Forwards Insp Repts 50-445/86-14 & 50-446/86-11 on 860601-30 & Notice of Violation.Encl Rept Also Identifies Four Unresolved Items in Paragraphs 10b,10c(3) & 10e(4)
ML20215N760
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/31/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20215N761 List:
References
NUDOCS 8611070242
Download: ML20215N760 (3)


See also: IR 05000445/1986014

Text

r

-

.

,s

q

,

,

'

'l

,

-

-

. ,

.- .

In Reply Refer To:

_

^-

Docket:

50-445/86-14

'

50-446/86-11

E 3i E

..

-

-

y

7

.-

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

" , .

~

Executive Vice President

400 North Olive Street, L.B. 81

.

' ^-

Dallas, Texas

75201

.

Gentlemen:

-

This refers to the inspection conducted by Mr. H. S. Phillips and other members

of the Region IV Comanche Peak Task Group during the period June 1-30, 1986,

of activities authorized by NRC Construction Permits CPPR-12.6 and CPPR-127 for

the Comanche Peak Steam Electric Station, Units 1 and 2 and to the respective

discussions of our findings with Messrs. J. Beck and L. Na^ce and other members

of your staff at the conclusion of the inspection.

Areas of construction examined during the inspection inclinded Unit 2 plant

status; Unit 2 general plant inspections; receipt inspections / storage; Unit 2

reactor coolant pressure boundary welding; Unit 2 mechanical components; welder

qualification; Unit 2 construction verification testing; Unit 2 preservice

inspection; a'id electrical components, conduit and supports, cable and cable

tray and support installation. Within these areas, the inspection cunsisted of

selective examination of prncedures and representative records, interviews with

personnel, and observations by the inspectors.

The inspection findings are

documented in the enclosed report.

During this inspection, it was found that certain of your activities were in

' violation of NRC requirements.

Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

i

Federal Regulations.

Your response should be based on the specifics contained

i

in the Notice of Violation enclosed with this letter.

Four unresolved items are identified in paragraphs 10b,10c'(3), and 10e(4) of

l

the enclosed inspection report.

The responses directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

l

i

l

!

!

/

-

!

RIV:SRIM

CPG

CPG st3

DRSP

N

IE

l

HSPhillips:lc PCWagner

IBarnes

EHJohnson

VS

an RLSpe sard

M /z7/86

10/gp/86

to/21/86 (6/g/86

/

6 ja /j'(/86

/o/.i /cb

Q, f U

t

i

s'd* G

rllelp

(

en eK

l0

c

l

% 2.

pse

(f'ol

,

l

8611070242 861031

l

PDR

ADOCK 05000445

p

l l

(

G

PDR

__

. _ . -

-

.

..-

e-

,.

i

Texas Utilities Generating Company

- 2 --

Should you have any questions concerning this inspection, we will be pleased to

-discuss them with you.

Sincerely,

E. H. Johnson, D'irector

Division of Reactor Safety and

Projects

Enclosures:

- 1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Construction Inspection Report

50-445/86-14

50-446/86-11

cc w/ enclosures:

Texas Utilities. Electric Company

ATTN:

G. S. Keeley, Manager,

Licensing

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas 75201.

.

Juanita Ellis -

President

CASE

-

1426 South Polk Street

Dallas, Texas

75224

Renea Hicks

Assistant Attorney General

Environmental Protection

Division

P.O. Box 12548

Austin, Texas

78711-2548

Administrative Judge Peter Bloch

U. S. Nuclear. Regulatory Commission

Washington, D. C.

20555

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

P. O. Box X, Building 3500

Oak Ridge, Tennessee 37830

r

.,

,

'\\Nl)' ' ,

q

.

s

e

a y

%!

g

,

Texas Utilities Genera +.ing Company

-3-

-

<j

->

Or. Kenneth A. McColI'm .

o

1107 West Knapp

,

, .

'

,Y Stillwater, Oklahoma 74075

'

i

<

,

Anthony.Roisman, Esq.

'

Executive Director

Trail Lawyers for Public Justice

,

2000 P. Street, N.W. Suite 611

>'

Washington, D. C.

20036

l

Texas Radiation Control Program Director

bcc: to DMB (IE01)

'

bec distrib. by RIV:

  • RPB
  • MIS System
  • RRI-0PS
  • RSTS Opeiator

,

  • RRI-CONS
  • R&SPB
  • T. F. Westerman, RIV

DRSP

  • I.

Barnes, CPTG

R. Martin, RA

3

V. Noonan, NRR

  • RSB

".

.*RIV File

.

J. Taylor, IE

,

  • D. Weiss, LFMB (AR-2015)

J. Konklin, IE

S.tTreby, ELD

  • w/766

'

.t

'

<

i

~

\\

I

1

,

-

g

'T

% %

..

-%

7

n

.

I

"%,

'

I

I

k

'f.

y

s

!

e

,

.v

I f! ~

\\

t