthrou~gh

' ' komp~reh'ensivel systematic,. agency wide approach:toeprogram assessmentand'impro.vement.

Planned Accomplishments:

EX 7.1.1.1 Conduct quarterly self-assessments of performance on the a basis of specific criteria with performance measures to ensure programs meet management expectations for on site, on time, and on target. I Measure: Completion of self-assessment each quarter (Target: One per quarter)

EX 7.1.1.2 Conduct periodic reviews of the quality of inspection reports.

Measure: Nwber of inspection reports reviewed for quality (Target: Each site will receive a peer review reports twice a year)

EX 7.1.1.3 Conduct inspector objectivity visits in accordance with MC 0102.

Measure: Number of objectivity visits by each resident inspector (Target: The SRIs will spend at least one week per year at the other site) 38

Substrategy'7.1.4i, , .';;We will.: provide'.~ training .and development to our 1

- 'Jn w ' staff t :o enable ~ useto achieve excellence in our

~

. s organizational.and individual performance.

Planned Accomplishments:

EX 7.1.4.1 Provide training to managers in accordance with'NRC' program and Region II supervisory addendum.

- Measure: Individual training requirements in procedures met. (Target: Requirenents met in 90 percent of cases within 24 months of assignment as supervisor) "

- ' * " ~ ~ " -

~

EX 7.1.4.2 EnsUrethatinspec' tors"andl'icenserevie0ersareadeq0ately trained and fully qualified to perform licensing casework actions and inspections. -

Measure: Timeliness of staff qualification and maintenance of staff qualification. (Target:

Staff qualification ccinpleted and maintained in accordance with IMC 1246 (or IMC 1245 for previously qualified staff). For staff in qualification, completion of courses in accordance with the Training Plan. 80 percent of new staff will be qualified within two years  !

' of beginning assignment. Staff continuing qualification maintained. ) -

1 G

6 39

i I

NUCLEAR MATERIALS USERS LICENSING AND INSPECTION PROGRAM A. Resources Ta,'rgtedfA'rei'sYgM 5jiF,3,EQ1,998}TdW$;F(fl,999.M Tu[-MFXf20,0,054

[ N .PS $(k)', FTE .. . ;

PS.$(k) FTE.. ..... PS $(k)- FTE .

f{Qclitrgerdang 955.5 6 .i5555

~

I2.2. ' ' . ' ' . . +

S,a'ety f g M W w.tr n Y ecrai.S: c.).' 1:d.7 .

~

~

LTiffOn1NistM'3&if# 1 4 -# f 8 ""

.3

~

B. Goals / Planned Ac,complishments/ Output Heasures By Strategic Arena l l

1. Strategic Arena: ,

Nuclear Materials Safety j

~

i GenbraT-Go'al:Y4ff.lPF'eVeiit'. radiation r.dlated. deaths or.-illnesses due .to '

rdcivilianfuiei6fTsourcs,. by

-~O9/.N'Esg yy;f;nQ;N{m,apefji,a1p,.MGp,a]gI,I)M.;n..  ; product .and special _ '

.> .m m wusc wa.,;.ww..a . .-

l Performance :..G s,:gh.f 1: .

l

. ..u . p , n.r.gg.n.n;.; s y, l

w . .. . . . , .s .:... z . . . i i ' 7ero' nadiat'ibh related ' deaths'ddeM t o civilian use of source, I byproduct, .and speciaT nuclear materials. (Goal II.A)

No increase in the number of significant radiation exposures due to loss or use of source, byproduct, and special nuclear materials.

i l

(Goal II.A.1) l 1

No increase in the number. of losses of licensed material as reported to: Congress annually. (Goal II.A.1.a) -

  • JNo . accident 61;' criticality invol'ving , licensed material'. (Goal :II~.A.I.b)

. . l

  • _ No l increase 11n thi number'..of,.isadniinistration m events which cause significant: radiation exposures. -(Goal ~II.A.2)

Strategy NHS 2.1 We will' assure -that licensees discharge.their primary responsibility for using materials safety-Substrategy NHS 2.1.4 We will make licensee performance and compliance with requirements consequential by decreasing the inspection frequency for good compliers and assessing penalties to non. compliers.

40

Planned Accomplishments:

NMS 2.1.4.1 Review the performance of each materials licensee after each inspection and adjust inspection frequencies based on this performance.

Measure: Inspectton frequency revision (Target:

Inspection frequencies adjusted in accordance with criteria in IMC 2800)

NMS 2.1.4.2 Identify and take enforcement against licensees who fail to comply with regulatory requirements in accordance with NUREG-1600 and the Enforcement Manual.

i Measure: Conduct enforcement panels to coordinate potential escalated enforcement. (Target: As needed on a weekly basis with appropriate panel material provided to participants 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in advance)

Measure: Timeliness of Non-exempt escalated enforcement (Target: Process 90 percent of cases within the timeliness goals established in Section 5.6 of the Enforcement Manual with all non-exempt cases issued within 90 days. except those case types with a goal of 105 days.)

a Measure: Review 01 investigative findings for appropriate enforcement action. (Target: Review 01 report within 45 days of Of Re potential enforcement) port issuance for Measure: Issue Confirmatory Action Letters es needed to confirm licensee ca7mitments regarding emergent safety issues. (Target: CAls issued within two days of receiving cwmitments from licensees 90 percent of the time.) t l

Measure: Review non-escalated enforcement for consistency and cortpliance. (Target: Participation in one Peer Review and conpletion of one audit af a representative sarrple of inspection reports}

Substr.,ategy%NMSl2l1.5:

m. s .s.... . . . '

. We' will licen'se and .in'spect . facilities and material' i

~ ^' '. 6sers to.. help;. ens'ure .that'they" operate and ' l

! decominission '. safely and develop safe products.

{

l P1anned Accompiishments:

l 1

NHS 2.1.5.1 Complete materials licensing casework reviews. document the  !

bases for licensing decisions, consider enforcement history j on renewals, and maintain licensing files in orderly fashion and retain appropriate documents e.g.. license review r

checklists, and supporting data.

41

i Measure: Quality and timeliness of reviews of i applications for new materials licenses.

amendments, and renewals. (Target: Evaluate }

applications in accordance with established criteria (Standard Review Plans. Policy and Guidance Directives and Technical Assistance Request decisions). Conplete 80 percent of revfews for new applications and amendments within 90 days. Canplete 80 for renewals within 180 days. percent Eliminateofthe reviews i nwber of " backlogged" cases (as defined in U.S.

' Nuclear Regulatory Cwmission Accountability Report Fiscal Year 1996. NUREG 1542. Vol. 2) especially with respect to core cases.1.e., new and amendnents. We will eliminate all cases older than one year. For cases older than one <

year, we will develop and coordinate an action

, plan with WISS.)

NMS 2.1.5.2 Implement new materials licensing guidance as developed and finalized. ensuring consistency in licensing within and between regions and NMSS.

J Measure: Timeliness of implementation of new guidance and review of actions to assure consistency. -

(Target: New guidance inplemented within 45 days of receipt and review of all licensing n actions by supervisor) l NMS 2.1.5.3 Schedule and complete materials inspections in a timely  !

manner and issue timely inspection reports. '

Measure: Quality and timeliness of inspection of materials licensees and reports of inspections.

(Target: Complete inspecttons in accordance with JMC 2800 (materials) and 2605 (decorimissioning),1220 (reciprocity), with less than 10 percent overdue as defined in the IMC.

Cortpletion of inspection reports in accordance with the quality standards and timeliness of MC 0610 (21 days for routine and 30 days for, team) l with less than 10 percent overdue.)

NMS 2.1.5.4 Perform timely evaluation of events (including medical misadministrations) including on-site inspections as needed ,

to identify causes and root causes of events, risk I precursors. evaluate licensee compensatory measures and

, corrective actions, determine if there are generic l

implications, document findings, review NRC processes.

procedures and performance to determine if actions are necessary to improve NRC performance, and develop recommendations.

Measure: Quality and timeliness of licensee event report reviews and NRC process evaluati'.m. (Target:

42

i l

Preliminary Notifications. Horning Reports, and \

Input to HMED system in accordance with the quality and timeliness requirements of IMCs and Directives. Responses will be coamensurate with

{

the risk significance and site specific / generic implications of the event. Review 95 percent of licensee events reported to NRC within five working days. For events classified as A0s or other events of interest considered as A0s. a

, lessons learned evaluation will be performed.) ,

1 NHS 2.1.5.5 Conduct Augmented Inspection Team (AIT) inspections to

{

review each event that meets the thresholds established in MD 8.3.

Measure: AIT inspections conducted to review significant events. (Target: AITs conducted in accordance (

. with ho B.3 and IMC 0325 and 90 percent of AIT 1 reports issued within 30 days of the end of the inspection)

NMS 2.1.5.6 Expeditiously determine the safety significance and validity of allegations received.

Measure: Proqatly assess and acknowledge allegations <

received. (Target: 90 percent of all cases will 1 be reviewed by the Allegation Review Board and 9 acknowledged within 30 days of receipt)

Measure: Timely closure of allegations. (Tar Closure of all assigned allegations.get:

not involving wrongdoing or discrimination, within 180 days of receipt)

Measure: Provide periodic status to allegers. (Tar 1ssue status letters at 6 month intervals)get:

l Maintain management focus on allegatic, i timeliness. (Target: Weekly meetings with senior Regional management focusing on allegations open greater than 90 days)

NMS 2.1.5.7 Support 01 investigations.  :

Measure: Timeliness in completing investigations.

(Target: Provide technical support to 01 on the \

schedule requested by O! 80 percent of the time) \

NMS 2.1.5.8 Ensure that supervisors accompany inspectors on a periodic basis.

Measure: Number of inspection accompaniments. (Target:

Branch Chiefs will accompany each inspector per fiscal year, and new inspectors more frequently) 43

{

NMS 2.1.5.9 Ensure that inspectors and license reviewers are adequately trained and fully-qualified to perform inspections and complete licensing casework actions.

Measure: Timeliness of staff qualification and

- maintenance of staff qualification. (Target:

Staff qualification completed and maintained in accordance with IMC 1246 (or IMC 1245 for previously qualified inspection staff and the

' Directives for licensing staff). For staff in qualification, completion of courses in accordance with the Training Plan. 80 percent of new staff will be qualified within two years of beginning assigreent. Staff continuing qualificatton maintained.)

NMS 2.1.5.10 Perform Project Management for the U.S. Navy Master Materjals License (NHL).

Measure: Quality of oversight and timeliness of actions.

(Target: Im lement inspection and license review in accordance with IMC 2810 and Policy and Guidance Directives)

NMS 2.1.5.11 Identify safety issues that have generic significance.

Measure: Timeliness of draft Information Notices n forwarded to Headquarters (Target: 60 days from identificatton)

NMS 2.1.5.12 Support IMPEP review of another NRC Region for adequacy to ensure public health and safety and conformance with NRC policies and procedures.

Measure: Quality and number of IMPEPs supported.

