Notice of Violation from Insp on 860728-0811
ML20215M999
Person / Time
Site: Westinghouse
Issue date: 10/23/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20215M993 List:
References
70-1151-86-11, NUDOCS 8611040151
Download: ML20215M999 (2)


Text

(! r f'

ENCLOSURE 1 NOTICE OF VIOLATION Westinghouse. Electric' Corporation Docket.No. 70-1151 Westinghouse Fuel Facility License No. SNM-1107 During the Nuclear Regulatory Commission (NRC) inspection conducted on July 28, 1986;- August 11, 1986, a violation of NRC requirements was identified. The violation involved an inadequate procedure for instrument calibration. In-

.accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:

License Condition 2.1 of Safeguards Amendment No. SG-2 to Special Nuclear Materials License No. SNM-1107 requires the. licensee to follow Chapters 1.0 ,

through 8.0 of the current Fundamental Nuclear Material Control (FNMC) Plan.

Section 4.1.2 of_ the _ FNMC Plan states that the measurement and control of measurements of nuclear: material are detailed in written procedures _ which include calibrating chemical analysis equipment.

Section 3.4, A-7 of the FNMC Plan defines the radiometric analysis method as the measurement system for gaseous effluents- to be . released to the environment.

10 CFR _70.57(a)(8) defines calibration to mean the process of determining the numerical relationship between the observed' output of a measurement system and the value, based upon reference standards, of the characteristics being measured.

Contrary to the above, the licensee's Procedure No.. HP-01-025, Revision 0, "Tennelec LB 5100 Calibration Procedure," for the radiometric method was

~

inadequate in that it did not contain provisions. for determining counter -

efficiency.

This is a Severity Level V violation (Supplement III).

. Pursuant to .the provisions of 10 CFR 2.201, Westinghouse is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including: (1) admission or denial of the violation, (2)~ the reason for the violation if admitted, (3) the 8611040151 861023 PDR ADOCK 07001151 C PDR

[.

c.

Westinghouse Electric Corporation Docket No. 70-1151 Westinghouse Fuel Facility 2 License No. SNM-1107 corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by Roger D. Walker /for J. Nelson Grace Regional Administrator Dated at Atlanta, Georgia this 23 day of October 1986 i