Notice of Violation from Insp on 860606-0705
ML20215N044
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/28/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20215N042 List:
References
50-327-86-37, 50-328-86-37, NUDOCS 8611040204
Download: ML20215N044 (1)


Text

.-

ENCLOSURE 1 NOTICE OF VIOLATION Tennessee Valley Authority Docket Nos. 50-327 and 50-328 Sequoyah Units 1 and 2 License Nos. DPR-77 and DPR-79 i

During the Nuclear Regulatory Commission (NRC) inspection conducted on June 6, 1986 - July 5,1986, a violation of NRC requirements were identified.

The violation involved failure to adhere to established radiation protection proce-dures.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the violation is listed below:

Technical Specification 6.11 requires that procedures for personnel radia-tion protection shall be prepared consistent with the requirements of 10 CFR 20 and shall be approved, maintained and adhered to for all opera-tions involving personnel radiation exposure.

These requirements are implemented by Radiological Control Instruction RCI-1, Radiological Hygiene Program, and RCI-14, Radiation Work Permit (RWP) Program.

RCI-14 requires each individual employee to read and adhere to all requirements of the RWP and RWP timesheet associated with the area entered and the work performed.

RWP 86-0460-63 required that a hood be worn during work performed in a contamination zone on elevation 714 of the' Auxiliary Building.

Contrary to the above, the licensee failed to adhere to the requirements of RCI-14 and RWP 86-0460-63 in that an employee was observed perfcrming work in the contamination zone without a hood.

This is a Severity Level V violation (Supplement IV).

This violation applies to both units.

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and, (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

FOR THE NUCLEAR REGULATORY COMMISSION d.Nels'onGrace Regional Administrator Dated at Atlanta, Georgia this 2fA day of October 1986 8611040204 861028 PDR ADOCK 05000327 G