ML20215N822

From kanterella
Jump to navigation Jump to search
Requests That Employees Who Attended Meetings Listed in 860910 Response to Congressman Markey Request for Info Re Emergency Planning Issues at Plant,Provide Notes of Meetings to Markey Subcommittee
ML20215N822
Person / Time
Site: Seabrook  
Issue date: 11/04/1986
From: Doolittle E
Office of Nuclear Reactor Regulation
To: Bernero R, Noonan V, Novak T
NRC
References
NUDOCS 8611070310
Download: ML20215N822 (6)


Text

..

04 NOV 1986 l

MEMORANDUM FOR:

Those on the Attached I.ist FROM:-

Elizabeth I.. Doolittle, Pro. ject Manager PWR Pro. ject Directorate No. 5

. Division of PWR I.icensing-A

SUBJECT:

MARKEY SUBCOMMITTEE REQUEST FOR NOTES OF SEABROOK MEETINGS (YEl.l.0W TICKET NO 2265)

,.of NRC's September 10, 1986 response to' Congressman Markey concerning emergency planning issues at Seabrook lists a number of meetings in which NRC, employees participated. Mr. Phil Greenberg, staff aid to the Markey Subcommittee, has requested that each NRC participant at these meetings be polled to determine whether he or she took notes. Mr. Greenberg further requests that all available notes be provided to the Subcommittee pursuant to Congressr.'an Markey's original request.

Therefore, please indicate in the space provided below whether or not you have

' notes from those meetings listed in Enclosure 4 which you attended, and also indicate whether or not you are willing to provide these notes to the Subcommittee.

If your answer to both of these questions as yes, then please 1

return this information and a copy of your notes to me by COB, Friday November 7, 1986.

Name:

Do you have notes?

Will you provide notes M,

. Elizabeth I.

Doolittle, Pro. ject Manager PWR Pro. ject Directorate No. 5 Division of PWR I.icensing-A

Enclosure:

- As stated Distribution:

og i

-NRC PDR (PDR.

4 PD#5 Rdg. Files E. Doolittle PM; #

Ek611ttle:js 11/ d /86 i

i 0FFICIAI. RECORD COPY 4

B611070310 861104 i

PDR ADOCK 05000443 P

PDR e

-,..n.,

.,-,.,,,v.

,w

,c,,-

- - - - -.. ~n-

E849

['

]4

.v UNITED STATES NUCLEAR REGULATORY COMMISSION y

WASHINGTON, D. C. 20555

%,,,,,+

0 4 NOV EB6 MEMORANDUM FOR:

Those on the Attached list FROM:

Elizabeth I., Doolittle, Pro.iect Manager PWR Pro.iect Directorate No. 5 Division of PWR I.icensing-A

SUBJECT:

MARKEY SUBCOMMITTEE RE0 VEST FOR NOTES OF SEABROOK MEETINGS (YEl.l0W TICKET N0. 2265)

. of NRC's September 10, 1986 response to Congressman Markey concerning emergency plannino issues at Seabrook lists a number of meetings in which NRC employees participated. Mr. Phil Greenberg, staff aid to the Markey Subcommittee, has requested that each NRC participant at these meetings be polled to determine whether he or she took notes. Mr. Greenberg further requests that all available notes be provided to the Subcomittee pursuant to Conoressman Markey's original request.

Therefore, please indicate in the space provided below whether or not you have notes from those meetings listed in Enclosure 4 which you attended, and also indicate whether or not you are willing to provide these notes'to the Subcomittee.

If your answer to both of these questions as yes, then please return this information and a copy of your r.otes to me by COB, Friday November 7, 1986.

(

L Elizabeth >l.

Doolittle, Pro. ject Manager PWR Pro. ject Directorate No. 5 Division of PWR I.icensing-A Name:

Do you have notes?

Will you provide notes

Enclosure:

As stated

-r

+

Dittriktion:

L*"

V5tella o* a'4 JRoe 9

4

/.

