ML20216B610

From kanterella
Jump to navigation Jump to search

Forwards Amend 4 to Coc 7002,granting Special Authorizations & Exemptions in Chapter 1,Section 1.8 of Sar,Rev 5
ML20216B610
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 08/29/1997
From: Paperiello C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
Shared Package
ML20216B614 List:
References
TAC-L32029, NUDOCS 9709080111
Download: ML20216B610 (2)


Text

!

August 29, 1997 l'

Mr. James H. Miller Vice President, Production U. S. Enrichn: ant Corporation 2 Democracy Center 6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

CERTIFICATE AMENDMENT REQUEST PORTSMOUTH GASEOUS DIFFUSION PLANT BUILDING X 705 AIR GAP DESIGN FEATURE SURVEILLANCE REQUIREMENT WORD CHANGE (TAC NO. L32029)

Dear Mr. Miller:

In accordance with your application dated April 28,1997, and pursuant to Part 76 to Title 10 of the Code of Federal Regulations, Certificate of Compliance GDP 2 is hereby amended by replacing the word " pressure" with "prosence" in Surveillance Requirement 2.6.4.2.1 of Technical Safety Requirement 2.6.4.2 entitled " Air Gaps." Accordingly, Condition 9 has been revised to include the date of April 28,1997.

All other conditions of this certificate shall remain the same.

Enclosed is a copy of the revised Certificate of Compliance.

Sincerely, Original signed by W.F.Kane for:

Carl J. Paperiello, Director Office of Nuclear Material Safety g

and Safeguards O)

Docket 70 7002 Certificate GDP-2 i

Amendment 04 1

Enclosure:

Certificate of Compliance GDP 2 Mr. Date llen PO TS kbb Mr. Robert Woolley, USEC DISTRIBUTION: (Control No.100$)

Doctet 70 7002 i NRC Fee Co, Wet. ; PUBUC Ko'Brien, Rill NMSS oir off. tM CCom, Rlli NMSs td rCSS tM WSchwink, FCoB MHorn Twenck SPB r#

OGC PHdand. Alli oHartland, RIH GAAIRGLTR3.YHF crnoo,to, Avoust 27. t es?.O g,,.t p g o, e ge, eo,q g,,,,yp OFC frSPB

  • SPB iSPB
  1. SPB
  1. FCSS NMSJ f NAME YFatat:lj

- DHoadley DMartin RPierson ETenEyck-ko DATE 8/1o/97 8/20/97 8/26/97 8/26/97 8/27/97

[//f/97

/ /97 C = C 3VER E = COVER & ENGLO5URE N = ido COPY OFFICIAL. RECORD COPY 9709080111 970829 PDR ADOCK 07007002 C

PDR

Mr. James H. Miller Vic'e President, Production U. S. Enrichment Corporation 2 Democracy Center 6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

CERTIFICATE AMENDMENT REQUEST PORTSMOUTH GASEOUS DIFFUSION PLANT BUILDING X.705 AIR GAP DESIGN FEATURE SURVEILLANCE REQUIREMENT WORD CHANGE (TAC NO. L32029)

Dear Mr. Miller:

In accordance with your application dated April 28,1997, and pursuant to Part 70 to Title 10 of the Code' of Federal Regulations, Certificate of Compliance GDP 2 is hereby amended by replacing thd word " pressure" with " presence" in Surveillance Requirement 2.6.4.2.1 of

- Technical SafetkRequirement 2.6.4.2 entitled "Alr Gaps." Accordingly, Condition 9 has been revised to i lude the date of April 20,1997.

All other conditions f this certificate shall remain the same.

Enclosed is a copy of t) e revised Certificate of Compliance.

Sincerely, Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Docket 70 7002 Certificate GDP 2 Amendment 04

Enclosure:

Certificate of Compliance G P 2 cc:

Mr. Randall DeVault, DOE Mr. Dale Allen, PORTS Mr. Robert Woolley, USEC DISTRIBUTION: (Control No.100S)

Docket 70 7002 NRC Fde Center PUBLIC KO'Brien, til NMSS Dir. Off r/f CCox. Rill NMSS r/f FCSS r/f WSchwink. FCO MHorn TWenck SPB r/f OGC PHiland, Rlli DHartland, Rill G:\\AIRGLTR3.YHF F % z. -P'4 i Nc Cc x OFC SPB 6

SPB M",

SPB A

/jI SPg,\\ 6 FCSf NMSS f

NAME YFaraz:ijN< 0 oadley h

in

((hrkn EThEyck CPaperiello DATE 7 //e/97 I/8'/97

[ /h/97

[/[/97 \\ ((/97

/ /97

/ /97 C = C JVER E = COVER & ENGLD5URE N=1 COPY OFFICIAL RECORD COPY j