(Target: Participation in one IMPEP using the criteria of MD 5.6.)

l NMS 2.1.5.13 Control and monitor employee's radiation dose and im controls for use of radioactive materials by staff. plement Measure: Implementation of MD 10.131. (Target:

l Im lementation of ROI 2130. Radiation Protection Manual and ROI 2132. Region 11 Personnel Monitoring Program)

Strategy NMS 2.2._We will regulate.uses. consistent with:the level .of risk:._,-

. " involved by "decreas'ing oversight of.those materials that- '

pose the lowest radiological risk to the public and

. .. continuing emphasis on_high risk activities.

l l

Substrategy NHS"2:2'.2~We will assess' our. regulations and processes ~to

.y .,~,. m:

.n w%, identify.those thatrare,now or.can ae.nisk . informed.

~ x-i. l performance: based or r.isk informed. -less e P. +- -

h prescriptive l' -

+ --

Planned Accomplishments:

NMS 2.2.2.1 Support the revision of materials regulatory requirements.

including the revision of 10 CFR Part 35. by reviewing and commenting on the draft proposed rule changes. . .

Heasure: Quality and timeliness of reviews. (Target:

Reviews comaleted/coaments provided in accordance with schedule established by NMSS 80 percent of the time.)

Substrategy NHS?2l2!3'.9We will tre' engineer.touri.311cen' sing p'rocsssss',; ; :.2' .

. .-E

.;. . . . O.r:pN. tailoring them .toYrsflect the relative. hazards of "'

M. Isis 3dridin.MQ:411 censed mater.ials.'r A. . 4 . .20: %sME6 J. T Planned Accomplishments:

NMS 2.2.3.1. Support the materials BPR Project implementatic.i. including the Guidance Consolidation Project, to support simplified and streamlined licensing processes.

\

Measure: Quality and timeliness of Consolidation \

products. (Target: Support provided to '

Consolidation teams in accordance with schedules developed by NMSS 80 percent of the time.)

l I

l l

45 l

2. Strategic Arena: Protecting the Environment General -Goal :t;.".g.m r 4 e " .=;nor.e, m .. .

.. ~+ ' . . .

.:y . . . ,

~ ~ " Protect'the-' environment 'in connd5tidn' With' civ'111an'6si~6f source, byproduct, and special nuclear. materials throughc.the implementation of

-> the Atomic Energy Act and the National Environmental . Policy:Act.

- Q N f, Goal hm y 55

.v. iG V)f # b W N 'i 1. .

' cern.' a : -

~# ~ 1. i' T.

.v 9 ,.b: L.

Perior.%,in;: mance- Goals:yg%W F.=S.;Hmmt!is.?? gMN.2pM.j pJ. -;r.& -g i g n1g

. ,a 4

. m .g '  : i -

.. . . - -M.-'

  • sg ~ Zerojoffsite . releases'.from. operating . facilities .of radioactive ..

- Mix mmater1a1.3t. ha,ts.haveithe p,o,t.en.tial 3 s

< f.@! .genv. iron,me.ntig(GoaTcV 'A)f.cd:. .- go cause adverse impa.ct.o,n the' t

y y. g q v -.. g ,n .7,. y __ ,

  • '. No . increase .in.the number.cof offsite releases from 035 rating

'r=.?W'4.

. . !.m e -n u Tim,it.'w, a r s9 -.(Go'aliV:

~

-- m. --

A. .1): 9

  • A i? *.UJ. T..iacilitiestof tradioa

.~.---+e+- +- e m : . . - . - - M!#-WEM

..-s- .

N.Nb -

hSInh ntbhifact'sIavkfN, I!hcientif ed.th~r.hu'g'h2NENk(p' rice '

.-"before

, . ,. v. .-regulatory

,, - action

. , . , - '.isitaken. .(Goal.' V.8)

.z; ncgr_w m c.

> Ti . c-NoisVt s'wil'1.'be '.rileasidiiintil sitisfactorily femediated;Jin- " '

m;.nicf.f :.ita~c'coFdance'with :NRC 'rele'a'seicr.iteria: (Goal 2V.CF -

Strategy PE.5.1HWe will improve thd process by which licensees -

~ ~---q .; :-- successfully complete decommissioning.of non reactor

s. si tes . - -

Planned Accomplishments: l PE 5.1.1 Complete reviews of ORNL terminated sites list facilities l I

and document the bases for decisions.

Measure: Quality and timeliness of reviews. (Target:

Complete reviews of all facilities on the list by 9/30/98 and for those not released define actions to be taken to release.)

PE 5.1.2 Schedule and complete decommissioning inspections in a timely manner and issue timely inspection reports.

46

Measure: Quality and timeliness of inspection of licensees undergoing decwmissioning and reports of inspections. (Target: Complete inspections in accordance with IMC 2605 with less than 10 percent overdue as defined in the IMC.

  • Completion of inspection reports in accordance with the quality standards and timeliness of MC 0610 (21 days for routine and 30 days fcr team) with less than 10 percent overdue.)

PE 5.1.3 Maintain an adequate supply of operable and calibrated portable survey instruments to support independent surveys during inspections and to support incident response. >

Measure: Number of operable and calibrated instruments.

(Target: The complement of instruments necessary for incident response will be maintained at all times. The supply of other instruments will be in accordance with the documented minimum inventory requirements 80 percent of the time.)

PE 5.1.4 . Maintain capability to do screening analyses.of samples for i beta /gama activity, low energy beta activity, and alpha activity. We will coordinate with Region I for other radiological analytical services. We will develop and implement counting equipment 0A/0C procedures.

n Measure: Operability of instranents and timeliness of transmittal of sarpples to Region I. (Target:

Betalgamna. Iow energy beta. and alpha counting instrunents will be operable and calibrated or l will be sent for repair within ten working days i of identification of inoperability. Samples I will be sent to Rcgion I within ten working days of receipt in Reglon.)

PE 5.1.5 Expeditiously determine the safety significance and validity of allegations received. .

Measure: Prmptly assess and acknowledge allegations received. (Target: 90 percent of all cases will be reviewed by the Allegation Review Board and acknowledged within 30 days of receipt)

Measure: Timely closure of allegations. (Target:

Closure of all assigned allegations. not involving wrongdoing or discrimination, within 180 days of receipt)

Measure: Provide periodic status to allegers. (Target:

1ssue status letters at 6 month intervals)

Maintain management focus on allegation timeliness. (Target: Weekly meetings with 47

I -

senior Regional management focusing on allegations open greater than 90 days)

PE 5.1.6 Ensure that decommissioning inspectors and license reviewers are adequately trained and fully-qualified to perform and

. complete inspections and licensing casework actions.

Measure: Timeliness of staff qualification and maintenance of staff qualification. (Target:

. Staff qualification cornpleted and maintained in accordance with IMC 1246 (or IMC 1245 for previously qualified staff). For staff in qualification. completion of courses in accordance with the Training Plan. 80 percent of new staff will be qualified within two years of beginning assignment. Staff continuing qualification maintained) 1 Substrat'egy PE[5'1.2*. ewe 7will . assure".that licensees.have . adequate... funds 2 .

_d

~ " "available 'for' decommissioning and maintaining -

. _ . ~ S. c. - .- . J .:: :.if.inancial ' requirements.

- J c.

Planned Accomplishments:

PE 5.1.2.1 Complete timely financial assurance reviews and document the q bases for decisions.

Measure: Quality and timeliness of reviews. (Target:

Initiate reviews within 30 days of receipt of financial assurance information and transmit RAls or acceptances to licensee.c within 30 days of receipt of contractor evaluations)

Strategy PE 5.2 We.will assure thatlicensees protect the. environment during operations.

Substrategy.PE 5.2.1 During-initial-licensing and any other major. NRC

. -.rarwc.5.v.- .4c: faction that could31gnificantly affect the quality

  1. ;:.:nrf.re.WenW:.df.the' environment,7we will consider the

.f.a2. w ... w.., + environmental effects and alternatives associated c;R. .y - - . r. withsuch" major:NRC actions.

Planned Accomplishments:

PE 5.2.1.1 Complete timely materials licensing casework reviews for cases that could have significant environmental impact.

document the bases for licensing decisions. and retain appropriate documents. e.g.. license review checklists, and supporting data.

Measure: Quality and timeliness of reviews of-48

applications. (Target: Evaluate applications in accordance with established criteria (IMC 2605. Standard Review Plan for Well Logging. Policy and Guidance Directive 84-20 NMSS Policy and Procedures Letter 1-48, and Teclinical Assistance Request decisions.)

Substrategy,PF~:i.522

.w .x.-: g <We~will', inspect.totensure that licensee ~s -identify..

acts on~ the ?.

GL?.;and Y mitigate YE f,Y.56tential "' adverse simp $'Y 3

?*b{h:h , .

Planneo Accomplishments:

PE 5.5.2.1 Complete inspections of materials licensees effluent control and environmental monitoring programs where applicable and issue, timely inspection reports.

Measure: Quality and timeliness of inspection of materials licensees and reports of- inspections.

(Target: Complete inspections in accordance with IMC 2800 (materials). 2605 (decmmissioning) 1220 (reciprocity), and 2690 (ISFSis) with less than 10 percent overdue as defined in the IMC. Completion of inspection reports in accordance with the quality standards

,a and timeliness of MC 0610 (21 days for routine and 30 days for team) with less than 10 percent overdue. )

PE 5.5.2.2 Ensure that inspectors and license reviewers are adequately trained and fully-qualified to perform inspections and complete licensing casework actions.

Measure: Timeliness of staff qualification and maintenance of staff oualification. (Target:

Staff qualification cortpleted and maintained in accordance with IMC 1246 (on IMC 1245 for previously qualified inspection staff and Directives for licensing staff). For staff in qualification, corrpletion of courses in accordance with the Training Plan. 80 percent of new staff will be qualified within two years of beginning assignrnent. Staff continuing qualification maintained.)

PE 5.5.2.3 Perform timely evaluation of environmental events including on-site inspections to identify causes and root causes of events: risc precursors: evaluate licensee compensatory measures and corrective actions: determine if there are generic implications: document findings: review NRC processes, procedures and performance to determine if actions are necessary to improve NRC performance: and develop recommendations.

49

Measure: Quality and timeliness of licensee event reports reviews. (Target: Preliminary Notifications.

Morning Reports. and Input to NMED system in accordance with the quality and timeliness requirements of IMCs and Directives. Responses will be cmmensurate with the risk significance and site spectfic/ generic implications of the event. Review 95 percent of licensee events reported to NRC within five working days. For

' events classified as A0s or other events of interest considered as A0s. a lessons learned

, evaluation will be performed.)

PE 5.5.2.4 Conduct Augmented Inspection Team (AIT) inspections to review each event that meets the thresholds established in MD 8.8.

Measure: AIT inspections conducted to review significant events. (Target: AITs conducted in accordance with M9 8.3 and IMC 0325 and 90 percent of AIT reports issued within 30 days of the end of the inspection.) {

\

PE 5.5.2.5 Support 01 investigation of effluent control, environmental (

or decommissioning issues.

