Forwards Insp Rept 50-298/97-07 on 970629-0809 & NOV
ML20216C615
Person / Time
Site: Cooper 
Issue date: 09/04/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20216C620 List:
References
50-298-97-07, 50-298-97-7, NUDOCS 9709090100
Download: ML20216C615 (5)


See also: IR 05000298/1997007

Text

-___ _-_____-_ _ _-___-______ - _ _ - - _-__-- - -

.

g* "%

UNITt D ST ATES

4

/

ct

NUCLEAR REGULATORY COMMISSION

'

f

a t oioN iv

,

g * M[ g

611 RY AN PL AZA DRIVE. SulT E J00

y ...../

AR LING TON. T E X As 76011 8064

SEP - 4 1997

f

G. R. Horn, Senior Vice President

'

of Energy Supply

Nebraska Public Power District

141415th Street

Columbus, Nebraska 68601

l

SUUJECT: NRC INSPECTION REPORT 50 298/97 07 AND NOTICE OF VIOLATION

l

Dear Mr. Horn:

l

'

An NRC inspection was conducted June 29 through August 9,1997, at your Cooper

Nuclear Station reactor facility. The enclosed report presents the scope and results of that

inspection.

l

During this inspection, a focused review of operability evaluations and 10 CFR 50.59

evaluations was undertaken. Operability assessments often did not consider relevant

design information or did not document consideration of the relevant design information.

Actions were initiated to address this weakness.10 CFR 50.59 safety evaluations were

found to be generally complete; however, several f ailures to identify, correct, determine

the cause, or prevent recurrence of conditions adverse to quality were identified, in view

of previously documented weak operability assessments and corrective actions, we are

concerned that the corrective actions you have. implemented to improve these areas of

performance have not been more effective.

Also, during this inspection, a violation of NRC requirements was identified conceming the

ineffective implementation of design requirements in plant procedures. This violation is

cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding the

violation are described in detailin the enclosed report.

Please note that you are required to respond to this letter and should follow the

instructions specified in the enclosed Notice when preparing your response. The NRC will

use your response, in part, to determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements,

f

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document

Room (PDR). To the extent possible, your response should not include any personal

privacy, proprietary, or safeguards information so that it can be placed in the PDR without

redaction.

ll15 NI!!!)Hil,Il11Elll

9709090100 970904

PDR

ADOCK 05000298

G

PDR

, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

---

_ -- .

.

.

l

.

l

l

.

Nebraska Public Power District

2

l

l

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

/

l

l

TI' mas Pf&

<*1

ses

'

t

yn , Director

l

t

/

, Division of Reactor Projects

l

Docket No.: 50 298

License No.: DPR-46

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50 298/97 07

cc w/ enclosures:

John R. McPhail, General Counsel

Nebraska Public Power District

P.O. Box 499

Columbus, Nebraska 68602 0499

P. D. Graham, Vice President of

Nuclear Energy

Nebraska Public Power District

P.O. Box 98

Brownville, Nebraska 68321

B. L. Houston, Nuclear Licensing

and Safety Manager

Nebraska Public Power District

P.O. Box 98

Brownville, Nebraska 68321

Dr. William D. Leech

MidAmerican Energy

907 Walnut Street

P.O. Box 657

Des Moines, Iowa 50303-0657

r

__

. _ - - _ _ _ _ - - _ _ _ - - _ _ - _ _ _ _ - - - - -

1 .

l

l

Nebraska Public Power District

3-

l

l

Mr. Ron Stoddard

1.incoln Electric System

11th and O Streets

1.incoln, Nebraska 68508

Randolph Wood, Director

Nebraska Department of Environmental

Quality

P.O. Box 98922

Lincoln, Nebraska 68509 8922

l

'

Chairman

Nemaha County Board of Commissioners

Nomaha County Courthouse

1824 N Street

Auburn, Nebraska 68305

>

Cheryl Rogers, LLRW Program Manager

linvironmental Protection Section

Nebraska Department of Health

101 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska 68509 5007

Dr. Mark B. Horton, M.S.P.H.

Director

Nebraska Department of Health

P.O. Box 950070

Lincoln, Nebraska 68509 5007

R. A. Kucera, Department Director

of Intergovernmental Cooperation

Department of Natural Resources

P.O. Box 176

Jefferson City, Missouri 65102

.

.

Kansas Radiation Control Program Director

.

.

..

.

.

.

. ..

.

.

_

..

..

. ..

.

>

_ _ - _ _ _ _ _ _ _

.

l

'

I

Nebraska Public Power District

4

SEP - 41997

E Mail report to T. Frye (TJF)

E-mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

E Mail report to Richard Correia (RPC)

E Mail report to Frank Talbot (FXT)

]

bec to DCD (IE01)

bec dist.o. by RIV:

-Regional Administrator

Resident inspector

DRP Director

DRS PSB

Branch Chief (DRP/C)

MIS System

Branch Chief (DRP/TSS)

RIV File

Project Engineer (DRP/C)

I

-1

.

DOCUMENT NAME: R:\\_CNS\\CN707RP.MHM

To receive copy or document, indicate in box: "C" = Copy wthout enclosures "E" = Copy wth enclosures "N" a No copy

RIV:p)l,

DRS:EB

PE:DRP/C

C:DRP6

D:DRP

,

MHW~

LJSmith c6

CSMarschallSN EECoffihV -

TPGwynr .u llI)

Bf /S N

8/19/9 7

(/L/97

g/1/97

(/y /97

j

9

7-

OFFIClAL RECORD col'Y

"

_

. _ _ _

_ _ _ _ _ ___-__--__ - __ - -

- - - - - - -

--

i

t.

9

.

Nebraska Public Power District

4-

SEP - 4 1997

E-Mail report to T. Frye (TJF)

l

E mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

l

E Mail report to Document Control Desk (DDCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Adtninistrator

Resident inspector

DRP Director

DRS PSB

Branch Chief (DRP/C)

MIS System

Branch Chief (DRP/TSS)

P!V Filo

Project Engineer (DRP/C)

DOCUMENT NAME: R:\\_CNS\\CN707RP.MHM

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy

l RIV:pl}l

DRS:EB

l

PE:DRP/C

C:DRP/C,

D:DRP

,,

MHM'ifik'rr

LJSmith v%

CSMarschall(d'l EECofhhP

TPGwynr ,a gl')

Bf !97Q

8/2't/97

q/L/97

g/jL/97

qlq /97

j

3

' ' '

OFFICI L RECORD COPY

v

6

3 n .s, 9 g

s

.

.s

.

-

. . . . . - . . . . . . . . . . . . , , . . . , _ . , _ , , .