ML20216B274
| ML20216B274 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/06/1998 |
| From: | Terry C, Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20216B279 | List: |
| References | |
| TXX-98129, NUDOCS 9805180017 | |
| Download: ML20216B274 (5) | |
Text
i
- "1::::
L""" 7 Log # TXX 98129 File # 10010.1 Ref. # 10CFR50.55a(f)
TUELECTRIC May 6, 1998
- c. t.c.wrry Senior Mee P esident
& Frincipal bhtclear ofwer
{
U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 UNIT 1/ UNIT 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES, REVISION 13 (1989 EDITION OF ASME CODE, SECTION XI, NO ADDENDA:
UNIT 1 INTERVAL DATES:
AUGUST 13, 1990 - AUGUST 2, 2003, FIRST INTERVAL:
i UNIT 2 INTERVAL DATES:
AUGUST 3, 1993 AUGUST 2, 2003, FIRST INTERVAL)
Gentlemen:
Enclosed is Revision 13 to the Comanche Peak Steam Electric Station (CPSES)
Units 1 and 2 Inservice Testing Plan (IST) for Pumps and Valves in the first interval. The Plan is a combined Unit 1/ Unit 2 Plan, implementing the same requirements from the ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition of Section XI (No Addenda) on Units 1 and 2.
The effective date of this revision was April 24, 1998 at 11:00 PM CDT.
The Attachment provides a detailed description of the changes made by Revision 13 to the Plan in a format identical to that provided for changes to the Final Safety Analysis Report (FSAR). All changes described in the attachment have been evaluated for relative significance (i.e., the group number 1, 2, 3 or 4 corresponds to each change justification as discussed in TU Electric letter TXX 88467 dated June 1,1983).
In addition, all changes applicable to CPSES Units 1 and 2 have been reviewed under the TU Electric 10CFR50.59 process and found not to include any "unreviewed safety questions."
This transmittal does not contain a request for relief from ASME Code Requirements and is provided to update your manual.
This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
T
!\\
9805180017 980506 PDR ADOCK 05000445 P
PDRf 4
COMANCHE PEAK STEAM ELECTRIC STATION P.O. Box 1002 Glen Rose, Texas 76043 1002
,,p
. ) U V is 9
TXX 98129 Page 2 of 2 If you have any questions, please call Mr. Carl Corbin at (254) 897 0121.
Sincerely, C. Lance Terry By:
D. R. Woodlan censing Manager CBC/cbc Attachment Enclosure c-Mr. E. W. Herschoff Region IV..
Mr. J. I. Tapia, Revion IV Mr. T. J. Polich. NRR Resident Inspectors, CPSES Mr. G. 9ynog, TDLR (clo)
Mr. J. v. Hair, Authorized Nuclear Inservice Inspector
- Attachment to TXX-98129 CPSES -INSERVICE TEST PROGRAM REVISION. 13 DETAILED DESCRIPTION Prefix Page Page 1 (as amended)
Group Description TAHl.E 8-2 Page I of 6 and Notes page Revises the type of test performed on iFW-076 and IFW-088 from a flow test to disassembly and inspection.
Revision The leakage test to verify a closed exercise has proven to be impractical due to the insufficient amount of test makeup water available. The approximately 50 gpm available is insufficient to consistently shut the check valves with sufficient force to make them leak tight as required to demonstrate closure. In lieu of flow testing, the ASME Code (OM-1987 Part 10 article 4.3.2.4(c)) and NRC guidance in GL 89-04 endorse the disassembly and inspection of the valves.
Change Request Number IT 4. O Related SER : 3.9.6 SSER 26 App R SER/SSER Impact N
i
68 9
9 i
ENCLOSURE TO TXX-98129 i
J I
COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERVICE TESTING PLAN (IST)
INSTRUCTION SHEET (Page 1 of 1)
The following' instructional information and checklist is being furnished to help insert Revision 13 into the Comanche Peak Steam Electric Station IST.
Discard the old sheets and insert the new sheets, as listed below.
Remove Insert Cover Sheet Cover Sheet 1
\\
Table 8 Feedwater Page 1 Dage 1 Notes intes l
Effective Paae Listina Pages 1 5 Pages 1 5 NOTE: Please complete the entry for insertion of Revision 13 on the " Record of.
Changes" form located at the beginning of the IST Plan, i