Measure: Timeliness in ccm effluent control,pleting investigations envirornental. or of decmmissioning issues. (Target: Provide technical support to 01 on the schedule requested by 0180 percent of the time.)

PE 5.5.2.6 Expeditiously dearmine the safety significance and validity of allegations received.

Measure: Promptly assess and acknowledge allegations received. (Target: 90 percent of all cases will be reviewd by the Allegation Review Board and acknowledged within 30 days of receipt)

Measure: Timely closure of allegations. (Target:

Closure of all assigned allegations not involving wrongdoing or discrimination, within 180 days of receipt)

Measure: Provide periodic status to allegers. (Tar Issue status letters at 6 month intervals)get:

Maintain management focus on allegation timeliness. (Target: Weekly meetings with i senior Reglonal management focusing on allegations open greater than 90 days) 50

. I l

\

E 5.5.2.7 Identify and take enforcement against licensees who fail ts comply with regulatory requirements in accordance with j

NUREG-1600 and the Enforcement Manual.  ;

Measure: Conduct enforcement panels to coordinate potential escalated enforcement. (Target: As {

- i needed on a weekly basis with appropriate panel

' material provided to participants 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in advance) 1 1

MeasDre: Timeliness of Non-exempt escalated enforcement (Target: Process 90 percent of cases within the timeliness goals established in Section 5.6 of

. the Enforcement Manual with all non-exenpt cases i issued within 90 days, except those case types with a goal of 105 days.)

~

Measure: ' Review' Ol investigative findings for appropriate enforcement action. (Target: Review Of report within 45 days of Of Report issuance for potential enforcement) -

Measure: I'ss$le Nnfirmatory ction Letters as needeb to confirm licensee comitments regarding emergent safety issues. (Target: CALs issued within two days of receiving carmitments fra licensees 90 percent of the time.)

Measure: Review non-escalated enforcement for consistency and carp 11ance. (Target: Participatton in one Peer Review and completion of one audit of a representative sample of inspection reports) l l

1 51 I

3. Strategic Arena: Public Confidence Genera 1 Goal _:.

.U e .<x -

m-a' -

~

  • l ,1.Thkpublicf.thof>e"w'e regula't's,? arid other stakeholders' in the . national

.N' '! abo]utliaime'aningful'roletindand. resp'ect .for and confid 0; regulatory.fprogram. 4'.(Goal :VI) **~ It; fJ . . :

"I' ' - -

l pgph n ~

b5O i# ' $ 'T

?' - '

'd

n. W

. ..-.- .. . . . , .. .. ,,r,e. .f.. . a -.* ,f.fuD&an2T2mLUp' .:r:'

u. z. d. ;s.-l. ^:
  • W.g..%%..I

.Agenc.y

.. ..... -e r et . -. ..

tW;p'malement',thet.o. . te Tahd otieove3cwcit informs;anddnvolvescthe M.Wprogram:.th'oss,'we' hilign (G6al"VI'!A)"S':

W Br?.W' -

reg,u a;plantto;im,ar.

rstakeh'olders .in NRC'.s regulatory:

o '

w.e Strategy:PC'6'.1'AWP .?Wewillr objectively' demonstrate that NRC's ' efforts.

u.;.-c WPM-" NF .are e~niblingMthVnation to use nuclear materials o l yit,un:a:E4G r.Gsafety'.W? NT N- ~ ' ' --

1 SubstrategyePC;6m2:v.;We:will-smeasureyand; report .the: performance of:.both

" W."s.9m bcr.st;NRCiandhitsr.licenseesvandishare this. performance '-

2.51.79 n r0_. ..information..iri.a". fair;and focused.way with ' ,

l

.d.;F.eck,3 -iAg e-'11nterested stakeholders. -

-- ~

Planned Accomplishments:

PC 6.1.2.1 Disseminate information to public on significant actions, l Measure: Timeliness and quality of press releases. l (Target: Press releases issued within two days l of issuance of civil penalty or order)

(Target: Press releases issued for each open pre-decisional enforcement conference)

PC 6.1.2.2 Conduct public stakeholder meetings for significant decommissioning activities.

Measure: Number and timeliness of meetings. (Target:

Meetings held es spec 1fied in IMC 2605.)

PC 6.1.2.3 Conduct periodic press conferences in location where there l 1s anticipated interest.

Measure: Number of conferences. (Target: Quarterly)  !

1 1

PC 6.1.2.4 Conduct public exit meetings for significant inspections.

Measure: Percentage of public exit meetings conducted for each AIT. (Target: 80 percent)

PC 6.1.2.5 ,

Respond to inquiries from the public.

Measure: Timeliness and quality of response (Target:

Respond within 45 days of receipt of a written \

' request 80 percent of the time and prarptly (within two wrking days) to verbal requests

. 80 percent of the time)

PC 6.1.2.6 Provide notice of meetings held with licensees. {

~ ~

Measure: Timeliness and type of notice. (Target:

Notices issued in accordance with Mana

.- Directive on meetings with licensees) gement ,

l

.  ; ~~ . . .

. \\ ,

53 ,

4. Strategic Arena: Excellence j General Goal: . .:f*The NRC regulatory program will be efficient and will

" allow-the Nation to safely use nuclear mhterials..for

- . civilian, purposes. . .(Goal.VII).,

c Perforniance' Goals:

. s. .

t . .g, ., ;. , ...v...

,- {

mkdr theibg'encyfs $1a113or Dji4M.,:

... W e!t u te ?..%.c: r .n.y+iidn'ti:iA)4aMDMNM:P+'@ydg

. . .Goa$l4V x... m%.II

. 1.

t'-

~M4 W

~

= '2 - - - 1

-N-

. : : ::: M'.; * '. " *'

. 'b4 .: 5

. 1 ~ . . w. , . .n

. - . ; . . . > . - . . ~ - ,

e-br<:T~:'EValua~te.'and fim lement needed improvements for five:maj. .n c-or..NRC O

. l v ;:proce'sses:by:Ju y11l.1999. x(Goal VII.B). o,. -

c .1 . -

~

Strategy?EX.7.1:.K7 We:will make. regulat. cry excellence'.the. cornerstone v.an.wgW st@mfof "allr fo?6ur'stratigies and activitiet r ,

Substrategy.EX;7.1.1: We will.proactir ly examine our. programs.and .

em lM .

.ME.: ;'T

,_.. ".. & .,.- work through1 comprehensive, systematic.cagericy

. -q ~ .c appro'ach.to' program assessment and improvement; Planned Acco'mplishments:

EX 7.1.1.1 Conduct quarterly self-assessments of performance on the a basis of specific criteria with performance measures to ensure programs meet management expectations for on site, on time, and on target.

Measure: Completion of self-assessment each quarter (Target: One per quarter)

EX 7.1.1.2 Conduct periodic reviews of the quality of inspection reports. I Measure: Number of inspection reports reviewed for quality (Target: Peer review at least twice per i year) '

Substrategy 7.1.4: We will provide training and development to our I staff to enable us to achieve excellence in our organizational and -individual performance.

Planned Accomplishments:

EX 7.1.4.1 Provide training to managers in accordance with NRC program and Region II supervisory addendum.

Measure: Individual training requirements in procedures met. (Target: Requirements met in 90 percent 54 l

{

l of cases within 24 months of assignment as l supervisor) b EX 7.1.4.2 Ensure that inspectors and license reviewers are adequately trained and fully qualified to perform licensing casework actions and inspections.

Measure: Timeliness of staff qualification and maintenance of staff qualification. (Target:

' Staff qualification conpleted and maintained in ~,

accordance with IK 1246 (or IK 1245 for previously qualified staff). For staff in qualification cortpletion of courses in accordance with the Training Plan. 80 percent of new staff will be qualified within two years of beginning assignment. Staff continuing qualification maintained.)

0 l

l 55

STATE PROGRAMS A. Resources TarjethdjAr.ea.f(;[: S k;.:.JF,Yi1998:5 J' .

3 i,:% EY,.1999.~.-l. ' .( ;L ..gfG2000,s g, hk r Nx [RIl8{$ [FlEyM [h$$7 iFT[M ff.Q(d $,_E$$i S'ti'tMEEigEnisiLM $4 N.:.; 22!0 W 6 F ;' -

-/ 1 i 'VJ B.

Goals / Planned Accomplishments /0utput Measures By Strategic Arena

{

1. Strategic Arena: Nuclear Materials safety General Goal:-

Prevent 5 ridi~tioh a

related deaths or illnesses due'to l civilian.use of. source. byproduct. and special' nuclear

. materials. ~(Goal .II) _..

y. e: . - L  ;-

Performance' Goals: 1 ~ --

~

..c..

~._. ..

lZeroiradiation related deaths due to'. civilian use of source, 1,bypro. - ,,

duct,-and;special nuclear-materials. (Goal ~II.A) i No incre'as~e in the number of significant radiation exposu~ res due to loss or use ~ of source,~ byproduct, and special nuclear materials. )

1(Goalull A.1)-

No increase in the number of losses of licensed material as reported to Congress ' annually. (Goal II.A.1.a)

No accidental criticality involving licensed material. (Goal II.A.1.b)

No increase in.the number of misadministration events which cause

_ significant radiation exposures. (Goal II.A.2)

Strategy.2.3: .

'We will work.with the Agreement States to assure consistent ~

nationwide. protection of public health and safety Substrategy 2.3.1: We will provide for early and substantive .

involvement of.the Agreement States in rulemaking and regulatory processes, including the transition to risk-informed, performance based regulation or a I risk informed, less prescriptive approach.

Planned Accomplishments:

SP 2.3.1.1 Review Region II Agreement State regulation changes.  ;

i Measure: Quality and timeliness of reviews. (Target: \

l 56 i

I

Reviews will be completed in accordance with SP D.7 . Documentation of these reviews will be \

provided to OGC within 30 days 80 percent of the time.)  ;

SP 2.3.1.2 Review and comment on OSP draft documents and participate on task forces and in training courses. i Measure: . Quality and timeliness of reviews and 1 participation in task forces and traintag courses. (Target: Reviews will be c.cmpleted in accordance with schedules established by SP

~ 80 percent of the time.)

Substrategy M 2.3.2i.V.> ;Welsillir'eview the adequacy.-and compatibility ofc . :.

, M.NMINMi ~.-P Sg@.Tl@Weach; AgreementStatef;h'i s? Radiation]Contr j4."gijhthptre's0

  • p;;.:p3G-Mg:G.MMAgreement#StaYe'shM*-f r"NSF%%f@ :#

ei/ieWtbitfish i

Planned Accomplishments:

SP 2.3.2.1 Su

,angportIMPEPreviewsforadequacytoensurepublic Measure: Quality and number of IMPEPs supported'.

