L May 11, 1998 Mr. Oliver D. Kingsley, President >
i Nuclear Generation Group Commonwealth Edison Company Executive Towers West 111 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
CORRECTIONS TO THERMAL LIMITS BASES
Dear Mr. Kingsley:
l On September 4,1997, Commonwealth Edison Company (Comed) submitted a letter informing the NRC that Technical Specifications (TS) Bases sections 3/4.2.1 and 3/4.2.3 need to be
. revised to correct an editorial error in a reference number. On October 29,1996, the NRC i
issued amendment numbers 116 and 101 to the TS for LaSalle, Units 1 and 2. These amendments changed various sections of the TS to reflect the transition of fuel supplier from j
General Electric to Siemens Power Corporation and included the correct reference in Bases sections 3/4.2.1 and 3/4.2.3. Amendment 101 for Unit 2 will be implemented prior to restart from
. the current LaSalle, Unit 2 outage and will correct the problem. However, amendment 116 for LaSalle, Unit 1 will not be implemented until the next refueling outage for that unit. Therefore, _
j the staff approves the implementation of the change to the Bases sections discussed above and i
reflected on the revised Bases pages submitted with the September 4,1997, letter, prior to implementation of the remainder of amendment 116.
Sincerely, l
ORIG. SIGNED BY S.RICHARDS i
forDonna M. Skay, Project Manager l
Project Directorate 111-2 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50-373, 50-374 cc w/ encl: See next page L
Distribution:
Docket File - PUBLIC PDill 2 r/f E. Adensam, EGA1 S. Richards l
- C. Moore.
D. Skay.
OGC,015818 ACRS, T2E26 D. Hills, Rlli L
l l
DOCUMENT NAME: G:\\CMNTSP\\LASALLE\\l.ACORREC.LTR
' To r:ctive a copy of this document. Indicate in the boa:
- C* = Copy without enclosures *E* = Copy with enclosures "N* = No copy OFFICE PM:PDill-2 4
LA:PDlll-2 D:PDill-2 lQ NAME whl WJ CMOORE C/7114r SRICHARDS W DATE 04/d /98 07/ r/ - /98 -
W ' il /98 OFFICIAL RECORD COPY
[
D m -._
s
' @Mf 9905190398 990511 PDR ADOCK 05000373 F
r se
,a ptLEQ 6
UNITED STATES y
g j
NUCLEAR REGULATORY COMMISSION
%,..... /g WASHINGTON, D.C. 2006dH1001 o
May 11, 1998 l
Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 500 Downers Grove,IL 60515 l
SUBJECT:
CORRECTIONS TO THERMAL LIMITS BASES l
l
Dear Mr. Kingsley:
On September 4,1997, Commonwealth Edison Company (Comed) submitted a letter informing the NRC that Technical Specifications (TS) Bases sections 3/4.2.1 and 3/4.2.3 need to be revised to correct an editorial error in a reference number. On October 29,1996, the NRC issued amendment numbers 116 and 101 to the TS for LaSalle, Units 1 and 2. These amendments changed various sections of the TS to reflect the transition of fuel supplier from General Electric to Siemens Power Corporation and included the correct reference in Bases sections 3/4.2.1 and 3/4.2.3. Amendment 101 for Unit 2 will be implemented prior to restart from the current LaSalle, Unit 2 outage and will correct the problem. However, amendment 116 for LaSalle, Unit 1 will not be implemented until the next refueling outage for th.at unit. Therefore, the staff approves the implementation of the change to the Bases sections discussed above and reflected on the revised Bases pages submitted with the September 4,1997, letter, prior to implementation of the remainder of amendment 116.
Sincerely, GP 6:E-Donna M. Skay, Project Manager Project Directorate lil-2 j
Division of Reactor Projects -Ill/IV Office of Nuclear Reactor Regulation Docket Nos. 50-373, 50-374 cc w/ encl: See next page
O. Kingsley LaSalle County Station Commonwealth Edison Company Units 1 and 2 cc:
J Phillip P. Steptoe, Esquire Michael I. Miller, Esquire Sidley and Austin Sidley and Austin One First National Plaza One First National Plaza Chicago, Illinois 60603 Chicago, Illinois 60603 Assistant Attomey General Document Control Desk Licensing 100 W. Randolph St. Suite 12 Commonwealth Edison Company Chicago, Illinois 60601 1400 Opus Place, Suite 400 Downers Grove, Illinois 60515 U.S. NRC-LaSalle Resident inspectors Ofke 2605 N. 21st Road Commonwealth Edison Company Marseilles, Illinois 61341-9756 Site Vice President - LaSalle 2601 N. 21st Road Chairman Marseilles, Illinois 61341-9757 LaSalle County Board of Supervisors LaSalle County Courthouse Mr. David Helwig Ottawa, Illinois 61350 Senior Vice President Commonwealth Edison Company Attomey General Executive Towers West lil 500 S. Second Street 1400 Opus Place, Suite 900 Springfield, Illinois 62701 Downers Grove, IL 60515 Chairman Mr. Gene H. Stanley lilinois Commerce Commission PWR's Vice President 527 E. Capitol Avenue, Leland Building Commonwealth Edison Company Springfield, Illinois 62706 Executive Towers West lli 1400 Opus Place, Suite 900 lilinois Department of Nuclear Safety Downers Grove, IL 60515 Office of Nuclear Facility Safety 1035 Outer Park Drive Mr. Steve Perry Springfield, Illinois 62704 BWR's Vice President Commonwealth Edison Company Regional Administrator Executive Towers West lil U.S. NRC, Region lli 1400 Opus Place, Suite 900 801 Warrenville Road Downers Grove, IL 60515 Lisle, Illinois 60532-4051 Mr. Dennis Farrar Commonwealth Edison Company Regulatory Services Manager LaSalle Station Manager Commonwealth Edison Company 2601 N. 21st Road Executive Towers West lll Marseilles, Illinois 61341-9757 1400 Opus Place, Suite 500 Downers Grove, IL 60515 Robert Cushing, Chief, Public Utilities Division Illinois Attomey General's Office 100 W. Randolph Street Chicago, Illinois 60601
~
i O. Kingsley LaSalle County Station Commonwealth Edison Company Units 1 and 2 Ms. Irene Johnson, Licensing Director Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West lil 1400 Opus Place, Suite 500 Downers Grove,IL 60515 Commonwealth Edison Company Reg. Assurance Supervisor-LaSalle 2601 N. 21st Road Marseilles, Illinois 61341-9757 Mr. Michael J. Wallace Senior Vice President Commonwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 900 Downers Grove,IL 60515
.