ML20215M218

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1987
ML20215M218
Person / Time
Site: Cooper 
Issue date: 04/30/1987
From: Horn G, Sutton K
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CNSS878154, NUDOCS 8705130128
Download: ML20215M218 (5)


Text

n

- h.p

/p i

OPERATING DATA REPORT DOCKET NO, 050-0298 l,p, DATE 5-8-87 COMPLETED BY K.E. Sutton.

TELEPlf0NE (402)6Z5-3811 -

.,9 i

OPERATING STATUS Notes' I. Unit Name:

Cooper Nuclear Station

2. Reporting Period:

April, 1987 2381

3. Licensed Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe):

778 787

6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):
8. If Chariges Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

. 9. Power Level To Which Restricted,if Any (Net MWe):

10. Reasons For Restrictions. lf Any:

This Month Yr..to.Date

' Cumulative

~

~

11. Hours in Reporting Period 719:0 2.879.0

'112.488.0

12. Number Of Hours Reactor Was Critical 719.0 2.728,1

^ 84. 311. 3 0.0 0.0 0.0

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 719.0 2.643.9 82.895.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.' Gross Thermal EnerEy Generated (MWH) 1,400,688.0 5,162,056.0 162,629,400.0 473.209,._0 1.734,334.0 52.079:342.0
17. Gross Electrical Energy Generated (MWH)

~

18. Net Electrical Energy Generated (MWH) 456,534.0 1,670,806.0 50,177,304.0
19. Unit Service Factor 100.0 91.8 73.7
20. Unit Availability Factor 100.0 91.8 73.7
21. Unit Capacity Factor (Using MDC Net) 83.1*

76.0 58.4

22. Unit Capacity Factor (Using DER Net) 81.6 74.6 57.3 n.n 3.9 4.7
23. Unit Forced Outage Rate
24. Shutdowns Scheduled.Over Next 6 Months (Type. Date, and Duration of Each1:

l l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY l

INITIA L ELECTRICITY l

COMMERCIAL OPER ATION L

8705130128 870430 h

i PDR ADOCK 05000298

. :aa a

$ gl

("/77 i l

R PDR

i e t ~!,s.73 -.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-0298 CNS 1

UNIT 5-8-87 DATE K. E. Sutt'on Y

COMPLETED BY (402)825-3811 TELEPHONE l

MONni April, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 9 1

523 686-37 524 686

_2 18

~

482 589 3

9 524 679 4

20 5

503 733 21 526 707 6

22 527 696 7 -

33 8

526 697 24

~

526 700 9

25

~

607 601 ~

to 6

721 696 11 27

. 12' 603 747

,g 697 705 13 716 703 18 3g 707

-15 3_

686 16 INSTRUC110NS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

- '-i

~ /.J Lv.t _m, c,,2_-

.. m, u A.g

4 UNITS!!UTDOWNS AND POWElt REDUCll0NS DOCKliT NO'.-

050-0298-UNIT N AME CNS DA1E ' 5-8-87 t

COMPLETED ljy '

K.E.

Sutton REPORT A!ONTil April.1987 :

q ELEPilONE (402)825-3811 i.

's ui 5 E

5 _y 5

9_E3 1.icensee

,E -r,,

g^~.,

Cause & Corrective e

r.

  • y"-

9'l' I.

ea 4

.5 5 a:

1. vent u?

o g' Action to H

$E cE j15 g Iteport 8:

E0 jU p,cvent Recurrence I

6 (None during this re sort period.)

i I

l e

i 2

3

'4 -

F' 3

F: Forced Itesson:

Method:

/. -

Exhibit 8 Instructions S: Scheduled A !!quipment Failure (Explain) 1 hlanual

- for Pieparallon of Data 11 Maintenance of Test 2 hlanual Scram, lintry Sheets fm 1.ieensee 4

  • C Itcfueling 3 Automatle Seeam.

livent Itepm (LI:lti File INtilll:G.

)

D Itegulatory itestriction 900ther (lixplain) 0161) li Operator Training & License !!xaminallon 4-Continued-I P Administrative 5-Reduced Load.

5 H

G. Operational Error (Explain)

Exhibitt SameSource L

P8/77) ll Other IExplain).

s i

t Operations Narrative Cooper Nuclear Station April 1987 Single Reactor Feed Pump (RFP) operation continued into the month of April

. with reactor power restricted to 68%.

On March 10, the."A" RFP. was placed back in-service and the plant returned to normal operation. A capacity. factor of 83.1% was achieved.for the month.

?

--a~

-w r w n

~-r-,+

,,e---.-

COOPER NUCLEAR STATION Nebraska Public Power District

" "

  • 0tE"" 3"N?'tM;"ls"."^>',"^ "

u.

CNSS878154 May 8, 1987 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operation Status Report for April, 1987 Docket No. 50-298 Centlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report' for April, 1987.

The report includes Operating Status, Average Daily-Unit Power Level, Unit Shutdown Data, and a Narrative-Summary of Operating Experience.

Should you have any comments or require additional information regarding this report, please contact me.

Sinc ely,

/

.[,

orn Division Manager of Nuclear Operations GRH:drf Enclosure cc:

G. D. Watson w/ene.

R. D. Martin w/ enc.