(Target: Participation in two IMPEPs using the

,)

criteria of MD 5.6.)  ;

i l

uestsefromr- m Substrategy. 2.3.3:wi)r

.< individual.Weiwil.1; states:that.continue express an: >to ; respond to. reci

., .~.,___;.-""puFsding 'AgribmenFStitb 'statd's' ahd V6rk 'wi th'4a ch~ l

. .._ x ,e.  !

m:N.- 7 ge ;.

r.-state =to achieve,this goah'.we'will aiso: encourage c.

.~retentiorir oY exist'in~g' greement: States' '
.. pi.eyme -:.thrdu~gh"nbri iibnstary i)ncentiv sf ..!. '. .T .primsr'ily Planned Accomplishments: 1

{

SP 2.3.3.1 Support the Agreement State assistance request in Region II and support any State desiring to become an Agreement State.

Measure: Timeliness and quality of support to Agreement States or States desiring to become Agreement States. (Target: Support provided in accordance with States' needed schedules 80 percent of the time.) '

SP 2.3.3.2 Conduct annual meetings with Agreement States not undergoing an IMPEP.

Measure: Quality and number of annual meetings. (Target:

Annual reviews completed in accordance with SP Procedure D.24 for each State not receiving an IMPEP in FY98.)

57 I

1 J

REACTOR / MATERIALS ENFORCEMENT ACTIONS PROGRAM A. Resources g? N _ i M t M r y g ,y  ? $ f$ 199,8 5' M 3%QEY.g9992.&gasy$J5FJj2000S,$y.

RNyfoS8g,5 fili.s3 .L';.G .l2.0 ... .,j .i .3.0 . . e. , .

3.0.

5% M N$$ pp 'st.n. v. )w3; .vr.r#e . - -

11.. s.:-. . v B. Goals / Planned Accomplishments / Output Heasures by Strategic Arena
1. Strategic Arena: Nuclear Reactor Safety e

Gene ~rilYGoalM$pfg[c]vy1an/n6c]earyactysj.Q-i(Goal ,. . @7.Yi[K. I)F.Pfeve'n

.%& =__ - .

$5.i/'O$.

Performance >GoalsT - -*-

'~ ~ - - m J ~~

_.r .y .~ ~~.- - . -.~ - ~ ~ . - ~

p ..

. -: -.+.g. :.:... c3.,.. . nT.'.'. -e a*'.L t . . - -

6Hi*"t-W.4 W.,;h 5. C Qc'-Ei

~ .. - .4 r .:-

. . , k .Ji . -

  • Ei w.,Ma.

i

.%. u %

~ 9 i en. tai.9WW.M.s.M.w n . .?..  %< w.n W+=.Wy,(.MZerorc

...~....c..

2

= n . ".w . ' '

>4.c'W . n N o. w'1.. 'requency of .- ~ ,..everits which;c.oula' lead to a: severe e .* Maccidentr.M' :A.

ap(Goil'I A.1)ta+p ..f g..~ . . . -

3 w ;:.yum . .g-+-

r m y.

n . . ' = ~ . -r q...

> 9..- ""

.Ze.re. udisths

- . ,d. de':to . rad. . iation':or;ra.ioactivity

... d releases.from civilian nuclear reactorsf-c(Goal'I.B)" M ~ ' -

  • ...-.a.-.....--..~-..-....-.-~--~m.--

Zero .signif.icant: radiation exposures . dub to. civilian riuclear'. reactors.

(Goal L B. H :. ., - -

% ~ -~ .n * .' : .

Stra' t~egy~'. HRS .1.0:'.WsJwill?as'sure:.thatRicensees: discharge their : primary M.rbsponsibility..for.1:" conducting.' safe operations. - -

Substrat_egy NRS3.1.4: E We will. make~. licensee performance'and.~com'pl'iance' '

with.our requirements consequential.-by decreasing

";.d.. :: .I..ge!"wNth6'-inspection'frbquency'for good ,

. . i performers and - '

n J ~.idc.uwp+verasses~ sing penalties to poortperformers. - -

Planned Accomplishments:

NRS 1.1.4.1' Identify and take enforcement against licensees who fail to comply with regulatory requirements in accordance with NUREG-1600 and the Enforcement Manual.

Measures: A. Conduct enforcement panels to evaluate and coordinate potential escalated enforcement. (Target: As needed on a weekly basis with appropriate panel material provided to participants 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 58

in advance. )

B. Timeliness of non-exempt escalated enforcement will be conducted in accordance with the timelirass goals specifled in the Enforcement Manual.

' (Target: On average. 90 percent of cases will be issued within 90 days of inspection canpletion. and on average.

100 percent within 120 days.)

' C. Monitor DOL actions for potential enforcement. (Target: Issue Chilling Effect Letters within 30 days of receipt i of a DOL District Director's decision of

~

discrimination).

0. Review OI investigative findings for appropriate enforcement action. (Target:

Review 01 report within 45 days of 01 Report issuance for potential enforcement).

E. Issue Confirmatory Actica Letters as needed to confirm . licensee carmitments regarding emergent safcty issues. (Target:

as needed) . . . . . ..

{

F. Review non-escalated enforcement for \

consistency timeliniss. and caqqliance.  !

(Target: Partit'pation in 2 Peer Revfews and carpletion of 1 audit of a n representative sanple of reactor inspectfon reports).

G. Timeliness of non-escalated enforcement (Target: 90 percent of cases within the report issuance timeliness goals of MC 0610) 59

l 2. Strategic Arena: Nuclear Materials Safety General ' Goal:g'C}iciviliari:' Prevent ' radiation.related and special nuclear deaths or

' 4 .;;b~^ ~ Q Use of..sourcerbyproduct, I

c c.m. .w; .

. T ;;.

mater.ials. '(Goal :II) -

Performanc... - ,.. .. d,. 3 ,, . , . -

.s 4 .

i e Go<alsi.

w ~. ..j,:l;; + .. ,:-

. . . . ;. .e ,. , f. .

. .,nr. .. ,

un.

  • ifZero.c;;., . .< . - w . . . . : , , w,;.;.. '

-: a+

=

Aradiationy :due.to civilian iseiof;sourcicfkt:E ~..,

Mb

-4%yprodo'etn.u

, ,.x p a

a.>. s.p,ec'i nd;r. elated': deaths.

..n .,+alet.nuc.~l esr!,!ma.te ri al s'c6 (Goa

..w l :II . A) ?.@, - L.;.J.

v . . - *% .

  • g.-~ 3 A T :.it *Mj$. %+the.3:

' J s.* ' :... . t 4"$%

- T.. -

  • A'e. ~'

. d .7Noiincrease n. . number. 'of ?signifi. cant radiation ex

'..t ...;.

's .

~e tto . '

l 1

N' W;1o's'

(

. n . Goal:IIsB) toh useTof.tsotfree',

' ' -^ '" 72

^* ' s

.byp*roduct,tande pecial

. mater.ials.. nuclear,posures V*' '

t. .u.%.r.c w g&:e--Jx a <..m%%wn w@k:n' . - a.

l c 4h'sM - - - ' E 1 'i. .

0;.;;Nofincreasedn .the n%id rA~ r"7**'sumber.;ofilosses.of. licensed material:.as;

- '?'to:Cor)g'resUannually'!C:(Goal:II.C) -

1

. & 9:' y .M&& " & * * ~ ^ ' .

'^ '

  • :No l . a'he accide'ntaLcr.iticalityl,

.m..n.ue~ru;m. ~. involving n..~~rylic.ensed. material.c -(Goal:II D) -

. _ g-N ovm W. v.

. ,, .: , .n. ..

<SeY.- 3 incr. ease No.im yi rzw.r%n . ro 5yhe,.numbe.n.y+f;misad' ministration events use J.c . which .ca sTg~rii fi ca rithradi ati on" expos tyre' s".O (Goal ..I I . E ) ' t 2 C '* V" '

l I

i Stratepy"NMSi2lli#We'.V/ill ' ass'ur~e thlit91ceitse'es discharge their primary l

t.m:Piesponsi'

.s bility for using materials safety.

Substrategy

"" NHS 2c-1.4: We will makeilicensee performance and compliance s  !

..~. m with our requirements consequential by decreasing

.the-inspection frequency for good performers and  !

assessing penalties to poor performers, l P1anned Accompiishments:

l NMS 2.1.4.1 Identify and take enforcement against licensee's who fail to comply with regulatory requirements in accordance with 1 NUREG-1600 and the Enforcement Manual.

l Measures: A. Conduct enforcement panels to coordinate potential escalated enforcement. (Target:

As needed on a weekly basis with appropriate panel material provided to participants 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in advance.)

B. Timeliness of non-exempt escalated l

\ enforcement will be conducted in accordance with the timeliness goals specified in the Enforcement Manual.

(Target: On average. 90 percent of cases will be issued within 90 days of inspection completion, and. On average.

100 percent within 120 days.)

60

C. Review 01 investigative findings for appropriate enforcement action. (Target; Review Of repnrt within 45 days of 01 Report issuantc for potential enforcement).

E. Issue Confirmatory Action Letters as needed to confirm licensee corrmitments regarding emergent safety issues. (Target:

As needed) .

' F. Review non-escalated enforcement for consistency, timeliness, and compliance.

(Target: Participation in 1. Peer Review and cortpletion of 1 audit of a representative sanple of materials inspection reports). . .

G. Timeliness of non-escalated enforcement actions (Target: 90 percent of cases

. within re MC 0610.) port issuance timeliness goals of O

l l

1 l

1 61

l l

l

3. Strategic Arena: Public Confidence General Goal: '..".~.~.The;publjc. those ke: regulate, and other.stakeholders in i

"."J andthe: national:and.'.

if international community, will have clear

-. (.....

.j)'//. '.l.i ,~.7, resp. ect accurate '. n ormation about, a meaningful program. . role .in, a l . -.

4

.for and confidence.in, NRC's regulatory

- :':,7: u.anyh.-Q(Goal ek. 'VI. T:.:-~ '. :m"x' '"; .; _ -

PerfoMMcb7 Goali g q u @ [. [ ~ [ .:,ik.: }

~3~ e ---

,.i '*""W Ga i.d 9 s/ plan-to '.Y ' '. .'

1 -T.:i W' :n.

y*f Mi$iement.1he;[Agen:cy'E.L..+ "3m2

. arove how it informssan.d; involves the

?p6Mcdth' ole we. regulate, and.ot

.< iprogramM.s(G6akVIIA) Wi"".'.f ;.1er: stakehol -

' " ders .in~K

NRC's'. reg ~ulatory 1

Stratdgy PC:6.'liPWe;will2objectivelf: demonstrate that NRC!s efforts are-

> rum.ta .a.'/"3TenablingMhe;n'at' ion"to use nuclear materials : safety; -

i Substra.t.egy.PC.y:6.1.

,,,, 2: .. .We.will measure and report the performance.of-both' .

7 -NRC'and .its; licensees and. share this'cperforma'nce -

. ' . : r . ,. . . ~ se._ :

information in~;a.' fair.~and focused way with-

r. .

