Duxn POWER GOMPANY P.O. nox 33180 CIIARLOTTE, N.C. 28242 IIALH. TUCKER TELEPHONR (704) 373-4531 w m.mr. ament
,d6 007 30 A 9 : 4 J.
October 28, 1986 Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta St. NW, Suite 2900 Atlanta, Georgia 30323
Subject:
McGuire Nuclear Station Docket Nos. 50-369, 50-370 IE Inspection Report 50-369/86-04, 50-370/86-04 EA 86-52
Dear Dr. Grace:
)
By letter dated July 2, 1986, Duke Power responded to the violation which was identified in the subject Enforcement Action.
In this response, Duke committed to conduct a functional review of all motor operated valves and review this with all licensed personnel (by November 1,1986); to develop a Department Dire'ctive to apply to all of Duke Power's Nuclear Stations addressing the operability of a system based upon its subsystems and components (by February 1,1987); and the development of a new Technical Specification interpretation on the determination of operability (by March 1,1987). Due to several factors: the scope of the functional review has increased; the Department Directive, once developed, will require implementing directives, procedures, and training at each station; and the i
new Technical Specification interpretation is dependent on the first two items; additional time is needed to complete these actions. These actions will be completed by June 1, 1987.
If any further information is needed, please contact us through normal licensing channels.
Very truly yours, b.
Hal B. Tucker 8611040245 861028 JBD/111/jgm PDR ADOCK 0500 9