ML20216B624

From kanterella
Jump to navigation Jump to search
Forwards List of Rept Numbers,Related Employee Concerns & Previous Submittal Dates for Employee Concerns Task Group Repts & Three Revised Final Element Repts Addressing QA & Const Elements
ML20216B624
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/22/1987
From: Martin M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20216B630 List:
References
NUDOCS 8706300115
Download: ML20216B624 (8)


Text

L>

p a

B t

u v.

X

. TENNESSEE LVALLEY AUTHORITY -

WAttsBa[NuclearPlant.-

P. O. Box 800 Spring City, Tennessee 37381 June 22, 1987 U.S.". Nuclear Regulatory Commission Attn:' Document Control Desk

Washington, DC 20555-Gentlemen:

In the Matter lof the' Application;ofi

)-

. Docket Nos.

50-327:

Tennessee Valley Authority-

)

50-328 EMPLOYEE CONCERNS. TASK GROUP (ECTG) provides a' listing.of the report numbers,.the related employee' l

concerns, Land the previous submittal dates if applicable;. To' assist you in

your review of'these reports, Enclosure 2 provides.a'. comparison:between the 3

ECTG Writer's.Gufde' recommended report' format and'the transmitted' reports.'

,j Enclosure'3 transmits the revised final element reports for.3' elements addressing Sequoyah Nuclear Plant. employee concerns in the following l

categories:,,

f Construction :

1-report

~

Quality Assurance - 2 reports 1

As indicated by'the report c'over sheets, these reports have completed final review by the. Senior Review Panel;and the. Employee Concern Task Group.

management.

1 Please.. telephone Martha Martin at (615) 365-3587 (Watts Bar). if: you. have any-ll questions, q

Very truly yours',

TENNESSEE ALLEY AUTHORITp.'

.j

.p

'M. S. Martin:

'I

-Watts Bar Nuclear Plant ECTG Licensing 1 Manager:

cc:(See page 2.):

y;

t V O

B706300115 870622-O, P.

.l

.PDR ADOCK 05000327 F W

-i P

PDR.

["

4'

^

1An Equal Opportunity Employer o

= x v. wam i

W l2ll.

l

U.S. : Nuclear Regulatory,Cosunission r

..q cc (Enclosures)..

j

~rir. G.::G. Zech, Assistant Director-

'L_

Regional: Inspections,.

1

.j ll

. Division of:TVA Projects Office of Special Projects 1

U.S. Nuclear' Regulatory Consnission

]

Region.II..

101 Marietta Street', NW, Suite 2900

=

. Atlanta, Georgia,,30323,

' Mr. John' A. Zwolinski,' Assistant Director..

. For ' Proj ects '-

Division of'TVA. Projects.

Office of.Special Projects.

U.S. Nulcear. Regulatory. Cosunission 4350 East. West Highway EW 322

.Bethesda, Maryland 20018~

Sequoyah Resident-Inspector Sequoyah Nuclear Plant-1

'2600.Igou Ferry Road Soddy-Daisy,-Tennessee 37379-I i

.o l

]

)

.i 1

ll

.)

J

/.

~

l

.q i

.f I

s.

1 l

f 1

1 I

j l

i I

ENCLOSURE 1

h

.D, Page 1 of 2

.SEQUOYAH EMPLOYEE

' ELEMENT REPORT

-CONCERN' NUMBER'

-1SSUE

' Construction 10900 EX-85-076-003' Cable (Revised Final)

EX-85-086-001 IN-85-213-001 IN-85-255-001 IN-85-295-003 IN-85-325-005 IN-85-433-002 IN-85-436-004-IN-85-581-001

'l IN-85-733-001'

.IN-85-856-005 IN-85-935-001 IN-85-978-001 IN-86-028-001 IN-86-199-001' IN-86-201-001.

IN-86-259-001-

  • IN-86-259-004' IN-86-262-003-XX-85-008-001.

XX-85-094-004

[

EX-85-157-002-1 IN-86-266-006-

]

WI-85-100-013'

{

MAS-85-003

']

JLH-86-002 00-85-005-014 IN-86-259-005-4 IN-86-268-002 OW-85-007-004 IN-85-009-001.

l

.IN-85-120-001-IN-85-018-004' XX-85-094-005 IN-85-300-002.

l IN-86-268-003

  • IN-86-314-005
  • I-85-101-WBN, j
  • PH-85-003-N32-
    • IN-85-506-002-

-t

  • Concerns added after 9/26/86.
    • Concern deleted after 9/26/86.

i NOTE: C010900 was submitted final 1/29/87.

It is being revised to incorporate 1

revised CAP.

i

,k i

r i

W

K:

~

^

ENCLOSURE 11 r

n Lii..

Page 2 of
2 s

lSEQUOYAHL EMPLOYEE ELEMENT. REPORT' CONCERN NUMBERL l ISSUE.

[QudlityAssurance80102 IN-86-087-002 Quality Assurance.

'(Revised' Final)-

WBM-86-004-001

~ Independence and Authority.

PH-85-056-X02 WI-85-090-001

~WI-85-086-001 LWI-85-086-004

.XX-85-118-001 KK-85-119-001?

KX-85-113-001" WI-85-090-002 WI-85-086-003~

~IN-85-767-005 XX-85-116-011 NOTE: QA80102-was submitted finalL3/19/87..This report was revised to

-incorporate'NRC comments.

Quality AssuranceL80504.

LIN-85-91-001' Quality Assurance' Records-(Revised Final)'

  • IN-85-357-001 IN-85-612-X07 JLH-86-001 SQM-86kOO2-001 SQM-86-002-005' SQM-86-002-006

,SQM-86-003-002 SQM-86-009-X04 SQM-86-011-002 SQP-86-002-001 WBP-86-009-001-XX-85-088-X04' XX-85-122-042-

    • KK-85-053-001-
  • Concern added after 9/26/87.
    • Concern addressed in'C0 11106.

Note: -QA 80504 was' submitted final 5/26/87. This report wastrevised to incorporate NRC comments, b~

I l'

I 4

a.

t 8

t.

3 u

)

l'

- 1 i

- l l

l I

i 1

1 i

1 I

N s

CONSTRUCTION CATEGORY. Enclosuro 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue I.

Introduction Characterization II.

Summary of Perceived Problem s

d i

2.0

. Summary IV.

Summary of Findings

]

Conclusions (Portion)

3. 0' Evaluators Cover. Sheet Information

)

i i

4.0 Evaluation

.III.

Evaluation Process Methodology i

j

5.0 Findings

IV.

Summary of. Findings 1

6.0 Root Cause V.

Root'Cause

    • Overall Root Cause will (Collective Significance)**

-not be considered at this report level.

i 7.0 Attachments /

VIII. Attachments List of Concerns I

Other items included VI;.' Corrective Actions in Construction Element (To be provided by Reports line orgainzations)

VII.. Generic Applicability

.i

.I i

l 1905T I

.)? ?"

'b f'f' ' '_

?

L'$,

.8

'?

1,

' I 1

i -

. -1 1

a 1

.)

-i

,,l 4

I J

1 s

2

' ']

1

- I i

1

?

T.WJ