- ~

l

- interested stakeholders. ": ' -

Planned Accomplishments: I PC 6.1.2.1 Disseminate information to public on significant actions.

n Measure: Timeliness and quality of press releases.

(Target: Press releases issued within two days of issuance of civil penalty or order)

(Target: Press releases issued for each open pre-decisional enforcement conference) 1 i

l l

l 1

l l

l 62

. 1

4. Strategic Arena: Excellence l

~

Genefal;Goali Af'7he;NRC.regtilatory. program-will.be efficient and will

' . ' " a'llow ,th's, Nation .toihafsly;use nuclear materials .for .

, u; cit'91an purposes. l(Goal;VII)

~

~

~

~~~

Perfoinian'ce Goais:N -

..n - ' - '

e. c-:  : ..c ; '

regulatory .n'.

> " Impl<e;m:en. . . .m .t :the ag. .ency's plan:for/.7.

excellened i

$i:j%cnMV@2MfS.7WPSVD.R j '.:+ ':,;.c(GoalT.VII.A).

e :... "

> q. Ev51uaterand; implement-neededdmprovements5for?five major.NRCS l N / processe'st byDuli l',1999.' :. (Goal 'VII .8) . ~

+ 's

Strategi:EX 7.!1iEWeisilKmake: regulatory, excellence the:cornerston'e-for.all 1+ n: < : . :" L of.ouNstrategies'and: activities.

' ' ?. =W--c '

Substrategy EX.7 lilie iWe will proactively examine ~ ourfprograms'and ~

.,ggej .P.% 97. performance in, order to improve .the way we.~-do' ~our

.r . g. . .: ic 73.,.J.3 m .i.-Work through.: comprehensive.. systematic,? agency wide

approach to program assessment and improvement.

Planned Accomplishments:

EX 7.1.1.1 Conduct quarterly self-assessments of performance on the basis of specific criteria with performance measures to u ensure programs meet management expectations for on site on l

time, and on target.

Measure: Cornpletion of self-assessment each quarter (Target: One per quarter)

Substrategy EX 7.1.4: We will provide training and development to our staff te enable'us to achieve excellence in our

- oraaMzatitgal and individual . performance.

Planned Accom,r nments: l EX 7.1.4.1 Conduct training to the Regional Staff on allegation management and enforcement. l l

I f

63

Measure: Completion of Training by Regional and Residen:

Inspectors (Target: 100 percent of Regional /

l Resident staff for allegation training and 75 percent of Regional / Resident staff for enforcement training)

G e

9 6

9 e e

O 4

)

11 1

l I

64 i

l I

)

INDEPENDENT PERFORMANCE EVALUATIONS PROGRAM A. Resources gj{g@jtjQAM Ef3M.$9AB.!Fign }WE751999I#S$ $@*!.F#f20,00$$

krEN"UM '.PS?.$(E)$!ETER.Q PS f(k) .

. FTE e

,PS I$(k)f FlTE6# I fiiEifieTtS$po'nsdM '

'+'T-3 41!-25'? NM - 1. 25": D* '?1725:

B. Goals / Planned Accompl'ishments/ Output Heasures By Strategic Arena

1. Strategic Arena: Nuclear Reactor Safety General ~ Goal . 9 'Preventtradiation relatedideathsFor
  • illnesses due .to.* - - -

$%$p.-.m.ms -i 'ivilianinuclear". reactors:(Goal..' I).- M.W . - - *

.-:s ' ~"

TdWGQ :$iiM.G%WR:Qyw.h.3hs . : n -2'-

Perf6iinance 'Goaisi . %% W6; ' ?"4M- .

.?.M.M M E F 977$ n.

~

T.:: . :

>.a.:.W 4 %;c.W ivilianm.nuclear .reactoraaccidents-(Goal I). ~ # c '.4.~ '-

7;iyZero m + i. . ::w

~ . . . : m s.v; , .. ~

. ..,u -

  1. M' :. 5Haiiitiin'd6EMbij0e'nE94of even'tstwhiEhicolildilead @a severe' Ia'cciddfit

~

U V o- >".

.-: (G6al 3. A.3)pwkw:,:35>.ge::yy.c.T H: . --

. c

~

T

L2.: G.wj&m.. c

. %- :Me. -

> WZeiot deathsidue'to! radiation'or radioactivity ~ ' '

reldases from civilian.-

.e .::q q:. .:. n.19:: .x ., .. '-Fnuclear reactors

..: c(Goal I:A)r

~Zero.significant radiation exposures"due to civilian nuclear reactors m(Goal y w n.I.Bil)

,..y.+ . .c.w.: . -a ::s::p . : : ,

i.

i

\

StratepjJNRSl~-1.1fy';

~ p 7. %:.4:* 1.Wy., : .s des '~nsibiliU'Assur'64thatklicirisees:

for? conducting safe operations.'

discharge.their

, y ,. . -

. .. ..., . : .4. . .%. .. . , , . ,

Substrategy NRS 1.1.8: .We will maintain and exercise an incident response

-capability to ensure that licensees and the NRC are

. prepared to respond to radiological emergencies.

Planned Accomplishments:

NRS 1.1.8.1 Sup3 ort each incident response exercise by providing tecinical managers and staff personnel qualified to function in the incident response center.

65

i Measure: Number of exercises performed (Target: four exercises per year)

NRS 1.1.8.2 Respond to incidents with qualified individuals to assess l radiological emergencies and provide accurate assessments to response managers.

Measure: Membership and training qualifications of all reactor safety team and protective measures

\ . .. team. (Target: completion of semi-annual training)

NRS1.1.8.5 Maintain sufficient number of qualified individuals for emergency response in the Region.

Measure: Number of personnel designated for each position.

(Target: Maintain depth of three people in each position)

NRS 1.1.8.4 Re'viewchangestolicinsee'sEmergencyPlan.

Measure: Quality and timeliness of all Emergency Plan l

changes. (Target: 80 percent of licensee's Emergency Plans reviewed within 60 days of receipt)

{

NRS 1.1.8.5 Maintain the incident investigation qualifications of sMff.

n Measure: Qualifications of individuals on the IIT roster.

(Target: Provide individuals to be placed on the IIT roster as requested by AE00. Assure individuals on roster trained in accordance with requirements)

NRS 1.1.8.6 Maintain regional response procedures, equipment, and facilities in state of readiness.

Measure: Adequacy of readiness for exercises and events.

(Target: The ERC perform surveillances of equ1pment as defined in regional procedures.

ERC update procedures one time per year) 1 i

66

r i l

l l

1 1

2. Strategic Arena: Nuclear Materials Safety l

General Goal:OMPreventuradiation

. .. a related-deaths.-or-illnesses due to.

q' t.i'. civilian.useiofaour2er 7:.M" material a s7 'F

'~ ~

(Go'~"7l TII)b;. ' ' byp'rbduct

. J .; .J-a n

. .e . . v 1

.,. -+ M = = m ._.

G=--"-+--,- b =W Performance R:

qu msty'es Goal's':%.hd61232Wrf&#MikH1%W%4 . &&M W ,

4q$2ErT7radiatj6n'-Trdlited disihMdilbitMNiNaiPS M Ed&5tifpy,6ddddan~

M%smsIntQtan:r.

'  %. disp> >s'ci61

> . . . -niscl6&Faiatd6181sh(G6aRII?A) 23niamir=rMw.

  1. "IN .

[ .

P_. No%icFeaseTthEn~umbeETfYiiiidWestnidfaiT5n7ex ossioffdre%fiMfesMbypr6d0tt*an'd'spTc~isl 6DElii~ te" HisNyW sWEd7tr b

FL4 Gal o

3 ITB)MN4N!*"Osb4'"*

sueWp60/eptit. i4YGi

" *- N' g -

4 Sncr,ea.;m);y.~w.,>

we se lnitheinum r2of.llosses'be.=.:W.+

c

2-8. m =.. ... + -i m.=ds.tJds"Of6.R 9.

j wn ar.epor.ted R.

A:.toiCongress c-v:" N Mc

- ..Q.Wmlu;1; annually;;;.(GoalJII:C)Ml 4 W :.: i . ;; @ u w 3 : .-. . .. C.Anns1.W22k}#n.:rh%? = M

^

Nojaccidentalterit'i cal'ity d nvo1~ving ilicensed. materiil . 1(GoaFII;D w

  • M. h.WWUnW4drm:cMj;ainumTans;M.if4Wu.u; si.h4)P.P

~ E'f.: NoWncre^ as'eVikthe numbar7ofmmisadministration dvents whichscause i

n.Issignif.icanteFadia' tio'n?expi6suFesW(Goal 5IIiE)nWF '7' ~ ~ " ~ ~

StrategyjNHS;2;If.1We:will assure-th'at<li~ censees discharge their:pr.imar.y

~

" ~ responsibility for using materials safety.

.i Substrategy NHS 2.1.5: We will license and inspect. facilities and material i users to. help ensure that they operate and.

decommission safely and develop safe products.

l Planned Accomplishments:

NMS 2.1.5.1 Sup) ort each incident response exercise by providing tecinical managers and staff personnel qualified to function in the incident response center.

Measure: Number of exercises performed (Target; one

, exercise per year)

NHS 2.1.5.2 Respond to incidents with qualified individuals to assess radiological emergencies and provide accurate assessments to response managers.

l Measure: Membership and training qualifications of all fuel facility and materials safety and protective measures teams. (Target: completion of semi-annual training) 67

i

, NMS 2.1.5.3 Maintain sufficient number of qualified individuals for I

emergency response in the Region. ,

}

Measure: Number of personnel designated for each position.

\

(Target: Maintain depth of three people in each position)

{

Strateg : NHS'.2:2;-:We wilt.-regulate usesi.co~nsistentiwith .th'e~1EVeP6fd.'iik??? {

NJ .WgM t'gkinvolvediby!decreasingioversightiofdhoheima~terlials

, 3 l

@$(5MNiSMfffjp6seithedowestiirad{6.l_og.ica];irisk i to theDQb]ichan'dd[th'ati-f 1

.- 4 'ct4W,7.es,cb5ffn0ing empha51sion:high riskractivities'.*fFMieA'.h i SubstFate'g9')NMSS2:2 TEWe wil.1toseh15kYa'n'slysisiconceptseaiidEotheS'#4. /

7 31. 00 i 7%'E.ey$;fi/;M

. r, .- .sn19h? approachesito7 determine (the. relati0eirisks.b~fWhel i- i t._ .t.tc. regulat'ed_ activities .in.the. nuclear.: mater.iilsVareat.

Planned Accomplishments:

NHS 2.2.1.1 Support AE00 nuclear materials event data base (NMED).

Measure: Provide input to NMED for materials events in NRC and Agreement States. (Target: Provide input via the HQ Operations Center within two days of receipt of event) i M

1 68

A

?AR~~

3

_ANNIEJ ACCOV3 _::S V EN~~S -

3Y 3ROGRAV '~ AREA a

S C~~::0\  ::::

S::GN:::::CAN-~ REG _A~~0RY

_ .m _ _ _ _ . . _ _ _ ,_ _ ,_

_ - - - _ _ _ q _ _

{

_ _ .. _ v _. - v __.

I \ ::~~::A~~::V ES l

i i

69

{ .

i Sionificant Reculatory Effectiveness / Excellence Initiatives Region II's plans for self-assessing our performance during Fiscal Year 1998 are provided below. Foremost in our assessment plan has been the use of quarterly self-assessments by each Regional Division.

Our assessment plan includes audits of specific areas. We plan to invite participation in these by other Regional and Program Offices. Our plan also includes continued participation in Agency performance reviews such as the

' IMPEP of Agreement States in other Regions. IMPEP of other Regional materials and fuel facility programs, operator licensing, and allegations.

i Reaion II Performance Assessment Plan For FY 98 Obiective The objective of the assessment plan is to (1) provide a systematic approach to. evaluate strengths and weaknesses in the implementation of programs assigned to the Region and (2) provide input into decisions where the i performance should be modified.

