ML20216B624
| ML20216B624 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/22/1987 |
| From: | Martin M TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20216B630 | List: |
| References | |
| NUDOCS 8706300115 | |
| Download: ML20216B624 (8) | |
Text
L>
p a
B t
u v.
X
. TENNESSEE LVALLEY AUTHORITY -
WAttsBa[NuclearPlant.-
P. O. Box 800 Spring City, Tennessee 37381 June 22, 1987 U.S.". Nuclear Regulatory Commission Attn:' Document Control Desk
- Washington, DC 20555-Gentlemen:
In the Matter lof the' Application;ofi
)-
. Docket Nos.
50-327:
Tennessee Valley Authority-
)
50-328 EMPLOYEE CONCERNS. TASK GROUP (ECTG) provides a' listing.of the report numbers,.the related employee' l
concerns, Land the previous submittal dates if applicable;. To' assist you in
- your review of'these reports, Enclosure 2 provides.a'. comparison:between the 3
ECTG Writer's.Gufde' recommended report' format and'the transmitted' reports.'
,j Enclosure'3 transmits the revised final element reports for.3' elements addressing Sequoyah Nuclear Plant. employee concerns in the following l
categories:,,
f Construction :
1-report
~
Quality Assurance - 2 reports 1
As indicated by'the report c'over sheets, these reports have completed final review by the. Senior Review Panel;and the. Employee Concern Task Group.
management.
1 Please.. telephone Martha Martin at (615) 365-3587 (Watts Bar). if: you. have any-ll questions, q
Very truly yours',
TENNESSEE ALLEY AUTHORITp.'
.j
.p
'M. S. Martin:
'I
-Watts Bar Nuclear Plant ECTG Licensing 1 Manager:
cc:(See page 2.):
y;
- t V O
B706300115 870622-O, P.
.l
.PDR ADOCK 05000327 F W
-i P
PDR.
["
4'
^
1An Equal Opportunity Employer o
- = x v. wam i
W l2ll.
l
- U.S. : Nuclear Regulatory,Cosunission r
..q cc (Enclosures)..
j
~rir. G.::G. Zech, Assistant Director-
'L_
Regional: Inspections,.
1
.j ll
. Division of:TVA Projects Office of Special Projects 1
U.S. Nuclear' Regulatory Consnission
]
Region.II..
- 101 Marietta Street', NW, Suite 2900
=
. Atlanta, Georgia,,30323,
' Mr. John' A. Zwolinski,' Assistant Director..
. For ' Proj ects '-
Division of'TVA. Projects.
Office of.Special Projects.
U.S. Nulcear. Regulatory. Cosunission 4350 East. West Highway EW 322
.Bethesda, Maryland 20018~
Sequoyah Resident-Inspector Sequoyah Nuclear Plant-1
'2600.Igou Ferry Road Soddy-Daisy,-Tennessee 37379-I i
.o l
]
)
.i 1
ll
.)
J
/.
~
l
.q i
.f I
s.
1 l
f 1
1 I
j l
i I
ENCLOSURE 1
h
.D, Page 1 of 2
.SEQUOYAH EMPLOYEE
' ELEMENT REPORT
-CONCERN' NUMBER'
-1SSUE
' Construction 10900 EX-85-076-003' Cable (Revised Final)
EX-85-086-001 IN-85-213-001 IN-85-255-001 IN-85-295-003 IN-85-325-005 IN-85-433-002 IN-85-436-004-IN-85-581-001
'l IN-85-733-001'
.IN-85-856-005 IN-85-935-001 IN-85-978-001 IN-86-028-001 IN-86-199-001' IN-86-201-001.
IN-86-259-001-
- IN-86-259-004' IN-86-262-003-XX-85-008-001.
XX-85-094-004
[
EX-85-157-002-1 IN-86-266-006-
]
WI-85-100-013'
- {
MAS-85-003
']
JLH-86-002 00-85-005-014 IN-86-259-005-4 IN-86-268-002 OW-85-007-004 IN-85-009-001.
l
.IN-85-120-001-IN-85-018-004' XX-85-094-005 IN-85-300-002.
l IN-86-268-003
- IN-86-314-005
- I-85-101-WBN, j
- PH-85-003-N32-
- IN-85-506-002-
-t
- Concerns added after 9/26/86.
- Concern deleted after 9/26/86.
i NOTE: C010900 was submitted final 1/29/87.
It is being revised to incorporate 1
revised CAP.
i
,k i
r i
W
K:
~
^
ENCLOSURE 11 r
n Lii..
- Page 2 of
- 2 s
lSEQUOYAHL EMPLOYEE ELEMENT. REPORT' CONCERN NUMBERL l ISSUE.
[QudlityAssurance80102 IN-86-087-002 Quality Assurance.
'(Revised' Final)-
WBM-86-004-001
~ Independence and Authority.
PH-85-056-X02 WI-85-090-001
~WI-85-086-001 LWI-85-086-004
.XX-85-118-001 KK-85-119-001?
KX-85-113-001" WI-85-090-002 WI-85-086-003~
~IN-85-767-005 XX-85-116-011 NOTE: QA80102-was submitted finalL3/19/87..This report was revised to
-incorporate'NRC comments.
Quality AssuranceL80504.
LIN-85-91-001' Quality Assurance' Records-(Revised Final)'
- IN-85-357-001 IN-85-612-X07 JLH-86-001 SQM-86kOO2-001 SQM-86-002-005' SQM-86-002-006
,SQM-86-003-002 SQM-86-009-X04 SQM-86-011-002 SQP-86-002-001 WBP-86-009-001-XX-85-088-X04' XX-85-122-042-
- KK-85-053-001-
- Concern added after 9/26/87.
- Concern addressed in'C0 11106.
Note: -QA 80504 was' submitted final 5/26/87. This report wastrevised to incorporate NRC comments, b~
I l'
I 4
a.
t 8
t.
3 u
)
l'
- 1 i
- l l
l I
i 1
1 i
1 I
N s
CONSTRUCTION CATEGORY. Enclosuro 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue I.
Introduction Characterization II.
Summary of Perceived Problem s
d i
2.0
. Summary IV.
Summary of Findings
]
Conclusions (Portion)
- 3. 0' Evaluators Cover. Sheet Information
)
i i
4.0 Evaluation
.III.
Evaluation Process Methodology i
j
5.0 Findings
IV.
Summary of. Findings 1
6.0 Root Cause V.
Root'Cause
- Overall Root Cause will (Collective Significance)**
-not be considered at this report level.
i 7.0 Attachments /
VIII. Attachments List of Concerns I
Other items included VI;.' Corrective Actions in Construction Element (To be provided by Reports line orgainzations)
VII.. Generic Applicability
.i
.I i
l 1905T I
.)? ?"
'b f'f' ' '_
?
L'$,
.8
'?
1,
' I 1
i -
. -1 1
a 1
.)
-i
,,l 4
I J
1 s
2
- ' ']
1
- I i
1
?
T.WJ