UNITED STATES JSnieZekI TRehm

{

y NUCLEAR REGULATORY COMMISSION llDenton, IE o

wAsumaron, o. c.nossa TMurley, RI

/

JTaylor JPartlow.

September 10, 1986 EJordan cmmMAN DMatthews Titovak EDO 2079 FKantor EDoolittle,;iRR DCS The Honorable Edward J. Markey, Chairman Subcomittee on Energy Conservation and Pnwer Comittee on Energy and Comerce United States House of Representatives Washington, D.C.

20515

Dear Mr. Chairman:

Thit is in response to your August 28, 1986 letter in which you requested information on meetings and discussions between various parties as well as documents related to the possibility of reducing the size of the emergency planning zone (EPZ) for the Seabrook nuclear power plant.

documents related to the Baltimore Gas & Electric Company's NovemberYou also req 18, 1935 application to reduce the size of the emergency planning zone for the Calvert Cliffs nuclear power plant,_.. __

The following enclosures are provided related to the' Seabrook EPZ issue:

1) a chronology of meetings and discussions with the utility and other groups,

'>) n chrnnology of internal meetings. 3) a list of public documents, and 4) a list of internal documents.

A list of documents regarding the Calvert Cliffs application is provided in Enclosure 5.

Copies of the listed documents are also enclosed.

l As indicated in the July 29, 1986 letter from Public Service of New Hampshire, the applicant has requested the NRC to perform a technical review of the Seabrook. Station Probabilistic Safety Assessment Update. Depending on the results of the technical review, the applicant may request a change tn the i

emergency plan process for Seabrook but has not specified to this time what future action may be requested. Regarding the Calvert Cliffs request for an i

exemption to the requirement for an EPZ of generally 10 miles in radius, the NRC responded on February 14, 1986, that the request was prer.ature and that l

action on this issue was being deferred until presently ongoing studies involving the source term have become final.

The Office of Congressional Affairs will inform the Subcommittee of any future meetings between the Seabrook applicant and the sta#f when scheduled.

Originated:

IE:Kantor Tsbo97 oW g

4

-2_

We have attempted to be fully responsive to your request and if additional information is discovered. I will provide it promptly to you.

Sincerely, k

N.

Lando W. Zec J r.

Enclosures:

1.

Chronology of meetings and discussions w/ utility and other groups 2.

Chronology of internal meetings 3.

List of public documents 4.

List of internal documents 5.

List of Calvert Cliffs documents

' Rep. Carlos Moorhead cc:

e e

I I

4 4

Chronology of Meetings and Discussions with Utility and Other Groups - Seabrook

~

/

During the winter of 1985 and spring of 1986 there were two or perhaps three -

conversations between Scinto and Dignan discussing the status of issues

. relating to a number of facilities including Comanche Peak, Yankee Rowe and Seabrook. Possible request for exemption from EPZ requirement for Seabrook was discussed.

No notes, or log, were kept. There were also a few conversations during this period between Christenbury, Perlis and Dignan.

09/09/85 Telephone call between Nerses and Perlis regarding a discussion Perlis had with Dignan on the emergency plan from Massachusetts.

10/10/85 Telephone call between Ne'rses and Perlis regarding discussions between Dignan and Cunningham, Reis, Christenbury Turk, Scinto about using Seabrook PRA and new source term data to replace the EPZ.

10/11/85 Conference call between Derrickson, and Nerses Bernero to discuss feedback to the staff on Seabrook's approach to demonstrating ability to reduce the EPZ.

02/04/86 Meeting between Derrickson and Denton to discuss Seabrook.

06/?O/86 Phone call from Derrickson to Stello to discuss a number of issues reTated to Seabrook.

06/24/86 Meeting in 4ethesda between Derrickson and Stello, Thompson, Novak and Cunningham to discuss a number of issues related to Seabrook.

07/05/86 Phone call from Derrickson to Denton.

07/07/86 Phone call from Derrickson to Denton.