! Process / Goals The process in FY 98 will consist of the following planned assessments: '

1. Quarterly self-assessments of ]erformance by each Regional Division.

l The assessments will include tie establishment of performance indicators l and measures based on the Operating Plan agreed u

Office and based on the Agency's Strategic Plan. pon with the E00's The assessment results will be reported to the Regional Administrator and discussed during the Region 11 management retreats.

l i 2. Targeted evaluations in areas where there is potential for performance l

problems. These areas are selected to aid in the early detection and j i

i

]revention of problems. The group assigned to perform these audits will  !

]e proactive in seeking the participation from other Regional and '

Program Offices. The evaluations for FY 98 will include:

a. Review of the security and handling of financial assurance ,

l documents (Reference MD 8.12). I i

b. Review of the Radiation Safety Officer function in the Region. l l

l l

70

c. Review of the allegation process and the quality and timeliness (

allegation closures (Reference MD 8.8).

d. Review the progress toward implementing the results of the NRR sponsored job task analysis for DRP functions in the Regions.

'e; Review of' the quality of the issued inspection reports from perspective of whether focused on performance, appropriate message, and enforcement actions supported (Reference Manual Chapter 0610 and the Enforcement Manual).

f. Followup review of the implementation of the Regional Security Plan.
g. Followup review of the issuance of exemptions.

I l

l n

9 71

1 I

. 3A R-~ 3 R_,a..,NA_

r .. u

~

y A\ AG v E;\~~/ORGA\ ::ZA~~::0 \

AC~~::V::~~:: ES 1

l l

)

l l

l l

l l

l l

72

l

  • l

, PART B:

l REGIONAL MANAGEMENT /0RGANIZATION ACTIVITIES The following provide the targets for the activities indicated:

a. . Supervisor to Emolovee Ratio

'The current Region II supervisor to employee ratio is 1 to 8 and thus meets NRC's goal. Region 11 plans to continue maintaining this ratio. )

Twice each year. Region II management will evaluate the effectiveness of l

the organizational structure to determine if further reductions can be made in the future without negatively impacting mission accomplishment.

b. Positions'at" Grades GG 14 and Above l

The Region plans to pa'rtner the Staffing Plan that will meet the Agency s 42 percent goal.in this area by the end of FY99. Region Il makes every effort to reduce its number of GG-14s and above by reviewing l

each vacated position by senior managers to determine if the backfill needs to be'a GG-14. Since the Regional reorganization in FY 1996 resulted in eliminating section chief positions. Region II has had six GG-15s that are not in supervisory positions and that significantly skew l our "GG-14 and above" numaers. As discussed during the recent Region II i

l Management Retreat, thirty-six staff will be eligible for optional ,

retirement between now and the end of FY 1998. 22 of whom are at the GG-14'and above. Consequently. Region II will be able to reduce the total number of GG-14s and above" positions b most crucial GG-14 mission-related positions. Once y backfilling only Plan the Staffing the for FY99 is approved. Region II will replace the GG-14 positions with

.GG-13s in' cases where not indicated as a permanent GG-14.

c. IT Initiatives The Region does not )lan initiatives other than implementation of those promulgated by the C11ef Information Officer l d. FTE Staffvear Manacement t Throughout the Fiscal Year 1997, the Region took initiatives to reduce i

the FTE from a ceiling of 223 for FY 1997 to a ceiling of 219 for FY98.

i The Region maintained a steady yet conservative staffing approach to ensure that mission needs and staffing goals were met without exceeding i the FY 1998 FTE ceiling. At the beginning of FY 1998, the Region had 221 employees on board. Given the attrition rate of approximately 3 percent, this level of staff will prepare the Region to meet operational needs without exceeding the FTE allocation of 219 for FY98.

l e. Procosed Contractual Pro.iects The Region plans none of these during the Operating Plan period. l

f. Guidelines for EE0 and Affirmative Action in Operatino Plans The Region, in conjunction with the Office of Small Business and Civil Rights, proposes the following planned activities or areas of emphasis i

73 l

l l I

\

(

in this area during the Operating Plan period.

Support employee development and career enhancement through rotations, details, reassignments, and formal training.

Specifically, assure that minorities and women are provided a fair opportunity to participate.

Actively supporting the activities of the various Agency EE0 advisory committees, and support employee participation in these l activities,.

,Be proactive in providing candid feedback to employees through the {

performance appraisal process: in providing monetary and non-  !

monetary recognition to deserving employees: in monitoring awards and training activities to ensure fair and equitable participation of women and minorities:. and in encouraging qualified women and minorities to participate in executive leadership programs.

Ensure that'all hiring activities inciude specific affirmative l .

action efforts to include minorities and women in the pool of candidates, i

Support the Agency's Management Diversity initiative and attend required and refresher EE0 training. ~

When filing vacancies, utilize broad rating factors, when l possible to facilitate a more diverse pool of candidates.

d'ctivelyseektopromptlyresolveissuesthatcouldleadtoformal EE0 complaints.

Discuss EE0 initiatives for the office with supervisors and l l

employees to facilitate understanding, demonstrate support, and i encourage open communications. I i  ;

l l

I l

l l

74

PART B. REGION II SUPPORT ACTIVITIES General: Goal g n ' ~~""""T'~~'~'^ P

. . . . y .. - . .

N . .. ,g. y - ,733js ... g,

.s Program. .

out uts.,that;suppor,t/all Aggey general g goals.and.per.formance ' goals I  ;

VIIFA'{andg I,I"A71 Q f.~ }. Q h. p . m ..

Pg*anhWM istsiaf.wzewMol-EMMs  :~ .,. ~

'"'"L'h?']hh6YAQW-&WrhG -

~ a % 5?O;e

([y EErNb

~

d$i.g(Gp,'agIII. g3ggggg.n nece[Ehkr$4hChheve31ts.-genera

, .2 .

, g;;7,.9 j; ,

(gcia Eh$$NNf!$fSINEInYCbeYtYdtN57eSi,b

' q:4 Dive'rse' Work:F6rcel(Goal thical[hk$ftb11yO-III.?A H).?.J.- A ...r.~..r.W i G T.-' h - r-Management and Support Planned .High quality, culturally diverse applicant pool Accomplishment . .

Measure: Applicant pool provided consists of highly qualified candidates frw agency identified underrepresented groups. (Target: Consistent with the Agency EE0 Plan)

Planned Replacement Hiring 1 Accomplishment Measure: The nu7ber of vacancies for which staffing support is provided. (Target: Provide staffing support for filling vacant positions consistent with Staffing Plan targets}

Planned Human resources advisory products and services Accomplishment to managers and employees Measure: Benefits forms, training requests, and personnel  ;

actions are processed within established time frames. (Target: 95 percent of above requests are processed by the effective date of action)

Planned Develop Region II's Annual Budget Measure: Timeliness and Quality of Budget (Target: FY 2000 Budget information submitted to OC in appropriate time frame to support 2/99 budget submisston to Congress: FY 2001 Budget information submitted to OC in appropriate time frame to support Budget Request to WIB 9/99)

Planned Collect amounts due NRC Accomplishment  !

Measure: Timeliness of license fee data submissions to DC (Target: Provide license fee billing data to 1 the DC within ten calendar days fra the end of 75 \

}

the Quarterly fee Perlod)

Planned- Processing Travel Authorizations and Travel Accomplishment Vouchers -

Measure:

Timeliness of travel authorization and travel voucher processing (Target: Travel authorizations are prepared by the date required by the traveler (when authorizations are

  • ' submitted in ccmpliance with NRC directives).

Travel vouchers are to be audited and reimbursement checks processed within five work days after date of receipt of the voucher.)

Planned . .P.rocurement of supplies and services necessary Accomplishment to the functioning of the Region II Office.

Measure: Timeliness of processing of requisitions and purchase orders as determined by randorn sample of 30 each quarter. (Target: 90 percent requisitions to be processed within 14 work days after date of receipt. 90 percent Purchase Orders to be processed within 14 work days after date of receipt.)

Planned Provide standin Accomplishment timely manner. g information reports to management in a Measure: [1ghty-five percent of reports to be issued in accordance with scheduled time frame. (Target:

Onsite and Back Shift Reports - five work days after end of Pay Perlod Inspector Utilization - five workdays after end of month Management Information Report - 15 work days after end of month Inspector Followup - five work days after date of receipt RITS Audit - five work days after week ending Plant Status and Morning Reports Plant Status: Daily by 7:30 a.m.

Morning Report - Daily by 1:30 p.m.

76 -

. t e e e 0 a s 0 . e e e e e 3 e e e e e e e e e e

_ n e 2 2 1 e e 2 2 2 2 2 e e 2 e . s e s 0 T s 9 5 2 s s F F 7 r e 5 7 0 2 7

2 7 7 2 e 1 e e 4 0 2 s. 0 .

i s 2 2 F 7 7 7 3 i 3 s

_ 2 . s 4 e

m i

t e

m g e A A S e c 0 E F c M K s u m,. .

J s P P

_ T o 1 5, a a 0 0 Q R s T 2

m.

eim f F

.t m =,

i t

n g e 2

1 e

2 3

S S

e t

e m

e m

e i

e .

h m c o a

- s mem

,. .i t

t A

2

. t i

. t

_ n m.

s e

ms i

