ML20215N088
| ML20215N088 | |
| Person / Time | |
|---|---|
| Site: | 05000000, Diablo Canyon |
| Issue date: | 12/13/1976 |
| From: | Sihweil I Office of Nuclear Reactor Regulation |
| To: | Knight J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20197J003 | List: |
| References | |
| FOIA-86-371 NUDOCS 8611040261 | |
| Download: ML20215N088 (1) | |
Text
r-J.i
)
uf
)
.) :
DEC la 1s76 pN
/
ME!*1RANDUIt FOR:
J. P. Knight, Assistant Ofrector for Engineering Division of Systems safety FRO'i:
- 1. S. Sifueil. Chief Structural Engineering Branch Division of Systems Safety
SUBJECT:
REVIEW 0F DIABLO CAtiYOf! REEVAUlATIOM (SEB:1111)
Due to the expected increase of the level of SEB activity on the subject matter, I have assigned David Jeng to be a' co-reviewer with K. Kapur.
Both Ken and Dave have been instrumental in establishing our seismic design criteria and I am confident that together they will carry the reviea to a successful conclusion.
Isa S. Sihweil, Chief Structural Engineering Brer.ch Division of Systens Safety CC:
D. P. Osche R. !!ainer:cn F. Schroeder R. DeYoung
!!. Denton t!. Gammill
- 0. Allison C. Stern K. L'apur P..kr.r DISTRIBUTION:
Central File NRR-Rdg SEB-Rdg 8611040261 861023 l
HOUCH36-371 gy DSS:SEB x27807 Il-oFne '
- ISihwei1 pf.
l
.u.N.N, l
12/10/76 i focan AEC.)l,8 dter,9-7)V AFCM 0240 W u. s. oovgRNMENT PRINTING OFFICEB1974 824-199.
A-\\%
l
-