ML20215N071
| ML20215N071 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 10/30/1986 |
| From: | Hehl C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8611040243 | |
| Download: ML20215N071 (3) | |
Text
._
OCT 3 01986 Docket No. 50-454 Docket No. 50-455 Conconwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690
Dear Mr. Reed:
SUBJECT:
REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. T. Higgins, Training Supervisor and Mr. T. Reidinger, RIII Examiner, arrangerrents were made for an evaluation of the requalification program at the Byron Nuclear Power Station. The evaluation visi+ is scheduled for the week of January 26, 1987.
For this visit, the NRC examiner will administer NRC prepared written, oral, and simulator examinations. When the NRC examiner arrives at the site, he will neet with the appropriate facility personnel to review the schedule for those examinations.
For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," by T. Reidinger. Mr. T. Higgins has been advised of our refererce material requirements and where they are to be sent.
This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.
Conments on burden and duplication may be directed to the Office of Management and Budget, Reports Managerrent Room 3208, New Executive Office Building, Washington, D. C. 20503.
g1040243861030 ADOCK 05000454 V
PDR f
I
\\
/$ &
Comonwealth Edisen Company-2 OCT 3 0193S Thank you~ for your consideration in this matter.
If you have any questions on the evaluation process, please contact T. Reidinger at (312) 790-5551.
~
Sincerely, harles W. Hehl, Chief Operations Branch
Enclosure:
As stated cc w/ enclosure:
D. L. Farrar, Director of Nuclear Licensing V. I. Schlosser,. Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood Phyllis Dunton, Attorney General's Office, Envirorimental Control Division D. W. Cassel, Jr., Esq.
Dirne Chavez, DAARE/ SAFE Steve Lewis, 0GC L. 01shan, NRR LPM H. S. Taylor, Quality Assurance Division RIII RIII RII Reidinger/jlk urdick ehl h/31 k
ENCLOSURE 1 Reference Material Requirements for Requalification Program Evaluation l'.
All administrative procedures (as applicable to reactor operation or safety) 2.
All integrated plant procedures (normal or general operating procedures) j 3.
. Emergency procedures-(emergency instructions, abnormal, or special procedures) 4.
Standing orders-(important orders which are safety-related to and may supersede the regular procedures) 5.
Fuel-handling and core-loading procedures (initial core-loading procedure,whenappropriate)
~
.6.
Annunciator procedures (alarm procedures, including set. points) 7.
Radiation protection manual (radiation control manual or procedures) i 8.
9.
Technical Specifica' ions t
- 10. Lesson plans (training manuals, plant. orientation manual, systems descriptions)
- 11. Systems operating procedures
- 12. ' Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
- 13. Copies of facility R0 and SR0 requalification examinations administered during the past 2 years
- 14. An index of administrative, operating, abnormal and emergency procedures-l
- 15. ' Plant technical data (curve) book
- 16. - Simul _ator malfunction list with descriptive sunirary of~ malfunction effects.
All of the above referenced traterial should be approved, final issues and should~be so marked. Uncontrolled, preliminary, or other such issues'will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.
I i
l i
, - = -
c,m_,
_ _ - _ - - -,. ~
.m
....,,,,... ~-