_ e 2 2 S s 2 e 2 e 2 2 2 4 o 5 5 5 r e m

es 1 1 S s 3 N S 1 t 5 1 1 1 t 1 1 2 3 u

t s

3 m,

r

'8 m.

9 9

1 r

a s

e em n

o-i i

s e

m u%.

_ e Y s 3 e em

_ s e o 2 2 e 8 8 s e 6 o o e e e o 2 o s t 6 o l e s 3 1 3 3 3 3 s 8 e e s

_ a r 1 i 1 t t t t 2 t 2 1 t s e 5 5

o c

e .

_ c 1 s s is  % . e F

r o

w . .

1 d

a n

e s

s e.

_ f e ,

i g mm s u t

m e oc s  : e e .  %

s

. .t

_ g e o o 3 2 2 e e e .m r S > 2 e 2 2 2 2 2 8 e 5 o .

_ a ns t t 3 3 S 1 9 v 1 1 1 1 1 S 2 6 5 t .

_ T s e

s 3 s as n a m e o

e e  :

i p .

t s u .

c s .e. m.

e e p p

e

  • i

_ m s m u ee n m e

s ep ss

.e i

a e .

h c Eu r

n c 2 2 0 e 5 o e e e e en N M M 2 2 2 2 8 e

^

n a

r 1 1 3 2 3 t t t t 1 1 1 1 3 i S mie e s

_ B

.e e s ee . .s i

e a m . .u _

it s .

e il c

a e

==

= F i o m.

_ F r me e ee S e2 m.

i .

a o

_ l ha S e s e o 2 2 8 8 8 s e e e o o o o e e a 5 M s

.i .

4

_ u p e

t t F 3 3 3 3 i s t t t M t t t t t 4 s a e 3 8 1 s e e F

1 1

m 1

esasa bamer m =,

m

_ n s O .i .

_ i o e e en g s eO D m, m, _

e

_ oE . .

_ R n S.

r aF M i

e s F a

m s n s n n n r n a

a m

s e 'n a

s e

w e

i s

se e

n es m

s ae m

a i

n o

e s

t n

em m

u se e m

e e

a m s e

w e s e

a m

e m

n r

e o

s e ma mm r. e.

m p y p a s s s s am u .i a

s s

A e

p s A a

s T T T T e

Y e

T e

O m

Q e

u G

e e

O e

m G

m e

G e

u

- A p

S p

e A y -

O e

s G

n e s

g e s

s eS t r

.e e

n se h

st y u s u e P m

iG. . _

T au n

ac u .t m, er s 3

2 3 p eo ee n .

) S e I S m ag P P e a mm r

u S

P s s p P s e, m eu e me m u e e y ss n e. .i em s p 3 s _

o o on n3 s p) a A ry ) R N e )

W ) ) p We 03 r m m, h r r n e p G ) 7 7 e BB P) s

.s a t s p p ot o a s

e y s

s mm e p u W

L L

T

(

s u

(

u s a

E 0

9 0(

0 e p

A D E s.

s s

m c

e a

p ta e .2 s s of r S_ 2 (

e e8 e . _

m m e s x e s e s a a 2 s( e r e s l s l t N N s n e

a e e t i

e e e e e s m m a e e o m

e 3

s e e B t e e e v n

u v em e

s e

s e s e a s e

S s _

3 e s e c s e b a

t e e s

e e e B e sp s e m s r a u G e s s s e s s e .u r A U

nu A

e 0

E L _

ms ee -

E U u e t

E U  :

s t

s E

H T so s s le r..

af .

t a y e.

senm du p s e n s a s a ns a.e s e e e e o lu ss e

m ss u su ss na r s n .

e s m m n n n e e m a e e es e t t t t s

e m ec ee a m a e e e s s s s s o e u e m e u e a se e s en .

u m m m m es e e e e e o g p p p p es m a n I s r m e e s m m m su C C C C C C C e p sn e e e s e p a m o p m

o e p s a p m ta S S u e n s a n

u sm o us e .m oy cy c oy c s o m su ss n em $ S S u b ae n p e a n

am am ns amo g se e m

e ly y ny ly ir e s e s T e .e.

W*v n n m n y

m s

e a s e s s e

u n ms m ss ss em s A s n e o e $s e a

a m

n s

a m S

e s

e ma s

S 3 E d

R e T P

is am A

se n

am e

te s

F e

F a

F e

e e

F e

e F

r e

m e

n m

e n

s b u u s sepe.

k t

u

. ie m

i T

  • 8 Dpm

,)l L

l t

a 8 0 6 5 5 4 0 8 o 4 2 6 1 1 O 4 0 0 0 0 T 4 4 4 9 9 5 6 3 4

to u

2 8 0 3 2 6 1 1 e

s u

o _

hg 7 6 4 5 6 6

- e n 9 6 7 9 5 3 8

- s e

_ W le u

4 0 8 1 2 6 5 0 2 4 5 9 5 5 _

6 1 1 6 8 1 1 5 _

1 _

2 g 6 9

4 6

5 7

4 6

6 5

5 5

3 4 0 0 4 8 6 1

6 8 6 6 4 g: 3 D

F N 8 8 8 5 N 2 0 2 1

5 4 6 3 8 6 2 5 5

6 1 1 8 1 1 W 1 B

y

, n r e r u

s e e r o in t

n t

n n o la c+

e r h h a a r

o g p a m b c c t y

u m R y o a a o A lo H u e T V V T G H S

e.

t M ,.

u e.

L

e. . a e

s e.

G, e

a, -

. e f ,

. C ,,

e r n 0 .

G..

t s

_ a C

.t. 0, , et o .

- m..

4 D

a e.

c f

C F.

. o. f;, -

_ . m. .

e. .

. e. . ,

_ - .., t . e

e. . ,

.. o. a C

.. - aL S

E C

P L

C w

s o .- G 0. a s .

.t h

c F

. e s. . . a e-

. - 4 e g . r g e ..

s.

t- g 1 C

. e .

. t . e .

,- f u .n . .. .

D a, ap . s.

m e p . .

e.

es

.- 3 e -

t W at ,, t D- t e e p t , 3 =

p .

p 1

4 a o

t

=.

r 2

. 8 F

e. . . . .

F a.

s, C.

(

f 4

.f

m. . .A E. h T..

e.. C .

g.

a m_r..

t

.- E..

C

- C F

,. c

. ...u r e

y, 1 e... n e

o C .

C F

se s .-

a C

~ w m

, . . h

. g c

.a. w , a

..e. .-~A,=. .

8 . ,, s.

e . r. t 9

. = .. Y..p .

. t 9 a a -

e. . A

~m.

1 R

1.s n

d. t as,.

.r ..n,"..

C

. .II a

2 g

t

.^

^

s A

E Y e . _

L .

A -

5 C

_ S I

_ F

a. -

R se.

O . s. .

i

_ F o g

E L -

U a D .

E .

- H . m. s C t

_ S

_ N .

O ~

I .i T -

_ C -

_ E .

P .

_ S N

I .g.

  • , e e.

S . ne. 1 e .

_ E I

r. a.

. s.e e g., t J

/

L 3

_ T t 3 t 5 I

_ L I .

_ C ,

u .. ,

e

_ A .ss .. .e e F T i

a.

r F.-

g t

m s .. U.3 .

L .

. e.. .

I .

~

E C A

_ U ~

_ F 1

1 u

.s s

. 3 g.

u. -.

N v-t .

O I

,r

.s e

e F.

g

e. e
g. . .A..

.P G

.p G .

E R .

. e

g. - e g, .. .-

t.

t s.

s A A e

L e

t2 e

. .e

- F . t. .

L.

G .

. .c. .

e A

.h P .

A ..

=-

w s u

g

. t o e ,.

t

- e-g g

.. . p . F . .

g .

w .

3 t

e e

e t

t se .

3 s

3 p

2 0

. - D w

t

, . 3 3

5 m.

I i i s I E

) , .

E f l

, 1 1 i lt i i l

I j is[I  !  !

"I i il li

! s t I l j ,i ,1 l'  !- l,

' 1, ,'

a I 1 3

g h j j iI

! I g i i l 1] . jj

. ij -

j.

E 11 iil I $

i11 g

4 >

5!

t E

m ]

$E S5 )

5' Ii :i .i! i .ii

]1;u!!

- 1

,i 'a l yj 1 111 l

E .

5  ! ij  !}! ij !j g 11 5 El !j lIlI g .

L '

d 11 11 2

=

frI h I b $

a .

! li f i li!  !

l 1

l I i I! l

ll!!l 1 's] 51 i

.e f *ne0I $ g j

I 17: I 5 it U :t 1 i I l l I i l l l l l l l

l APPENDIX D: INSPECTOR ACCOMPANIMENTS & INSPECTION FILE REVIEWS 1

l 1. INSPECTOR ACCOMPANIMENTS 1

l Licensee: Virginia Equine Imaging j Location: Middleburg, VA l License Type: Veterinary Diagnostic Inspection Date: February 2,1998 l License No. 45-25405-01 l Inspection Type: Initial, announced Priority: 5 Inspector: O. Bailey Licensee: Mc Donough Bolyard Peck, Inc.

Location: Fairfax, VA License Type: Portable Gauge inspection Date: February 5,1998 License No: 45-25409-01 Inspection Type: Initial, announced l Priority: 5 Inspector: O. Bailey Licensee: Best Industries, Inc.

Location: Springfield VA License Type: Brachytherapy, Mfg. & Dist.

Inspection Date: February 3,1998 License No: 45-19757-01 Inspection Type: routine, unannounced Priority: 3 Inspector: O. Bailey Licensee: Mount Vernon Hospital Location: Alexandra , VA License Type: Hospital ,

Inspection Date: February 3-4,1998 License No: 45-17187-01

)

inspection Type: routine, announced  !

Priority: 5 i inspector: O. Bailey .

l l Licensee: Prince William Hospital  !

l Location: Manassas VA. J l License Type: Hospital >

Inspection Date: February 5,1998 License No: 45-19485-01 Inspection Type: routine, unannounced 1 Priority: 3 l Inspector. O. Bailey  ;

i I

I  !

l Licensee: University of Florida Location: Gainesville FL License Type: SNM Inspection Date: February 24,1998 i License No: SNM-1050 l Inspection Type: unannounced i Priority: 5 l Inspector: B. Parker l

Licensee
Great Lakes Dredge and Dock
Location
Green Cove Spn.'gs FL License Type: Undenuater density gauge Inspection Date: February 25,1908 License No: 09-2489 l-01 l Inspection Type: unannounced 1 Priority: 5 Inspector: B. Parker l

Licensee: Veterans' Affairs Medical Center Location: Lake City FL License Type: Medical Inspection Date: February 25,1998 License No: 09-25129-01 Inspection Type: unannounced Priority: 3 3 Inspector: B. Parker I Licensee. Computer Sciences-Raytheon Location: Patrick Air Force Base License Type: Calibration facility l Inspection Date: February 26,1998 License No: 09-25013-01 Inspection Type: unannounced Priority: 3 l Inspector: B. Parker Licensee: Veterans' Affairs Medical Center l Location: Gainesville FL l License Type: Type A Broad- Medical l inspection Date: February 23-24,1998 ,

License No: 09-12467-02 l Inspection Type: unannounced l Priority: 1 l Inspector: J. Pelchct and B. Parker

2. INSPECTION FILE REVIEWS File No: 98-01 Licensee: Dr. Jose L. Femandez License No: 52-25114-01 License Type: Therapy - Strontium -90 Eye Applicator

- Inspection Date: June 9,1997 Priority: 3 Type of Inspection: Compliance Action Follow up Inspector: J. Diaz Velez Date of report: June 9,1997 Supervisor's Review: John Potter Comments: This was a special follow up inspection to an enforcement action taken'against the licensee. During a previous inspection in March 1995, che ir spector noted that the source calibration certificate was incorrect and also the doctor had neglected to account for decay of the source when treating patients. As the result, the doctor was required to notify all patients of their misadministrations. The inspector confirmed that patients had been notified during the June 1997 follow up.

File No: 98-02 Licensee: United Hospital Center License No: 47-01458-01 License Type: Medical inspection Date: March 26,1996 Priority: 1 Typt, of Inspection: Nuclear Medicine & HDR Inspector: L. Franklin Date of report: March,1996 Supervisor's Review: John Potter Comments: There were no violations uncovered during this inspection or during the previous inspection in January 1995. Therefore the supervisors agreed with the inspector's recommendation to reduce the inspection frequency to 2 years. Region ll followed the guidance in Inspection Manual Chapter (IMC) 2800-05 to arrive at this conclusion.

File No: 98-03 Licensee: Cardiovascular Radiology Institute License No: 52-25016-01 License Type: Private Practice Nuclear Medicine inspection Date: September 28,1997, and September 29,1997 Pricrity: 3 Type of Inspection: Unannounced Special(Change of Ownership)

Inspector: H. Bermudez Date of report:

Supervisors Review: Charles Hosey Comments: The scope of the new owner's operations was not described very well other than to indicate an increase in the patient workload since the last inspection. The previous owner died

)

i

. in May 1995, and the practice was sold to the new owner shortly thereafter. The inspection was I made specifically to review the new owner's operations and compliance with regulations.