07/10/86 Phone call from Derrickson to Stello.

07/15/86 Phone call from Derrickson to Stello.

07/30/86 Phone calls to intervenors to notify them of 8/6/86 kickoff meeting:

Ahrens Maine Attorney General)

Curran NECN) 81sbee New Hampshire Attorney General)

Dowdy (SAPL) 07/30/86 Meeting with Gov. Sununu of New Hampshire and M. Shaw, consultant, with Stello, Cunningham, and Christenbury to discuss a number of j

issues related to Seabrook.

.. wm..

_,_,__.c,__,__

4 06/04/86 Phone call tofintervenor to notify her of 8/6/86 kickoff meeting:

Sneider (Massachusetts Attorney General) 08/06/86 Meeting in Bethesda with PSNH'and BNL for walkthrough of Seabrook Risk Management and Emergency Planning Study and Emergency Planning Sensitivity Study (meeting summary dated 9/4/86).

08/12/86 Phone call from Brad Pokorney (Boston Globe) to answer questions on purpose of study and NRC review activities.

08/13/86 Phone calls from Judy Abel (Haverhill Gazette) and David Tirrell Wysocki (Associated Press) to answer questions on purpose of study and NRC review activities.

08/14/86 Meeting at Brookhaven National Laboratory in Upton,- N.Y. with BNL, PSNH, to discuss containment strength aspects of the study (see meeting sumary).

08/--/86 Conversation between Jordan, NRC and Wilkerson, FEMA.

08/20/86 Conference call with PSNH (R. Sweeny, J. Moody), PL&G (K. Flemming, Li), BNL (A. Tingle) and NRC (Doolittle) regarding consequence analysis aspect of the study.

08/25/86 Phone calls to intervenors to notify them of 8/27/86 meeting to discuss plant model aspects-of the study.

08/27/86 Meeting in Bethesda with PSNH and BNL to discuss plant model and specifically treatment of Event V in the study (see meeting summary).

09/02/86 Phone call from Derrickson to Stello.

4 Chronology of Internal Meetings - Seabrook 07/25/86 Meeting with Bernero, Novak, Rossi Noonan, Benaroya, Crocker, Israel, Matthews, Soffer, Perlis, Doolittle to discuss infor-mation contained in study and need for review.

07/29/86 Meeting with Jordan, Novak, Rossi Doolittle, Long, Matthews, Kantor, Benaroya to discuss information contained in study and need for review.

07/30/86 Staff meeting with Novak, Rossi Doolittle, Benaroya, Crocker to discuss further actions on study.

07/31/86 Sta'ff meeting with Novak 'Rossi, Doolittle, Benaroya. Crocker Long to discuss staff resources for study review.

08[01/86 Meeting with Novak, Rossi, Benaroya, Noonan, Doolittle, Ballard, Bagchi. Long to discuss staff resources / people for ctudy review.

08/02/86 Meeting with Noonan, Novak, Rossi, Benaroya, Doolittle to discuss scope of work for BNL review assistance.

08/06/86 Meeting with Novak, Rossi, Noonan, Benaroya, Long, Pratt, i

Hofmayer Floravante to discuss scope of work for BNL review r

assistance.

08/12/86 Phone call "from Haverkamp (Region I) to inquire about who to direct press and public calls to in Headquarters.

. 08/19/86 Meeting with Noonan, Rossi, Benaroya, Doolittle regarding NRC review group members.

o 08/28/86 Discussion between Barrett and Doolittle regarding meeting held on 8/27/86.

09/02/86 Meeting with Long Bagchi, Soffer, Newberry, Doolittle, Lyon, D

Tinkler, Shapaker and Perlis to discuss details of review

~

~

7 requirements for study.

o e

s --.

G


cw_--v.--,.,-.-w---.-

-..,--w w.,

y

6 List of Public Documents - Seabrook

')

j 07/21/86 Letter from John DeVincentis to Vincent S. Noonan, Seabrook Station a

f Probabilistic Safety Assessment Update, transmitting Seismic Fragilities of Structures and Components of the Seabrook Generating Station, Units 1 & 2, Prepared by NTS Engineering Long Beach, CA* for Pickard, Lowe and Garrick, Inc., Newport Beach, CA and New Hampshire Yankee Division.

