ML20215N820

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/86-25 on 860816-0930 & Notice of Violation
ML20215N820
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/04/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20215N821 List:
References
NUDOCS 8611070309
Download: ML20215N820 (2)


See also: IR 05000267/1986025

Text

,

.-

.

NOV

4 806

In Reply Refer To:

Docket:

50-267/86-25

Public Service Company of Colorado-

ATTN:

R. O. Williams, Vice President ~

Nuclear Operations

P. O. Box 840

Denver, Colorado

80201

Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Farrell, P. W. Michaud,

and D. D. Chamberlain of this office during the period August 16 through

September 30, 1986, of activities authorized by NRC Operating License DPR-34

for Fort-St.-Vrain Nuclear-Generating Station, and to the discussion of our

findings with Mr. J. W. Gahm and other members of your staff at the conclusion

of.the inspection.

Areas examined during the inspection included operational safety verification;

surveillances; maintenance; security; design, design changes, and modifications;

and followup of contamination incident / allegation 4-86-A-080.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations

enclosed insp.by the NRC inspectors.

The inspection findings are documented in the

ectio'n report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Cnnsequently, you are required to respond to

theseviolations,in' writing,ulesofPractice,"Part2, Title 10,Codeof

in accordance with the provisions of

,

Section 2.201 of the NRC's R

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original S!gned By

,

J. E. Gagliardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Encio y

s:

(see nex

age)

g

y

RP A

RP /A

C:RPB

ACk

'

, RIV: PB A

RPB A

.

t)dChamberlain

PJaudon

JEGagliardo

MEEmerson

EFa rell/t

icha d

p/)d86

IGM 86

to /%86

@ /86

// /y/86

n/3/86

8611070309 861104

ADOCK 050002 7

I

FDR

P-

,

i

.

,

1

Public Service Company of Colorado

-2-

s

,

s.

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-267/86-25

cc w/ enclosures:

J. W. Gahm, Manager, Nuclear

Production Division

s

,

Fort St. Vrain Nuclear Generating Station

-x

~,

16805 WCR 19 1/2

Platteville, Colorado -80651

L. Singleton, Manager, Quality

Assurance Division

(Same Address)

Colorado Radiation Control Program Director

,

bcc distrib. by RIV:

Y

  • RPB

R. D. Martin, RA

  • Resident Inspector

DRSP

  • SectionChief(RPB/A)
  • RIV File

<

  • SectionChief(RSB/ES)
  • R&SPB
  • RSTS OPERATOR
  • MIS System
  • RSB

Enforcement Officer

-

Allegations Coordinator

  • w/766

,

!

_

$

I

,

r

._ _ _ _ _ . _

. _ . . _ . . . . _ . _ . . _ _ _ _ _ _ . . _ _ .

-

.

. .

. .

-

. . .

.

.

.