I o

File No: 98-04 Licensee: Hospital Interamericano License No: 52-25019-01 License Type: Nuclear Medicine and Internal Therapy inspection Date: September 25,1997 Priority: 3 Type of Inspection: Routine Unannounced Inspection Inspector: L. Franklin Date of report:

Supervisor's Review: John Potter Comments: The inspector used the pilot Nuclear Medicine inspection form draft #87115A.

However, inspection notes were limited in their description of the operations. No independent measurements were made by the inspector although he did say a reading at the hot lab was

<0.1 mR/hr. The type of instrument used and calibration date were not given in the report.

File No: 98-05 Licensee: Puerto Rico Ind. Development License No: 52-19377-02 License Type: Portable Gauge Inspect!on Date: November 20,1996 Priority: 5 Type of Inspection: Unannounced Routine Inspection inspector: J. Diaz Date of report: December 3,1996 Supervisor's Review: John Potter Comments: Notice of Violation issued on December 3,1996. Licensee's response December 31,1996. File closed February 19,1997. Very complete report and compliance action.

File No: 98-06 Licensee: NASA (Langley Research Center)

License No: 45-01052-21 License Type: Research and Development inspection Date: January 17,1997 Priority: 3 Type of Inspection: Unannounced 1.1spector: A. Jones Date of report: January 17,1997 Supervisor's Review: T. Decker l Comments: Complete report and inspection. l 1

1 1

l l

r File No: 98-07 Licensee: Department of Interior License No: 39 25372-01 i License Type: Research and Development I Inspection Date: July 31,1997 j Priority: 5 l Type of Inspection: Unannounced and initial Inspector: B. Parker Date of raport: July 31,1997 Supervisor's Review: ,

Comments: Initial inspection described the scope of the licensee's operations wel'. No '

I violations noted.

1 1

File No: 98-08 ,

Licensee: Columbia Pentagon City Hospital I License No: 45-17123-01 j

License Type: Nuclear Medicine inspection Date: March 18,1997 l Priority: 3 l Type of Inspection: Announced Reactive inspection. l Inspector: J.Henson i Date of report: March 1997  ;

Supervisor's Review:

Comments: Reactive inspection made after notification that a contaminated package was received from Syncor Nuclear Pharmacy. No violations against this licensee were uncovered.

File No: 98-09 Licensee: Dr. Santiago Garcia License No: 52-25245-01 License Type: Therapy, Strontium-90 Eye Applicator Inspection Date: May 1996 '

Priority: 3 Type of Inspection: Unannounced Routine Inspector: H. Bermudez Date of report: May 1996 Supervisor's Review: John Potter Comments: The Module 4, Sr" Eye Applicator quality management program review needs to be expanded to identify a requirement to review the instrument's calibration certificate. The original output and decay-corrected output for the day of treatment.

1 I

I File No: 98-10 1.icensee: Department of the Navy i License No: 45-23645-01NA l License Type: Master License inspection Date: June 19,1997 i Priority: 1 l Type of Inspection:

l Annual Review (

Inspector: J.Henson l Date of report: June 1997 l Supervisor's Review: '

Comments: This was the annual review of the Navy's master license. During the review period, there were permit reviews performed on June 13,1997, by A. Garcia, Region IV, a reactive inspection on February 28,1997, and four permit reviews on March 14,1997. Findings: The l Navy is exercising management oversight for adequate control. j l

File No: 98-11 i Licensee: Applied Radiant Energy Corp.

License No: 45-11496-02 License Type: Pool Irradiator Inspection Date: September 15,1997, and December 3,4,8, and 9,1997 Priority: 1 Type of Inspection: Pre-Licensing inspector: W. Loo Date of report: December 1997 l Supervisor's Review:

l Cornments: Repeated visits to the site to evaluate construction of the facility for pool irradiators l operation. T'.; licensee was having difficulty with the construction of a storage pool, because  ;

of leaks. l File No: 98-12 Licensee: Virginia Polytechnic Institute License No: 45-09475-30 License Type: Veterinary Research inspection Date: May 21-22,1997 Priority: 1 Type of Inspection- Routine Unannounced Inspector: A. Jones and B. Parker Date of report: May 1997 Supervisor's Review: T. Decker Comments: Very good description of the licensee's operations. Report discussed with A.

Jones, inspector, during review.

File No: 98-13

- Licensee: Alexandra Hospital l

4 License No: 45-09358-02 l License Type: Nuclear Medicine and Brachytherapy (HDR) l Inspection Date: April 23-24,1997 Priority: 1 l

Type of Inspection: Routine Unannounced Inspector: A. Jones

Date of report
May 1997 Supervisor's Review: C. Hosey Comments: Used HDR inspection checklist 024 and 025, also used QMP forms for all other modalities. Report discussed with A. Jones during review.

File No: 98-14 Licensee: United Hospital Center License No: 47-01458-01 License Type: Nuclear Medicine with HDR Inspection Date: April 3,1996 Priority: 1 Type of Inspection: Routine Unannounced Inspector: L. Franklin Date of report: April 1996

Supervisor's Review
J. Potter Comments: Supervisor concurred with the inspector's recommendation to extend the inspection frequency based on no violations found on this inspection or previous one.

File No: 98-15 Licensee: Wetzel County Sanitary Landfill License No: 47-25146-01 License Type: Portable Gauge inspection Date: April 3,1996 Priority: 5 Type of Inspection: Routine Unannounced lnspector: O. M. Bailey Date of report: May 1996 Supervisor's Review: J. Potter Comments: Notice of Violation issued on April 17,1996; response received on April 26,1996; file closed May 28,1996. Complete report and inspection notes. Inspection discussed with O.

Bailey during the review.

l i

I

File No: 98-16 Licensee: McCallum Testing Labs License No: 45-15325-01 License Type: Portable Gauge I inspection Date: September 12,1996 l Priority: 4 l Type of Inspection: Routine Unannounced i inspector: B. Parker and J. Potter Date of report: September 1996 Supervisor's Review: J. Potter l Comments: Inspection included a field site audit while the portable gauge was in use at a Navy base.

l File No: 98-17 l Licensee: Nondestructive inspection Service  !

License No: 47-11883-01 l License Type: Radiography l Inspection Date: December 17,1996 i Priority: 1 I

Type of Inspection: Routine Unannounced Inspector: L. Franklin Date of report: December 1996 i Supervisor's Review: J. Potter Comments: Very limited description of the licensee's operations. Three violations noted during  !

the previous inspection were reviewed and closed. There were no violations noted during this inspection. The inspector did not include a field site-audit of radiography operations. The inspector used Xetex 305B, serial #25714, calibrated in February 1996, to make measurements of the storage area. The meter should have been calibrated no earlier than September 1996, i the licensee's 3 month meter calibration interval. The next inspection date was extended to l December 1998, by the supervisor. )

j File No: 98-18 Licensee: Roanoke College License No: 45-10085-04 License Type: Small Research and Development inspection Date: October 21-22,1996 Priority: 5 Type of Inspection: Routine Unannounced Inspector: A. Jones Date of report: November 1996 Supervisor's Review: C. Hosey Comments: Three violations cited; Notice of Violation issued November 7,1996; response received December 3,1996; inspection closed December 19,1996.

i l

l 1

File No: 98-19 Licensee: Isomedix Operations, Inc.

License No: 52-24994-01 License Type: Poolirradiator Inspection Date: October 22,1997 l Priority: 1

! Type of Inspection: Routine Unannounced 1 l Inspector: J. Diaz and J. Henson l l Date of report: November 1997 l

Supervisor's Review: C. Hosey l

Comments: Team inspection to follow up on the previous inspection of March 31,1997, where serious violations were found and an enforcement conference was held. Complete report with l good description of the scope of operations. No violations noted.

1 File No: 98-20 l

Licensee: EG & G License No: F1806-1 l License Type: Radiography (Reciprocity at Kennedy Space Center)

{ inspection Date: March 20,1997 l Priority: 1 Type of Inspection: Reciprocity Unannounced l

Inspector: J. Pelchat

! Date of report: March 1997 l Supervisor's Review: T. Decker Comments: Radiography inspection of office files only. No field site audit during this or the previous inspection in May 1996.

File No: 98-21 Licensee: Pensacola Testing License No: Fi 117-2 License Type: Reciprocity

?nspection Date: April 21,1997 Pdomy: 1 Type of Inspection: Unannounced Reciprocity Field Site inspector: O. Bailey i Date of report:

Supervisor's Review: J. Potter Comments: Good description of a field-site inspection of this State of Florida licensee operation under reciprocity at a Federaljurisdiction site. The inspector listed Xetex model 305B survey meter that was last calibrated on February 21,1996,14 months ago. The inspector said she may have used another meter and recorded the wrong one on the report. During the review, the meter that she used was located and the meter's sticker indicated February 21,1996, as the last date of calibration, l

l

1 f

File No; 98-22  !

Licensee: West Virginia University I License No: 47-23035-01 l License Type: Broad-Scope - No Medical Inspection Date: March 20-21,1996 Priority: 1 Type of Inspection: Routine Unannounced Inspector: L. Franklin Date of report: April 1996 i Supervisor's Review: J. Potter l Comments: Limited description of this University Broad-Scope license. No mention of the use of hazard guides to assign oversight for project authorizations. Laboratory inspection field-note form used to record observations during inspection of selected labs.

I l

I I