Public Service Company of New Hampshire Seabrook, NH, June 1986.

Seabrook Station Emergency Planning Sensitivity Study, Prepared by Pickard,'Lowe & Garric.5:, Inc., Newport Beach, CA for New Hampshire Yankee Division, Public Service Company of New Hampshire, Seabrook N.H., April 1986.

Seabrook Station Risk Management and Emergency Planning Study, Prepared by Pickard, Lowe & Garrick, Inc., Newport Beach, CA for New Hampshire Yankee Division, Pubite Service Company of New Hampshire, Seabrook, N.H., December 1985.

07/29/86 Letter from George S. Thomas to Vincent S. Noonan, Seabrook Station Probabilistic Safety Study update.

09/05/66 Sumary of meeting with PSNH on August 4,1986 to discuss Seabrook Emergency Planning Sensitivity Study.

09/05/86 Sumary of meeting with PSNH on August 14, 1986 to discuss Contain-ment Strength Aspect of Emergency Planning Sensitivity Study.

09/05/86 Sumary of meeting with PSNH on August 27, 1986 to discuss Plant Model Aspect of Emergency Planning Sensitivity Study.

l P

l@

f a

i

/s

r l

1 G

i List of Internal Documents - Seabrook 09/09/85 Notes on conference call with Nerses, Perlis and Dignan to discuss f

EP from Massachusetts.

10/10/85 Notes on conference call with Nerses. Perlis, Dignan, Cunningham, Reis, Christenbury, Turk, Scinto to discuss reduction of EPZ.

10/11/85 Notes of conference call with Bernero Derrickson, Nerses to discuss Seabrook approach on demonstrating ability to reduce EPZ.

07/25/86 Notes on staff meetin'g with Noonan and Doolittle.

07/25/86 Notes on meeting' with Bernero,' Novak, Rossi, Benaroya, Noonan, Crocker, Israel, Matthews, Perlis, Doolittle to discuss content of study.

07/29/86 Notes on staff meeting with Novak, Rossi, Doolittle.

i g

07/29/86 NotesonmeetingwithJordan,Doolittle,Long,Rossi,Novak,Matthews, Kantor, Benaroya, Crocker to discuss cor. tent of study.

L F

07/30/86 Notes on staff meeting with Novak, Rossi, Doolittle.

  • I 07/30/86 Notes on staff meeting with Noonan and Doolittle to discuss plans fcr

,i August 26, 1986 meeting.

08/05/86 Notes to Irepare for EDO briefing on 8/5/86.

08/06/86 Notes on meeting with T. Pratt, C. Hofmayer, Novak, Rossi, Benaroya, Doolittle, Noonan, Fioravante to discuss BNL scope of work.

08/06/86 Draft BNL Scope of Work: Review of the Emergency Planning Sensi-tivity Study for Seabrook, Project Description.

08/06/86 Draft BNL Scope of Work: Review of the Emergency Planning Sensi-tivity Study for Seabrook, Project Description.

08/06/36 Notes on meeting with PSNH to discuss contents of study. '

08/12/86 Notes on staff meeting with Novak, Rossi. Nocnan, Benaroya, 'Long,'

Doolittle to discuss BNL review and memo to go to Denton on status of review of study.

'(

l E

't 4

I

..,__._.__',_I__.__

t- ' 08/12/86 Memo for Denton from Novak, Review of EPZ Sensitivity Study for Seabrook, dated 8/12/86.

o 08/13/86 Notes on call from David Tirrell, Wysocki, to Doolittle to discuss Seabrook Study (AP).

Notes on calls from Judy Abel to Doolittle (Haverhill Gazzette).

Notes on call from J. Quinn (PSNH) to E. Doolittle to discuss views on scope of work.

Notes on call from Region I (K. Abraham) to E. Doolittle to discuss contents of study.

Notes on call from W. Der'rikson to E. Doolittle to discuss PSN3 views en scope of work.

h8/14/86 Notes on meeting held at BNL with PSNH to discuss containment aspects of the study.

08/15/86 Memo from McCreless to ACRS members dated August 15, 1986 List of

^

ACRS Subcomittee Meetings Scheduled Through January 22, 1987.

08/19/86 Draft memo from Warren C. Lyon to Carl Berlinger, Review of Seabrook Documents Pertaining to Change in Emergency Planning Zone Size.

08/20/86 -Notes on conference call with Tingle, Woodard, Fleming Sweeny, Moody, Li to discuss consequence analysis aspect of study..

08/27/86 Notes on meeting with PSNH and BNL to discuss plant model and Event V.-

aspect of study.

08/28/86 Notes on discussion with Barrett and Doolittle regarding 08/27/85 meeting.

'09/02/86 Notes on meeting with Long, Doolittle, Bagchi, Soffer, Newberry, Lyon, Tingle, Shapaker, Perlis to. discuss staff's scope of wor k.

l

Documents Concerning EPZ Reduction at Calvert Cliffs

~

Letter from A. E. Lundvall, BG8E to NRC, " Request for Exemption",

1.

18, 1985.

November Memorandum from H. R. Denton, NRR to G. H. Cunningham, EL 11, 1985.

2.

the EPZ for Calvert Cliffs", December Memorandum from D. B. Matthews, NRC to R. S. Wilkerson, FEMA, 18, 1985.

Cliffs Request for Exemption (Plume Exposure Pathway EPZ)," Dece 3.

r Letter from A. C. Thadant, NRC to Mr. Steven Aftergood, Comittee to 4.

Bridge the Gap, December 31, 1985.

Denton, NRR,."Calvert

. Memorandum from G. H. Cunningham,' ELD to H. R.

Plume

- Cliffs Nuclear Power Plant Request for Exemption from the 10-mile 5.

ExposurePathwayEPZRequirementof10CFR50.47(c)(2)andPart50 Appendix E," December 31, 1985.

Letter from W. J. Dircks, NRC to Congressman Roy Oyson, U.S.

6.

Representatives, January 3, 1986.

Memorandum from T. E. Murley, Region I to H.

7.

Letter from J. A. Tiernan, BG&E to NRC, " Request for Amendment" B.

10, 1986.~

January Memorandum from R. B. Minogue, RES to H. R. Denten, NRR, "

27, 1986.

Emergency Planning Zone for Calvert Cliffs", January 9.

Note from G. H. Cunningham, ELD to H. R. Denton, NRR, "Calv 10.

EPZ", January 27, 1986.

14, 1986.

11. -Letter from H. R. Denton, NRC to J. A. Tiernan, BG&E, February Letter from J. A. Tiernan, BG8E to NRC, " Reduction of the Emergency 12.

Planning Zone", March 27, 1986, BG&E technical memorandum, April 1,1986.

13.

h YA, Letter from H. R. Denton, NRC to Mr. Gary D. Knight, Falls Churc,

14 April 1, 1986.

Egenda and slides from BG8E/MP.C meeting, April 2, 1906.

986 15.

Paper presented at 1986 ANS Annual Meeting, Reno, Nev by J. E. Metcalf S&W, S. Mirsky and T. Cook, BG&E.

16.

~

4

,r.,---

~

u

-.,._.w-m,._

-,.,---.m

r

'e

.1 Attached Ust V. Noonan R. Bernero T. Novak

.C. Rossi V. Benaraya l'.'Crocker S. Israel D. Matthews R. Perlis E. Jordan S. I.ong F. Kantor D. Fioravante R. Barrett~

G. Bagchi 1., Soffer S. Newberry W. Lyon C. Tinkler J. Shapaker m

-.--v

,e

.--.. -. -, -, -